Post Job Free
Sign in

Project Manager Construction

Location:
Point, TX, 75472
Posted:
March 09, 2010

Contact this candidate

Resume:

Scott R. Abele

*** *** **** ****

Point, TX ***** Scott R. Abele

903-***-****

***********@*******.***

Construction Superintendent

Experience

• More than twenty years in various aspects of commercial and residential construction

with a focus on Public, Hospitality, Office, Retail, and Technology.

• Supervised and managed the day-to-day activities associated with construction to

include self-performed personnel and subcontractors

• Work with and maintained a relationship with Architect, Engineers, Consultants, and

Owners

• Maintained construction documents including As-Built, RFI’s, ASI’s, and Daily

Construction Reports

• Supervise and maintain Job Site Safety

• Construction document interpretation and compliance with all Authorities

• Maintained daily work in progress budgets and fee enhancement

• Maintained contract accountability, inventory control, and start up documentation

Work History

• Highland Builders, Inc.

Date: July 2007-May 2008

Reason for leaving: Companywide layoff

Position: Superintendent

Responsibilities: Manage the day-to-day construction of commercial buildings

Turner Construction Company, Inc. (Special Projects Division)

Date: July 2005-July 2007

Reason for leaving: Better job offer

Position: Superintendent

Responsibilities: Manage the day-to-day construction of commercial buildings

Ric Patterson MEP Consulting Services

Date: November 2003-July 2005

Reason for leaving: Better job offer

Position: Contract Compliance Superintendent

Responsibilities: Manage the general contractors and subcontractors during the

course of commercial construction. Assisted in the commissioning of commercial

buildings including LEED© compliance. Established pre-construction budgets, DD

review and construction change orders

Denson Construction

1

Scott R. Abele-Resume

Date: November 2002- November 2003

Reason for leaving: Companywide layoff

Position: Assistant Superintendent

Responsibilities: Manage the day-to-day construction of commercial buildings

Self Employed

Date: November 2000- November 2002

Reason for leaving: Full time employment

Position: Owner

Responsibilities: Residential and commercial remodeling

Raytheon

Responsibilities: Aircraft painter

Projects

• (2) 16,800 sq ft Tilt wall buildings-Ground-Up US Truck Center-Grand Prairie, TX

Superintendant

Building #1- 3,500 s.f. offices, 10,150 s.f. warehouses, and 3,150 s.f. wash bay area w/

1,500 gallon water- oil separator

Building #2-3,000 s.f. office space developing 4 suites and 13,800 s.f. warehouse, and

3,150 s.f. wash bay area w/1,500 gallon water- oil separator, 3,000 s.f. office remodel

6,000 s.f. office remodel-SMU-Dallas, TX

Superintendant

Demolition and office rebuild and reconfiguration of SMU's Child development and

research program offices

1,200 s.f. office remodel-SMU-Dallas, TX

Superintendant

Office rebuild and reconfiguration and total new security system

44,000 s.f. Interior Build Out-Bear Stearns-Lewisville, TX

Superintendent

Constructed the occupied space including Executive Suites, common areas, and the

infrastructure

30,000 s.f. Interior Build Out-Bear Stearns-Lewisville, TX

Superintendent

Constructed the occupied space including Executive Suites, common areas, Data Center,

and all the infrastructure

78,000 s.f. Interior Build Out-Bear Stearns-Lewisville, TX

Superintendent

Constructed the occupied space including Executive Suites, common areas, and the

infrastructure

2

Scott R. Abele-Resume

122,000 s.f. Interior Build Out-Bear Stearns-Lewisville, TX

Superintendent

Constructed the occupied space including Executive Suites, common areas, and all the

infrastructure

215,000 s.f. Wal Mart-McKinney, TX

Superintendant

Oversee the construction and installation of all components associated with the 1st

LEED® certifiable Wal Mart store

95,000 s.f. Elementary School-Terrell, TX

Assistant Superintendant

Ground up construction

90,000 s.f. Elementary School-Royse City, TX

Assistant Superintendant

Ground up construction (5) 108,000 s.f. Tier III Data Centers-MCI/WorldCom Texas,

Washington, Colorado, Houston, Florida; QA/QC-Performance and warranty compliance

of the Data Centers to include energy studies

Education

• East Texas State College

Degree Earned-None 40 Credit Hours

Major: Liberal Arts

Dallas Art Institute

Degree Earned-None 80 Credit Hours

Major: Fine Art and Commercial Art

HazMat Operations Level

Personal Protection as well as SCBA and AED

SWPP

References

• Ric Patterson

721 Old Mill Lane

Point, TX 75472

Home: 903-***-****

************@*******.***

3

Scott R. Abele-Resume

Mike Olive, Project Manager

Decker Mechanical Inc.

1002 KCK Way

Cedar Hill, Texas

Office: 972-***-****

******@****************.***

Matt Stickney, Project Manager

TAS Commercial Concrete

4800 Cash Rd

Dallas, TX 75247

Office: 214-***-****

Cell: 214-***-****

*********@***********.***

Jeff Ferguson, Project Manager

Scott-Del Electric

2323 Fabens Road

P.O. Box 29535

Dallas, TX 75229-0535

Office: 972-***-****

****@*****-***.***

Javier Huerta, President

Carrco Painting

2659 Gravel Drive Building #1

Ft. Worth, TX 76118

Office: 817-***-****

Cell: 214-***-****

******@**************.***

George Lockhart, Construction Manager

Great Wolf Resorts

1400 East Hwy. 26

Grapevine, TX 76051

Office: 817-***-****

Cell: 608-***-****

*********@*********.***

Scott Halbert, General Superintendent

Serco Construction Group, Ltd

17400 N. Dallas Pkwy., #122

Dallas, TX 75287

4

Scott R. Abele-Resume

Cell: 214-***-****

********@*****************.***

Billy Neu, Operations Manager

Neuco & Associates, Inc.

2530 Glenda Lane, Suite 500

Dallas, Texas 75229

Office: 972-***-****

**@**********.***

5



Contact this candidate