CIPRIAN ILIE
PERSONAL DATA:
Last Name : Ilie
First Name : Ciprian
Gender : Male
Address : PLOIESTI, ROMANIA
Phone no. : +407********
Email : *******.****@*****.***; *******@*****.***
Date of Birth : 18 November 1969
Citizenship : Romanian
Marital Status : Not married
Education:
- Petroleum and Gas University–Ploiesti 1989-1994, Faculty of Mechanic and Electrical
Engineering - Department: Technological Equipment for Oil&Gas Industry
- High School N 1 Ploiesti - 1984-1988 Mechanical Department
Languages: Romanian, English
Special Fields of Competence:
AutoCAD 14/2009 (Autodesk drafting license, 13 years experience),
MicroStation (company training and 6 month experience),
AutoPIPE (by myself training),
Unigraphics (3D) (company training and 1 month experience),
Advanced Pressure Vessel (company training and 1 month experience), Microsoft Office XP,
EXPERIENCE (14 years):
- Nov. 2006 to Nov. 2008 Company: TECNOMARE Kazakhstan Branch (ENI Group).
Position: Piping Design Engineer (location - Aksay, Kazakhstan, customer: Karachaganak
Petroleum Operating BV )
- Project: WASTE MANAGEMENT COMPLEX”:
Layout drawing, Piping general arrangement; Isometric piping drawings; Piping Support
general arrangement;
Site surveys;
Pipe support details;
Material Take-of.
1
- Project: LIQUID MUD PLANT MODERNISATION AT WASTE MANAGEMENT
COMPLEX”:
Layout drawing, Piping general arrangement; Isometric piping drawings; Piping Support
general arrangement;
Site surveys;
Pipe support details;
Material Take-of.
- Project: REMOTE MANIFOLD J NEW MANIFOLD STATION J2”:
Layout drawing, Piping general arrangement; Isometric piping drawings; Piping Support
general arrangement;
Site surveys;
Material Take-of.
- Project: UPGRADE OF UNIT-3 CLOSED DRAIN SYSTEM - Shut-Down and After Shut-
Down:
Layout drawing, Piping general arrangement; Isometric piping drawings; Piping Support
general arrangement;
Site surveys;
Pipe support details;
Material Take-of.
- Project: WASTE MANAGEMENT COMPLEX - PHASE 3 UNDERGROUND
SYSTEM”:
Layout drawing, Piping general arrangement; Piping Support general arrangement;
Site surveys;
Isometric piping drawings;
Material Take-of.
- Aug. 2006 to Nov. 2006 Company: EPSTEIN ARCHITECTURE & ENGINEERING.
Position: Mechanical Engineer (location - Bucharest, Romania)
- Project: PETROM Oil Station - Romania:
Preparation mechanical arrangement and details drawings (piping, tank, other items),
BOQ's for Oil Station.
- Project: ALBOTESTI TANK FARM for PETROM - ROMANIA:
Mechanical Superviser:
o Checking the documentation and drawings in tender package and detail design
engineering for inconformity and absence of information.
o Preparation of Technical Bid Evaluation for pumps, compressors and valves.
2
- Jan. 2006 to Jun. 2006 Company: I.L.F. - CONSULTING ENGINEERS ROMANIA BRANCH OF
GERMAN COMPANY.
Position: Mechanical Engineer and CAD Supervisor (location - Lahore, Pakistan, period-3
months)
- Project: Engineering & Project Management Services for Qadirpur Compression Project,
Front End Engineering and Design Package for the new Compression Station and Gas
Gathering System – Pakistan:
Preparation, checking and modification - piping drawings, civil arrangement and details
drawings, electrical drawings, process & instrumentation diagrams for Compression
Station and Gas Gathering System.
Supervision, training and implementation ILF CAD standard .
- Sept. 2005 to Jan. 2006 Company: ABB Process Solutions & Services SpA COMPANY.
Position: Piping Engineer and Responsible Technical Office (location – Bir Berkine, Algeria)
- Project: "TRAITEMENT D'HUILE DES CHAMPS DE BIR BERKINE ET BIR BERKINE
NORD"
Prepared the task documentation for the fabrication for all equipment (tanks, heat
exchanger, columns, scrapers, and boiler); prepared, checking and modification piping
isometrics, support piping details, pipe rack, platform scraper; Supervision installation
work; Solving the technical problems which appear during installation work.
- Sept. 2002 to Sept. 2005 Company: I.L.F. - CONSULTING ENGINEERS ROMANIA BRANCH OF
GERMAN COMPANY.
1. Position: Mechanical Design Engineer (location - Baku, Azerbaijan, period-18 months)
- Project: Baku-Tbilisi-Ceyhan (BTC) 42” Crude Oil Export, Pipeline Project – Azerbaijan
Section, client-British Petroleum:
Preparation piping drawings, pipe isometrics, MTO’s, (and other documentation) for
Pump Station and Block Valve Station.
Elaboration of combined mechanical arrangement drawings, as-build issue of drawings
and documents.
Preparation of platform scraper arrangement and details drawings.
Preparation of support piping details and support valve details drawings.
Preparation of civil arrangement, formwork and reinforcement drawings, as-build issue
of drawings.
- Project: The 42" South Caucasus Gas Export Pipeline project (SCP) - Azerbaijan Section,
client-British Petroleum:
Elaboration of data sheets, bidder list, bid evaluation report, technical clarifications
including weighing of the criteria and tender evaluation report for Valves.
Preparation of P&IDs and elaboration piping drawings, pipe isometrics, MTO’s for
Pump Station and Block Valve Station.
Elaboration of combined mechanical arrangement drawings, as-build issue of drawings
and documents.
3
Elaboration of support piping details and support valve details drawings.
Elaboration of civil arrangement, formwork and reinforcement drawings, as-build issue
of drawings.
Elaboration of platform scraper arrangement and details drawings.
2. Position: Project Engineer (location - Ploiesti, Romania)
- Project: “Engineering to merge East Area Project (EAP) and Wellhead Revamp Project
(WRP) ” for ExxonMobil Company, Nigeria
Integrate process design and P&IDs to fully integrate WRP and EAP project.
Integrate material selection diagram and cross reference list for instruments tags,
equipment tags, and valves to EAP project.
Merge demolition P&IDs and line list and SAFE chart to WRP and EAP project.
3. Position: Piping Engineer (location - Ploiesti, Romania
- Project: “38 Wellhead Platforms Revamp Project” for MOBIL Company, Nigeria
The piping layouts and isometrics detail and bill of materials.
The route piping establishment and drafting for pipelines: process hydrocarbon, natural
gas, vent, instrument gas, power gas, drain and water.
- May 2000–Sept. 2002 Company: PROGECO ROMANIA s.r.l.
- Position: Vessel Pressures and Piping Engineer
Vessel Pressures calculation sheet and drafting, piping layout, isometrics and materials
list for Compressor - Nuovo Pignone;
Plant arrangement and piping connections for Gas Turbine;
Piping layout, isometrics and materials list for Valve Gas;
Platform and steel construction
- October 1994-May 2000 Company: CHEMICAL EQUIPMENT WORKS UZUC PLOIESTI
- Position: Project Engineer
Vessel Pressures and other types of equipment (tanks, heat exchanger, columns,
condensers) calculation sheet with software “Advanced Pressure Vessel” and ” B-JACK”
(acc. ASME Code Sect.VIII Div.1, Sect. I, TEMA) and drafting with AutoCAD. Perform
software for any calculations in Turbo Pascal; establish the dimensions for equipment in
order to send better offer to clients.
October 1994-May 1997, Position: Technologist Engineer for the Fabrication
Department and Technical Assistance Engineer (and Co-ordinated a team of 20 workers).
In this period my job involved: Providing the workshop with materials; Application of the
technical operations for example: debiting, chamfering, welding and the assembling of
components); The execution of the debiting programs for the numeric command debiting
machine; Prepared the task documentation for starting the fabrication for plates; Establish
the most economic way to use the plates in the cutting process; Solving the technical
problems which appear during fabrication.
4