Post Job Free
Sign in

Engineer Design

Location:
8904
Posted:
March 09, 2010

Contact this candidate

Resume:

Bhavbhuti U. Pandya

**, ****** **** **,

Highland Park

NJ 08904

M : 973-***-****

Email Add : ************@*****.**.**

OBJECTIVE

“To work for a well reputed organization and gain excellence in design.”

EDUCATION

Graduation

Bachelor Of Engineering ( Mechanical Engineer)

Govt. Engg. College, Modasa

Hemchandracharya North Gujarat University (2002-2005)

Patan, Gujarat, India

Under-Graduation

Diploma Mechanical Engineering

Nirma Institute of Diploma Studies, (1999-2002)

Ahmedbad, Gujarat, India

MAIN SUBJECTS

DURING GRADUATE STUDIES

Computer Aided Designing (CAD)

Computer Aided Manufacturing (CAM)

Strength of Materials

Machine component Design

DURING DIPLOMA STUDIES

Computer Aided Designing (CAD)

Computer Aided Manufacturing (CAM)

COMPUTER SKILLS

AutoCAD 2006 and lower versions

Pro/Engineering 2001 WF-3.0,4.0, with Windchill

Pro-Mechanica, ANSYS, Hypermesh 9.0

Pro-Manufacturing

Catia V5- R16.0

MasterCAM – 8.0

C,C++, MS office tools

PROJECTS

DURING GRADUATE STUDIES

Design, Simulation, and Optimization of Die and Punch Manufacturing

DURING DIPLOMA STUDIES

Design and manufacturing of cam for Automate.

EXPERIENCE

1 ALLEN GEARS LTD.

Epicyclic and Parallel Shaft Gearbox Designing and Manufacturing. (UK)

Designation : Design Engineer (Contract)

Epicyclic Gearbox Engineering Dept.

: 6th May - 26th Nov 2008

Duration

Design based on Multi stage Planetary Gear train combines with parallel

shaft gear drives.

Design of Hydrostatic Bearings (offset half) followed by drawings.

Designing and Modeling of castings and machining components which

includes gearbox casing (cast & fabricated), internals, labyrinth covers,

followed by drawings.

Test Rig Arrangement for the Gearboxes, Solid modeling, Detailing.

Production of GA modeling and drawings with customer specifications on.

Projects worked on Man TURBO, SATURN (Gas turbine gear box)

• Modeling on the Pro-Engineer Wildfire 3.0-4.0

2 ROMAX TECHNOLOGY LTD.

Wind Turbine Gearbox Designing consultancy. (UK)

Designation : Design Engineer (Contract)

W ind Turbine Gearbox Engineering Dept.

: 26th Nov. 2007 – 30th April 2008

Duration

Responsible for the Lubrication system design for the 2MW and 3MW

wind turbine Gear box.

Design based on Multi stage Planetary Gear train and Parallel shaft

Helical Gear stage.

Design of Forced Lubrication System which includes

Calculation for the bearing power losses and gear mesh losses.

Calculation for the Flow rate of oil for the whole system at every stage

and spot of gearbox.

Schematic modeling for the pipe work for the whole system.

3-D modeling of the system in the form of whole lubrication system

package.

Modeling on the CATIA-V5 R15. Use of Hypermesh & Ansys for analysis.

Assembly Drawings for the whole lubrication system.

Designing and Modeling of castings and machining components which

includes gearbox housing, internals, labyrinth covers, followed by

drawings.

Preparing the Report for the client company.

3 ELECON ENGINEERING CO. LTD,

Gear Division, Vallabh Vidyanagar. (India)

Designation : Design Engineer

Helical Gear Deign Dept

Duration : 2 year

To Generate & Update Gear Rating & Geometric Calculations.

Design & Development of Components of Helical & Spiral Bevel-Helical

Reducing Gear Drives such as

Gear Case – CI & Fabricated, Internals – Wheel & Pinion

Accessories – Covers / Oil seal / Key / Fan / Hold Back etc.

Base Frames for Gears & Motors

Forced Lubrication System

To carry out Bearing Calculation & Selection for Gear Internals.

To Develop & Release Dimension Sheets Containing Grinding Profile

Calculation & Corrections for Gear Internals.

Creating, Releasing & Updating Manufacturing Drawings with the help of

CAD Tools like Pro-Engineer, Auto-Cad.

Use of Hypermesh and Ansys for the analysis of gearbox casing and

other components, Use of Advance assembly and Surfacing on Pro E.

Creating & Releasing Bill of Material Using Oracle ERP System.

Design & Development of General Arrangement Drawings as per Clients’

requirement.

Submission, Updatation & Approval of GA Drawings as per Client’s

Requirement / comment.

To Maintain History Records of Gears Supplied & Release of Spares as

per requirement rose from concern clients. Use of Windchill.

4 HARSHA ENGINEERS LTD (INDUSTRIAL Training)

EOU Division, Moraiya (India)

Designation : Tool Rebuild Engineer

Cut and Carry’s Tool Rebuild Dept

Duration : 0.5 year

Responsible to prepare PPAP samples for the TIMKEN, SKF, FAG,

NSK, KOYO etc.

Development of new toolings for new taper roller bearing cages.

As a part of KAIZEN team, cage transferring system developed from one

compound die station to another. Generating FMEA and DFMEA.

System Includes Finger (Fixture) and its attachment which in turn helped

to improve the SPM of the press machine.

Responsible to prepare and maintain History cards on each receipt of

tooling from production shop.

PERSONAL

Languages Known : English, Hindi, Gujarati

I am permanent resident (Green card Holder) of USA

I am willing to relocate.

ACHIVEMENTS

I got 2-Gold medals and a bronze medal during diploma studies in

Mechanical Engineering.

I got the RANK-Award from AirIndia. (Indian aviation company)



Contact this candidate