RESUME
NAME SYED ABDUL JALEEL
:
**th September 1972
DATE OF BIRTH :
NATIONALITY : Singaporean
RESIDENT STATUS : USA Immigrant
MARITAL STATUS : Married
:
ADDRESS Block 51, Lengkok Bahru Apt # 04-267 Singapore 150051.
PHONE NO : H/P +65-83221705
E-MAIL : ******@*******.***
EDUCATION : Master of Science (MSc Structure) from NUS University of Singapore
Bachelor of Engineering (B.E Civil) from N.E.D university of
Engineering&Technology Pakistan in 1998 secured First Division.
Bachelor of Science (B.Sc) From Karachi University secured First
Division.
PROFESSIONAL MEMBERSHIP: Member of Pakistan Engineering Council.
Canadian council of professional Engineer
COMPUTER/SOFTWARE SKILLS: SAFE ANALYSIS, ETABS, RAPT, PROKON, PCACOL, STAD PRO
& ADOSS, MICROFEAP I & II, SAP 2000, FASTRAK. TEDS,
Microsoft Office, MS Project, Word Perfect, Auto CAD 2000.
LANGUAGES English (Fluent)
:
EMPLOYMENT RECORD
Period : October 2007 to Date
Employer : Surbana International Consultants
Position Held : Senior Structural Engineer
PROJECTS: Few key Projects are listed below.
2
BAB-UL-QASAR 5 START HOTEL & SERVICE APARTMENT
Proposed Five Star hotel and Service apartments in Abu Dhabi, comprising of
2 towers of 38-Storeys each with 4 basement car parks & offices, Podium block
with 6 storeys of offices and retail area. The estimated cost of project is S$500
millions.
Structural system consist of Flat slab, RC & PT beam slab system, Retaining wall,
shear walls, Transfer beams at 6th level to carry the shear wall load, bored piles
with raft foundation .Temporary retention system consists of diaphragm wall.
GRAND CORNICHE 5 STAR HOTEL (ABU DHABI, UAE)
Proposed Five Star hotel in Abu Dhabi, comprising of 1 towers of 37-Storeys
with 4 basement car parks & offices, Podium block with 4 storeys of offices and
retail area. The estimated cost of project is S$250 millions.
Structural system consist of Flat slab, RC & PT beam slab system, Retaining wall,
shear walls, Transfer Floor at 5th level to carry the shear wall load, bored piles
with raft foundation .Temporary retention system consists of diaphragm wall.
AL-BATEEN WHARF (ABU DHABI, UAE)
Proposed 4 Block of F&B, 1 block of retail, club house, fisherman community,
dry stack and carpark in Abu Dhabi.
The estimated cost of project is S$360 millions.
Period : Jan 2006 to Sep 2007
Employer : Meinhardt Singapore Pte Ltd.
Position Held : Senior Structural Engineer
PROJECTS: Few key Projects are listed below.
BUSSINESS AND FINANCIAL CENTRE
Proposed Office Development comprising 2 towers of 32/47-Storeys, with 2 basement
car parks, with underground pedestrian network and retail facilities, Podium block with
6 storeys of carpark and 3 storeys retail area. The estimated cost of project is S$600
millions.
Structural system consist of Flat slab, RC & PT beam slab system, Retaining wall,
shear walls, metal roof and bored piles with raft foundation is used as a foundation.
Temporary retention system consists of perimeter secant piles, internal sheet piles &
ground improvement layers.
RAMADA JUMEIRA HOTEL DUBAI, UAE
Proposed Ramada Jumeira 5 star Hotel Development comprising of 7-Storey with 3
basement car parks & offices, Swimming pool, Clubhouse, and communal facilities.
The estimated cost of project is S$150 millions. Structural system consist of Flat slab,
RC beam slab system, Transfer beams at the 1st Storey level to carry above storey
loads, Retaining wall, shear walls, metal roof and raft foundation was used.
3
EVELYN CONDO AT EVELYN ROAD
A.C checking for the proposed Condominium housing development comprising 2
Blocks of 33-Storey residential Apartment with basement car parks, Environmental
Deck, Swimming pool, Clubhouse, and communal facilities. Structural system consist
of Flat slab, RC beam slab system, Transfer beams, Retaining wall, shear walls, bored
piles with raft foundation is used as a foundation.
Description of Duties & Salient Features for the above Projects:
Structural Analysis & Design of the building with different flooring systems such as Flat Slab, Flat Plate,
•
and RC & Post tension beam Slab system.
Designing of Heavy transfer Beams to cater for the High Rise building loads.
•
Design for the Pre-Stress & Post tension beams & Slabs.
•
Plate Analysis and design for the raft foundation and for General Floor Level.
•
Earthquake, Gravity, Notional & Wind Load Analysis for the building.
•
Earthquake Resistant Design and detailing of Connections.
•
Detail designing for the steel and composite structures.
•
Design Foundation Elements such as RC Bored Piles, Driven Piles and Raft Foundation.
•
Monitor project status, authority submission Requirement and ensure timely drawing implementation in
•
assigned projects.
Detail checking and analyzing for the structure in connection with the accredited checkers.
•
Working within a multidisciplinary team culture involving Planning, organization, co-ordination.
•
Coordination with the client and other consultants and formulate action plan in resolving problems
•
associated with the preparation and their specific needs.
Resolution of technical problems encountered during planning and implementation of designs like
•
construction constraints, architectural requirements, by laws and fiscal limitations.
1ST August 2002 to 5th Jan 2006
Period :
Employer : Hainal Konyi(S) Pte Ltd, Singapore.
Position Held : Structural /Executive Design Engineer
PROJECTS: Few key Projects are listed below.
MARINE PARADE CONDOMINIUM HOUSING DEVELOPMENT
Proposed Condominium (Cote’d’Azur) housing Development comprising 5 Blocks
of 23-Storey Apartments with basement car parks, Environmental Deck,
swimming pool, clubhouse, and communal facilities. The estimated cost of project
is S$100 millions. Structural system consist of Flat slab, RC beam slab system,
Transfer beams at the 1st Storey level to carry the whole structure, Retaining wall,
shear walls, metal roof and bored piles with pile caps was used as a foundation.
PETALS CONDOMINIUM AT HILL VIEW
Condominium housing development comprising 6 blocks of 10 storey apartments
(total 270 residential units) with basement car parks and communal facilities on lot
239-9 & 239-10 mukim 10 at hill view avenue-the petals condominium estimated cost
is S$80 millions. Structural system consist of Flat slab, RC beam slab system,
Transfer beams at the 1st Storey level to carry the whole structure, Retaining wall,
shear walls, metal roof and bored piles with pile caps was used as a foundation.
4
BUTTERWORTH LANE CONDOMINIUMS
Proposed erection of 5 blocks of 12-storey residential flat development with Basement car park and swimming
pool and other communal facilities at Butter worth lane estimated cost is S$ 10 millions. Structural system consists
of Flat plate, RC beams slab, Composite slab, transfer beams at the 1st storey level, retaining walls, shear walls etc.
POLICE COAST GUARD HEAD QUARTERS
Proposed erection of new 7 blocks of multi storey police head quarter and addition & alterations to the existing
building with the communal facilities at pulau brani estimated cost is S$100 millions. Structural system comprises
of Post tension Beams and slab, conventional RC beam slab system, hollow core slab, steel structure at various
locations and RC Bored and Driven piles was used as a foundation.
YONG AN PARK CONDOMINIUM
Proposed additions and alterations & change of use to the existing condominium play ground, recreation complex
guardhouse & entrance driveway to yong ann park on lot 795 ts 21 river valley road. Structural work comprises of
Strengthening of existing structure by using high tensile carbon fibre and steel structure for the new building with
Raft foundation.
CHINESE TEMPLE AT CHWEE CHIAN ROAD
Proposed Errection of a Temple comprising of 3 blocks of multistory building with the 2 Basements with the
carparks and Quarters at Chwee chian road (Queenstown planning area). Structural system consist of RC flat slab,
RC beam slab, Contiguous RC bored piles, Retaining walls, transfer beams, post tension beams, 15m high pagoda
with RC and Steel structure, bored piles and micro piles was used as a foundation.
NTU SCHOOL OF COMMUNICATION & INFORMATION
Proposed New 2 storey building, Extension of conference hall and additions and alterations works at NTU School
of communication and information. Structure work consist of Strengthening of existing structure, RC beam slab,
Bondek slab, metal roof, RC driven piles was used as a foundation.
VILLA REVIERA HOUSING DEVELOPMENT IN AN PHU
Proposed landed residential development with comminity facilities (villa riviera) in an phu, district 2, ho chi minh
city, Vietnam estimated cost is 50 million. Structural system consist of Flat slab, RC beam slab system, Transfer
beams at the 1st Storey level to carry the whole structure, Retaining wall, shear walls, metal roof and RC driven
piles with pile caps was used as a foundation.
Description of Duties & Salient Features for the above Projects:
Structural Design & Analysis, calculation & Detailing for the Residential, Industrial & commercial
•
buildings.
Analysis & Design for the different floor systems like Flat Slab, Flat Plate, Waffle Slab and RC Beam
•
Slab system.
Designing of Heavy transfer Beams at the Basement.
•
Analysis & Design for the Pre-Stress & Post tension beams & Slabs.
•
FEM Analysis of Deck Slab using plate Elements library in SAP 2000.
•
Plate Analysis and design for the raft foundation.
•
Gravity & Wind Analysis for the High rise buildings.
•
Earthquake Resistant Design and detailing of Connections.
•
Analysis & Design for the High rise steel structure building with truss members.
•
Design Foundation Elements RC Bored Piles, Driven Piles & Footings.
•
Monitor project status, authority submission Requirement and ensure timely drawing implementation
•
in assigned projects.
Detail checking and analyzing for the structure in connection with the Accredited checkers.
•
5
Working within a multidisciplinary team culture involving Planning, organization,
•
Co-ordination and Project Management for the Projects.
•
Resolution of technical problems encountered during planning and implementation of designs like
•
construction constraints, architectural requirements, by laws and fiscal limitations.
Experience of working with a Design Team, responsible for Development, Production and
•
implementation of integrated Structural Designs both as an individual and team leader.
Tendering & Cost evaluation for the competition / Design & Build jobs.
•
Coordination with the client and other consultants and formulate action plan in resolving problems
•
associated with the preparation and their specific needs.
Required to maintain all the ISO standards including the project quality plan for the projects.
•
5TH August 2000 to July 2002
:
Period
: Yeng Tong Construction Pte Ltd, Singapore.
Employer
:
Position Held Project Engineer
PROJECTS: Few key Projects are listed below.
ADDITIONAL RECLAMATION AT SOUTHERN SENTOSA COVE
Additional Reclamation at Southern Sentosa Cove is funded by Sentosa Development Corporation Government of
Singapore. The estimated cost of project is S$50 millions. Reclamation Area is about 10 Hector along the Sentosa
Golf course and Tanjong Beach. [The project has to meet the requirement of BS EN ISO 9002 in order to achieve
objective]
RECLAMATION AT CHANGI EAST AREA ‘A’ NORTH (TERMINAL 3)
Reclamation at Changi East Area ‘A’ north is funded by Ministry of National development Government of
Singapore. Estimated Cost of the Project is S$150 millions. Reclamation Area is about 90 HA.
RECLAMATION AT PULAU UBIN AND PULAU TEKONG
Reclamation at Pulau Ubin and Pulau Tekong is funded by Government of Singapore Estimated cost of the
Project is S$1750 millions. Reclamation area is about 3000 HA.
Description of Duties:
Worked as Project leader and responsible for all the construction activities.
•
Monitor the sequence of reclaimed area and resolved the technical problems.
•
Analysis & Design for the Structural items R.C & Steel and Alternative design proposals for the design
•
and build projects.
Design of Foundation elements such as RC and Driven Piles etc.
•
Construction of Granite Rock bund, Rock filters layer, Concrete Box and U drain.
•
Monitor the behavior of soil settlement including Soil investigation, Soil instrumentation monitoring.
•
Dredging and trimming works for the sand key.
•
Cost Estimation, Preparation of BOQ, monthly and quarterly progress reports.
•
Coordination with the Client and Consultants and formulate action plan.
•
Preparation of shop drawings and check the detailing before the construction.
•
Involved in the tendering for the other projects assisting the project manager.
•
1st May 1998 to AUG 2000
:
Period
Techno Consult Consulting Engineers in Association with Sir William
Employer :
Halcrow & Partners Ltd.
:
Position Held Design Engineer
6
PROJECTS: BALOCHISTAN COMMUNITY IRRIGATION AND AGRICULTURE PROJECT (BCIAP)
BCIAP is an IDA and Government of Nether land funded project of an estimated cost of US$38 millions. The
project aims at developing Irrigation/School Schemes with community participation at all levels in a gender-
sensitized environment. The scope of the work includes identification of different scheme, which are
economically viable and environmentally sound. Detail design of scheme including preparation of tender
documents and construction supervision. [The project team has to meet the requirement of BS EN ISO 9001 in
order to achieve Objective of BCIAP].
Description of Duties
Analysis & Design for the RC & Steel structural members for the school buildings & Bungalows.
•
Framing system composes of R.C.C dual system (Shear wall + Moment resisting Frame).
•
Scheduling project task and activities using MS Project 98.
•
Detailed Design & Analysis for the Hydraulic Structures of Perennial irrigation schemes.
•
Worked on detailed design of HATACHI KHERZAN (PIS) near Khuzdar on Mula river, MARA TANGI
•
(PIS) near Loralai on Mara Rud River & ISKALKU (PIS) near KALAT on Rustam jhal River and Achar
Wand near Khuzdar.
Design conduit channel, command area protection works, Flood protection works, Spurs Tamarix
•
protection works stone pitching gabion pitched embankments, designed intake Structure, channel lining,
Super passages, syphon. Preparation of BOQ, Engineer’s estimate and other related works.
Worked on detailed design of Designed Weir, intake structure, Syphon, Flood Protection Works, channel-
•
lining Super passages, Road culverts, aqueducts social structures like wuzu, washing and animal drinking
structure etc. Preparation of BOQ Engineer’s estimate and other related works.
REFERENCES:
Mr. Rizwan A Siddiqi (Vice President) Mr. Ashfaq Ahmed (Senior Engineer)
EBA Engineering, INC Baltimore MD Tadjer Cohen Edelson Associates, MD
Tel: 240-***-**** Tel: 443-***-****
AVAILABLITY : One month Notice period