Phillip Pulley
Chapmansboro, TN 37035
615-***-****: Home
615-***-**** Cell
Email: *********@*****.***
______________________________________________________________________________
Objective: Secure a position as a Technical Specialist/Quality Control Manager or Project Manager,
providing specialized skills, guidance, training and oversight on K-span and construction
projects worldwide.
Experience:
2008 to Present ECCI, Iraq, Quality Control Manger / Subject Matter Expert (K-Span).
Provides direct supervision and management of subcontractors crews during K-span
Production and Construction.
Developed quality control guidance for K-span production and construction.
Train and instruct Subcontractor personnel on all aspects of K -span production and
construction.
Provides advice and guidance to design engineers during design phase of K-span
projects.
1997 to 2008 M.I.C. Industries, Inc., 390 Airport Rd. Winchester Va.,
Senior Technical Support Specialist & Training Course Development Manger.
Develops customer training curriculum for every machine manufactured by M.I.C.
Industries, Inc.
Delivers customer training, factory and on-the-road, for ABM /UBM and insulation
equipment.
Performs project planning and construction management of customer training projects,
insuring the proper employment and efficient use of equipment during construction
projects for the purpose of training crews.
Provides technical support for the maintenance, troubleshooting and repair of all M.I.C.
manufactured equipment. Performs equipment inspection and evaluation of equipment
for the purpose of determining operational readiness.
Provides customer technical support for parts ordering, remote troubleshooting.
Provides building design, structural analysis and material estimating utilization of
COSMIC and M.I.C.-Prosoft software.
Delivers instruction and training for Design Engineers on the use of COSMIC and
M.I.C.-Prosoft software.
1986 to 1997 U.S. Navy Seabee, (Pay grade E-7 & E-8)
NMCB FOUR, Alfa Company Chief, (E-8)
Supervised all E-7s & E-8s who operated construction Maintenance shops,
construction equipment motor pool & horizontal construction projects.
ACB-2 Little Creek Va. (E-8)
Battalion Operations Chief: Provided direct support and planning for Battalion
operations and deployments. Battalion personnel skills manger.
Battalion Training Chief: Provided direct support for the mana gement of all training
for the Battalion. Directly supervised the Battalion weapons training program.
2nd NCB Roosevelt Rhodes, Puerto Rico, Mineral Products site Manger (E-7)
Managed rock quarry, rock crusher & mineral products and hot mix asphalt plant
operations.
Provided training for battalion crews in blasting, quarry operations, rock crusher
operation and hot-mix asphalt production.
Supervised a soils lab responsible for the quality control and adherence to
specifications for mineral products made on site.
1980 to 1986 U.S. Navy Seabees, (pay grade E-5 & E6)
Project Supervisor & Project crew leader
Planed and supervised horizontal construction projects.
Preformed planning and estimating for construction projects.
Preformed as shop head and division officer.
1977 to 1980 U.S. Navy Seabees, (pay grade E-1 to E4)
Heavy equipment operator
Operated heavy equipment, bull dozer, front loaders, road graders backhoe and
excavators.
Operated automotive equipment, cargo truck, tractor trailers.
Operated material handling equipment and specialized construction equipment.
Forklifts, small cranes, asphalt distributer, paving machine, steel wheel and rubber
wheel rollers.
Education:
High School Grad
Attended Classes Southern Ill University (Occupational Education)
Completed Various Military Leadership Training
Completed Quality Control Mangers Course
Complete OHSA 10 hr Safety Course
Computer Skills:
Skilled in the following computer software. Microsoft Office (word, excel. Access.
Power point), Microsoft Project, M.I.C. Prosoft, AutoCad
Experience from Feb 2008 to April 2009 In Iraq.
4500.038 TO 38 - New Temporary K-Span Construction for the 7th Division, 2nd Battalion, 1st Brigade, Light
Infantry Battalion, Akashaat, Iraq. Constructed 11 large Kspan Buildings.
Provided expert management and supervision of the subcontractor during the construction and insulation
of all K-span building. Monitored the construction scheduled and provided guidance to all a rapid
erection of all K-span buildings.
Monitored Q.C. efforts to insure all construction was in compliance with requirements.
Provided Technical Training to Subcontractor perso nnel on UBM equipment operation, Insulation
Machine Operation and construction methods.
4500.039 TO 39 - New Temporary K-Span Construction for the 7th Division, 2nd Battalion, 4th Brigade, Light
Infantry Battalion, Qa'sr Amij, Iraq. Constructed 11 large Kspan Buildings.
Provided expert management and supervision of the subcontractor during the construction and insulation
of all K-span building. Monitored the construction scheduled and provided guidance to all a rapid
erection of all K-span buildings.
Monitored Q.C. efforts to insure all construction was in compliance with requirements.
Provided direct QC management to the project for a temporary period.
Provided Technical Training to Subcontractor personnel on UBM equipment operation, Insulation
Machine Operation and construction methods.
4500.026 TO 26 Construct 5th Division, IA 2/2/5 Light Infantry Battalion, FOBs Lion/Gabe, Iraq. Constructed 4
large Gable K-span buildings.
Provided expert management and supervision of the subcontractor during t he construction and insulation
of all K-span building. Monitored the construction scheduled and provided guidance to all a rapid
erection of all K-span buildings.
Monitored Q.C. efforts to insure all construction was in compliance with requirements.
Provided Technical Training to Subcontractor personnel on UBM equipment operation, Insulation
Machine Operation and construction methods.
4500.041 TO 41 - Completion of Construction - Iraqi Air Force and Flight Training School Kurkir
Regional Air Base KRAB. Constructed 26 large K-kspan buildings and one conventional
buildings. Use the M2 foam panels for interior finish of all buildings.
Provided expert management and supervision of the subcontractor during the construction and
insulation of all K-span building. Monitored the construction scheduled and provided guidance
to all a rapid erection of all K-span buildings.
Monitored Q.C. efforts to insure all construction was in compliance with requirements.
Provided Technical Training to Subcontractor personnel on UBM equipment operation,
Insulation Machine Operation and construction methods.
Summary: During the year in Iraq I spent time providing Project Management Skil l along with Quality Controls. I
was the only person on site with the “know how” to construct K-span building. During the building erection phase I
control the work schedule and supervised all work crews involved in building production and erection.
I trained and monitored all crews involved in spray on insulation “cellulose & Polyurethane”
I was also involved in insuring the materials used in K -span construction met the required specification. I interacted
with ECC engineers and Subcontractor engineers during the design phase to insure that designs could be
constructed. I work as a liaison between the manufacturers of K -span equipment and insulation equipment to insure
all maintenance and warranty work was completed on equipment insuring a constant work effort and no major down
time due to equipment failure stopped the work.