Post Job Free
Sign in

Power Plant Electrical

Location:
Monroe, MI, 48161
Posted:
March 09, 2010

Contact this candidate

Resume:

PHILIP ROBINSON

*** ****** ***. ******, **. *****

734-***-****

**********@*****.***

Professional Experience

Electrical Field Engineer/Electrical Superintendent

Washington Division of URS Corporation

June 2007-Present

Electrical Field Engineer; provide construction with engineering support for Units 3 -4 Flue Gas Desulphurization(FGD)

Project at the Detroit Edison 3200MW Coal Fired Power Plant in Monroe, Michigan.

Initiate Construction Change Notices (CCN’s) for approval

Provide answers to submitted Request for Information Forms (RFI’s)

Provide craft with specific installation procedures for various tasks

Interface with Civil/Structural engineering for cable tray support design

Review and comment on subcontractor drawings, in house specifications, and vendor documentation

Write material requisitions for procurement of materials by field engineering

Provide craft with installation details for electrical installations

Provide interpretation of home office engineering design drawings and documentation

Organize plant outage tie-ins and work scope for construction superintendents

Interface with customer, construction, and engineering for successful outag e scheduling

Troubleshoot Switchgear, MCC, and DCS wiring issues.

Ensure proper equipment and structure grounding.

Aided in successful completion of Unit 3 and 4 electrical outage scopes of work, scheduling, material procurement,

and installations of electrical components and equipment.

Provide craft assistance with drawing clarification and cable/conduit routing and re -routes.

Aided in all field designed cable, conduit, cable tray, equipment locations, and Fiber Optic installations.

Assisted Plant Operations/Protection Leaders with design documentation in order to provide safety to personnel and

equipment through the DTE Red Tagging procedures.

August 2001-June 2007

Electrical Foreman for Units 1& 4 Selective Catalytic Reduction (SCR) Projects, Foreman for Unit 2 - 750MCM cable bus

replacement, General Foreman for Unit 2 Maintenance Outage, General Foreman and Electrical Superintendent for Unit

3 SCR Project, at the Monroe Michigan Detroit Edison 3200MW Power Plant.

Supervise 10 man crew of electricians for various tasks including:

A. Cable bundling, cable pulls, and cable rigging.

B. Conduit installation design, routing, duct bank installation.

C. Cable tray routing and installation.

D. Control Cabinet, DCS Cabinet, MCC, and Switchgear equipment installations.

E. Temporary power and lighting applications including power pack location and installation, welding

machines, portable generators, and air compressor power requirements.

F. Cable terminations for MCC, Switchgear, Power Distribution Panels, Heat trace, DCS, permanent power

and lighting, controls.

G. Low Voltage, Medium Voltage, and High Voltage Equipment and cable installations.

Provide detailed instruction, materials, supplies, information, tools, and daily safety analysis for crews.

Provide instruction, layout, and design for Electrical Craft Foreman.

Coordinate with other disciplines to ensure work is done safely and proficiently.

Order Materials

Provide detailed instruction to General Foreman

Plan work assignments 3 weeks or more in advance for continual job progress.

Coordinate with Field Engineers for resolution of technical/design issues.

Work with scheduling department and project controls to meet deadlines and milestone dates.

Provided safety awareness instruction and assisted directly with maintaining safety of personnel and equipment as a

certified Protection Leader at the DTE Monroe Power Plant site.

Coordinated with Startup Manager to successfully complete tasks for timely turnovers.

Worked closely with the Project Manager, Site Manager, Safety Manager, Engineering Manager, and Construction

Supervisors to manage the successful electrical completion of the Unit 3 Selective Catalytic Reduction Project (SCR)

June 1996-July 2001

Traveling Journeyman Electrician at the Flint, Michigan GM Truck and Bus Plant. Responsible for testing, inspection,

troubleshooting, and resolving issues with control wiring, PLC, conveyor system and components.

1997 Traveling Journeyman Electrician at GM Headquarters located in the Renaissance Center Downtown Detroit,

Michigan. Installed CAT 5E cabling and responsible for testing cabling, troubleshooting, and resolving all issues found

throughout the system. (Motor City Electric)

Journeyman Electrician at Fermi Nuclear Power plant worked with Engineering to install PIP cables and resolve

grounding issues, temp power and lighting, and various electrical tasks including conduit, wiring, cabling terminations.

Electrical Foreman GM Hydromatic Automotive plant Toledo Ohio during scheduled maintenance outage.

September 1990-June 1996

Performed various duties as an electrical apprentice on various job sites ranging from light commercial to heavy

industrial. Tasks involved identifying, locating, and verifying proper materials for tasks. Installing conduit, wiring,

equipment, components, for power and lighting needs. Team concept is stressed and expected in performance of work

activities. Layout of conduit runs, cable pulls, circuitry, cable tray, devices, lighting and lighting accessories as required.

Ohio Bell telephone company as an apprentice, performing light commercial electrical installations, fire alarm system.

Apprentice Electrician at the Toledo, Ohio Jeep Facility on the new Dakota Line.

Nabisco industrial facility in Toledo, Ohio performing various electrical duties as an apprentice electrician.

Commercial electrical installations at the Downtown Toledo, Ohio Federal Building.

20 Month training as apprentice through Local Union # 8 at the Oregon, Ohio Sun Oil Refinery.

Completed 5 year Union apprenticeship program(Local Union # 8)

Licensed Electrical Inside Wireman(IBEW) in Toledo, Ohio, Licensed Journeyman Electrician in the State of Michigan,

and Licensed in the State of Ohio for Fire alarm systems

Education

Continuous improvement after completion of Apprenticeship program through Union offered Journeyman

Education Classes, to include:

1. Motor Controls – September 1999 – October 1999

2. Transformers – November 1999 – December 1999

3. City of Toledo and State of Michigan National Electrical Code updates. 1996-2008

Training/Certifications

Completion of 5 year union electrical apprenticeship program(1991-1996) Journeyman Inside

Wireman(IBEW Local Union # 8)

Completion of Labor/Management Sponsored Safety Units 1-4, April 1996

10 Hour Occupational Safety and Health Administration (OSHA) training in Construction Safety and

Health

Washington Group International 2-Day Foreman Training – September 2007

Skills

Microsoft Word, Excel, and Power Point.

Documentum, Smart Plan Review, Cable Management Programs

References

References are available upon request.



Contact this candidate