RANDY K. CALLAHAN
*** ***** ******* ***** 330-***-****
Akron, Ohio 44311 Email: *************@*******.***
________________________________________________________________________
Objective
I am seeking a position as an Electrical Controls Engineer with responsibility for
the installation, automation and troubleshooting of factory equipment.
Qualifications Summary
Experience in electrical repair and upgrades
•
Experience in managing and implementing controls projects
•
Experience in electrical controls, factory automation, PLC/HMIs, robotics
•
Areas of Strengths
Robotics, factory automation and vision systems
•
Troubleshooting plant equipment and failure analysis
•
PLC and PAC controls, networking and programming
•
Electrical power, protection, distribution and monitoring
•
Plant facility and equipment electrical design, installation, commissioning
•
NEC and OSHA regulations; machine safety and arc flash protection standards
•
Technical Skills
A/B PLCs: Control Logix, SLC500s, PLC5s, RS Logix 5/500/5000
•
A/B Networks: Control Net, Ethernet I/P
•
A/B HMIs: Factory Talk ME/SE, RSView Studio
•
A/B Programming: Structural Text, Phase Manager
•
A/B Drives: Power Flex 4/40/70
•
AutoCAD Electrical 07, MS Office/Project/Excel
•
Education
Bachelor of Science in Electrical Engineering – Carnegie Mellon University
•
Certificate of Completion – Rockwell Software – Structural Text Programming
•
Certificate of Completion – Rockwell Software – Factory Talk SE Programming
•
Certificate of Completion – Systech – Vision System
•
Experience
11/07-9/09 GOJO Industries, Maintenance Supervisor
•
Led team of twelve maintenance mechanics and engineering
technicians with responsibility for coordinating the troubleshooting
and repair of packaging equipment and batch processing systems.
Promoted to supervisor and trainer of new engineering technicians.
Reprogrammed vision systems to improve capabilities. Led the off
shift plc programs and vision systems troubleshooting.
12/06-11/07 Haven of Rest Ministry, Residential Discipleship Program
•
Completed life application bible study course. Worked in client
services center performing assigned duties. Participated in 7
community banquets. Shared personal testimony with the
Leadership of Akron Group, Arlington Church of God, Carroll
Bible Church, Twinsburg School System, the Russ Reid
organization and on the Haven of Rest radio show and Voice
magazine.
8/06–11/06 Republic Engineered Products, Electrical Maintenance Supervisor
•
(contract) Supervised plant electricians and coordinated electrical contractors
for routine preventive and project maintenance work. Assisted
electricians in troubleshooting multi-strand bar caster machine.
4/06-06/06 Burke Industries, Electrical Plant Engineer
•
(contract) Implemented process control logic changes and reliability
improvements for new automated rubber/vinyl trimmer machine.
5/05-11/05 Plastech Engineered Products, Maintenance Manager/Supervisor
•
Managed all plant facility and production equipment maintenance.
Planned and executed maintenance repairs and projects.
7/04-12/04 Automated Packaging Systems, Plant Facility Engineer/Supervisor
•
Responsible for facility and production equipment. Led capital
equipment project to rebuild color printing press.
1/03-12/03 Nestle USA, Maintenance Supervisor/CDM Facilitator
•
Supervised maintenance mechanics and technicians. Facilitated
continuous improvement teams to eliminate technical breakdowns.
9/02-12/02 International Truck & Engine, Electrical Maintenance Supervisor
•
(contract) Supervised and assisted electricians in troubleshooting engine
block machining and assembly operations.
4/01-07/01 Daimler Chrysler, Electrical Maintenance Supervisor
•
(contract) Assisted electricians in troubleshooting automated metal stamping
machines and robotic assembly systems.
7/93-04/01 Ford Motor Company, Plant Superintendent/Electrical Engineer
•
Responsible for all power distribution, electrical control system
integration and robotic assembly operations for new plant.
1/89-07/93 LTV Steel, Electrical Project Engineer
•
Led the installation and commissioning of a retrofit project to
upgrade the electrical controls/drive system for a processing line.