NANCY TRUONG
**** *** ****** *****, ********, CA 95035
(Cell) 408-***-**** (Home) 408-***-****
**************@*******.***
Objective: Use my experience and communications skills in a challenging
position as a Process Development Engineer.
Experience:
Oct 2008-Jan 2009 Cisco Systems, San Jose CA (Contractor)
Sr. Electro-Mechanical Engineer
Responsible for the smooth transition of CDE100, 200, 200 and
CDE110, 205, 220, 420 Servers from Engineer to Manufacturing.
Generate and release hardware and software in ECOs, MCOs to
production. Ensure completeness and accuracy of electrical and
mechanical characteristics in component data sheets required by
design specifications. Provide support in development and transfer
of new products. Manage my project tasks to meet schedule
commitment. Familiar with the latest revision of IPC-A- 610.
Jun 2006-Sept 2008 Advanced Knowledge Associates, Santa Clara CA
Sr. Manufacturing Engineer
Responsible for the smooth transition of AKA LM150, 200, 300, and
500 Logic Module from Engineering to Manufacturing. Generated and
released hardware and software in ECOs, MCOs to production.
Ensured completeness and accuracy of electrical and mechanical
characteristics in component data sheets required by design
specifications. Provided support in development and transfer of
new products. Managed my project tasks to meet schedule
commitment to BAE Systems. Familiar with the latest revision of IPC-
A- 610.
Significant contribution: Performed compliance and audit activities
required in successfully acquiring ISO 9000 certification in July
2008.
Applied LEAN manufacturing to drop in-process cycle times and lead-
time, to reduce inventory, to improve quality in operations.
Supported management in eliminating non-value adding operations,
equipment, and resources.
May 2005-Jun 2006 Intransa, Inc., San Jose CA
Operations Manager
Responsible for the smooth transition of Intransa DE5200 series
disk enclosures and SC5500 storage controller from Engineering to
Manufacturing. Generated and released ECOs, MCOs to production.
Ensured completeness and accuracy of electrical and mechanical
characteristics in component data sheets required by design
specifications. Provided support in development and transfer of
new network products. Managed my team and project tasks to meet
schedule commitment. Have unique experience in Logistics, Supply
Chain and Inventory Management. Familiar with the latest revision
of IPC-A-610.Significant contribution: Adopted LEAN Manufacturing
to produce the right products, provide the right services at the
required time in the required quantities with consistencies and
predictability.
Apr 2004-May 2005 Entrisphere, Inc., Santa Clara CA (Contractor)
Sr. Manufacturing Engineer
Responsible for the smooth transition of Entrisphere Broadband Loop
Multiplexer 1500 from Engineering to Manufacturing. Generated and
released ECOs and MCOs to production. Used my communication
skills to build and maintain strong working relationship with
Design Engineering, Test Engineering, and in-house suppliers.
Managed my project tasks to meet schedule commitment. Familiar with
IPC-A- 610.
May 2001-Apr 2004 Znyx Networks, Inc., Fremont, CA
Sr. New Product Introduction Engineer
Responsible for the smooth transition of new products from
Engineering to Manufacturing: (1) Network Switches-10/100 Fast
Ethernet ZX4300P, ZX4500, ZX4500P, ZX4600, ZX4800, ZX4900 and ATCA
ZX5000, (2) Ethernet Adapters-10/100 Fast Ethernet ZX200, ZX300,
and ZX400 series. Served as Engineering department focal point for
project-related tasks. Generated and released ECOs to
production. Understand thoroughly the NPIE process to drive
projects to reach schedule milestones. Used good communication
skills to build and maintain strong working relationship with
Design, Manufacturing and Test Engineering, and in-house suppliers.
Provided directions to technicians for troubleshooting and repair
tasks. Provided support in development and transfer of new network
products. Have unique experience in sales and product support,
working closely with Intel, Motorola, Nortel, Sanmina, NEC, and
Force Computers. Familiar with IPC-A- 610.
Mar 1999-May 2001 Cisco Systems, Inc., San Jose, CA
Sr. New Product Introduction Engineer
Responsible for the smooth transition of the following new products
from Engineering to Manufacturing: (1) new-generation spatial reuse
protocol port adapter on fiber optic media and voice-over-IP port
adapter, (2) versatile interface processors installed in 7500
Series routers, and network processor engine installed in 7200
Series routers supporting multi-protocol, multimedia routing. Used
latest Oracle/Unix database tools to generate error-free BOMs.
Verified DFM and DFT in board layout design. Created and
maintained new product documentation. Provided on-going and
sustaining technical support, concurrent engineering support for
new products, value engineering and cost reduction. Generated and
released ECOs to production. Provided support to supply operations
to procure and qualify materials in a timely manner. Ensured
smooth transition and minimized build delays. Reduced
inefficiencies in the NPIE process. Understand thoroughly the NPIE
process and drive projects to reach schedule milestones. Used my
good communication skills to build and maintain strong working
relationship with design engineering, manufacturing/test
engineering, program management and in-house suppliers. Familiar
with IPC-A- 610.
Jan 1996-Mar 1999 Network Computing Devices, Inc., Mountain View, CA
Sr. Product Engineer
Responsible for the smooth transition of the following new products
from Engineering to Manufacturing: (1) IBM-403 low-end and IBM-603
high-end network computers, (2) new generation NCD network
computers using Intel CPUs. Generated and managed BOMs, ECOs,
assembly drawings and schematics. Distributed in a timely manner
to suppliers, purchasing, and manufacturing for prototype and pilot
builds. Developed and procured all materials required for new
products. Managed rework instructions, resolved component issues
with suppliers. Created and maintained new product documentation
packages. Always met schedule commitment. Familiar with IPC-A-
610.
Jan 1995-Jan 1996 Microdyne Inc., San Jose, CA
Product Engineer
Responsible for the smooth transition of the following new products
from Engineering to Production: 10Base-T hubs and Ethernet
switches. Defined, set up, conducted functional tests, and
developed test procedures for the following products: 8/12/24-port
10Base-T hub, 6/12-port 100Base-T hub, Ethernet switches (4-fixed
10Base-T and 1-100Base-TX Fast Ethernet Link). Generated ECRs,
ECOs, BOM, and AVL (Expandable) for new and existing products.
Feb 1994- Jan 1995 Personalized Software Manufacturing Services,
Mountain View, CA
Manufacturing Engineer
Created and released ECOs for new software using different software
duplication processes and media. Responsibilities included
managing time-to-volume, product cost objective, process
improvements. Analyzed and improved product process and material
flow.
Sept 1985- Jan 1994 Lockheed Martin Corporation, Sunnyvale, CA
Systems Engineer(Secret Clearance held)
Supported engineering modifications of communications systems in
the USAF satellite control network. Actively involved in the
development process, design and system integration, and planning of
verification and validation testing.
Developed LAN and WAN networks of user workstations for the sharing
of resources and data between satellite tracking facilities.
Provided technical support to USAF personnel.
Developed interface specifications for Cisco AGS+, IGS/R, CGS, MGS
routers, bridges, and associated network devices, including Chipcom
fiber optic transceivers, and Versitron isolators.
Education: B.S.E.E., 1985, San Jose State University, San Jose, CA
Skills: O/S Platforms: WinXP, Win2000/NT, Unix (Sun Solaris)
Applications: Oracle ERP, AutoCAD, ProE, Allegro
Other Tools: Winchill, Arena PLM, Agile, Valor, Jaguar, Askman,
Sage MAS 200, ERP 5.2, MRP, MS Great Plains, MS Office
Suite, QuickBook, Framemaker
Reference: Available upon request.