Ashraf Aly, P.E.
Metuchen, NJ ***40, USA
Home: 713-***-****
Email: *********@*********.***
PROFILE
Responsible, Professional Engineer with 17 years of experience in Civil Engineering Oil and Gas areas of estimating,
project controls, construction management, construction supervision, field engineering, project documentation,
quality control and design. Strong interpersonal and effective communication skill.
PROFESSIONAL EXPERIENCE
Fluor Corporation (2008 – Present)
Senior/Lead Estimator Doha, Qatar
Qatar Gas Berth6 LNG exporting and process facility $1.75 Billion, EPCM contract, Responsibilities include:
• Preparing the engineer estimates for different work packages Civil, Structural and Mechanical (piping) -
Civil scope includes but not limited to concrete culvert crossings, marine concrete platform, piles
foundation, pipe concrete sleepers and retaining walls - Mechanical scope includes approximately 100 km of
36” LNG steel pipe line and several other lines varied from 1.5” to 32” of fire water and natural gas.
• Identify scope of work, perform constructability review, evaluate bid proposals and negotiate changes to the
contracts.
The Louis Berger Group, Inc., (February 2007–May 2008)
Senior/Lead Estimator New York, NY
World Trade Center Redevelopment “Transportation Hub & Freedom Tower” Manhattan, New York
Responsible Included:
• Develop engineer estimates for both WTC Transportation Hub and concrete substructure of freedom tower,
approximately 500,000 CY of concrete.
• Perform price comparisons and Development of quantity take-offs.
• Overseeing estimate reviews and validations; negotiating and resolution of contractor claims.
• Coordination with design entities and vendors on materials cost.
• Support of Value Engineering activities; and support of other cost/budget management activities.
Conti Enterprises, Inc., (January 2005 – December 2006)
Estimator/Project Manager South Plainfield, NJ
Worked on preparing bid estimates of wide variety of successfully low bid projects such as Trenton Morrisville
Bridge Rehabilitation and Newark International Airport Terminal B, Responsibilities included:
• Perform a hard dollar lump sum estimates for concrete structures, underground site utilities and steel
bridges.
• Review and perform take-off leading to a detail estimates.
• Generate base line schedule associated with the bids.
• Supervise project staff on determination of delay, disruption and impacts on project schedule and extended
overhead impact due to change of scope.
• Utilize experience to establish construction technique and explore value engineering.
• Analyze and determine the projects risk and recommend solutions for the finding.
• Manage and identify the project changes of scope, evaluate merit and entitlement.
• Accumulate projects historical data to be used in both bids and schedule.
• Identify and solve projects controls problems.
• Negotiate and clarify scope of work for subcontractors and venders.
• Produce equipment time span for the submitted bids.
____________________________________________________________________________________________________________
*********@*********.*** 1 of 2 Ashraf Aly’s Resume
Skanska USA Civil, Inc., (January 2000 - January 2005)
Project Controls Engineer Boston, MA
$14.8 Billion Boston’s Central Artery Tunnel Project - Contract CO9A4-Value $450M, I-90/I-93 Interchange.
Responsibilities included:
• Produce project cost reports for construction status to reflect cost-to-date and projected cost-to-complete.
• Define scope of work for the project changes with direct interface with the client.
• Generate both oral and written presentation to display merit, negotiate and finalize change orders totaling
over $20 million for all costs and schedule extensions utilizing various techniques to interpret and negotiate
the terms of the contract.
• Work with the project scheduler to incorporate historical data, redefine and evaluate level 3 schedules.
• Perform analytical review and prepare graphs to illustrate project cost and man-hours.
• Identify risk assessments and prepare corresponding reports to demonstrate the findings.
• Track actual cost expended and quantities used to-date.
Modern Continental Construction Company, Inc., (1998-2000)
Field Engineer Boston, MA
• Worked on Boston Central Artery Tunnel Project Contract CO9B1-Immersed Tubes Tunnel-Value $350M
• Maintain records of field activities for installation of (120) 11’-0 diameter drill shafts in Fort Point Channel.
• Establish and set horizontal and vertical controls using GPS and data collector.
• Inspect and oversee dredging operation in Fort Point Channel.
• Assist placing immersed tunnel tubes into position.
The Thompson & Lichtner, Inc., (Consultant Engineers) (1997-1998)
Construction Inspector Cambridge, MA
Worked on number of projects include Hilton Logan Airport and VA Medical Center.
Generate quality control inspection reports.
Oversee and inspect reinforcing steel placing and installation of fireproofing.
Monitor quality control procedures for soil compaction and identification.
MST (J.V.) (1992-1996)
Project Engineer Cairo, Egypt
Worked on different projects such as; Cairo Wastewater Treatment Plant, schools construction, water tanks, and
industrial buildings. Perform structural analysis and design for various new structural elements and check
structural integrity of existing structural elements, Responsibilities included:
• Follow up design with the field inspection to identify conflicts and provide timely/cost effective solutions.
• Review blue prints and process request for information.
PROFESSIONAL ASSOCIATIONS:
Licensed/Registered Professional Engineer (Civil) – Arizona, 2001
Registered Engineer in Training – Massachusetts, 1998
COMPUTER SKILLS:
HCSS Heavy Bid – Timberline - Microsoft Excel –PowerPoint – MSWord - Lotus Notes - JD Edwards
EDUCATION:
B.S., Civil Engineering, Cairo University, Cairo, Egypt, 1992
CITIZENSHIP:
United States
____________________________________________________________________________________________________________
*********@*********.*** 2 of 2 Ashraf Aly’s Resume