Contact:
Patrick Keane
Radio Access Network portable: 954-***-****
Principle Engineering Consultant email: abnfeo@r.postjobfree.com
address :
**** ****** *** **** *** 1126 Coral Springs, FL 33067
profile :
Radio network planning and optimization for 2G/3G voice and data protocols since 1996. Over 20 years experience
with operation and deployment of computer, radio transceiver and
telecommunications systems.
background :
technologies activities applications
• WCDMA/UMTS • RF planning / propagation • Nortel
• cdma2000/1XRTT • pre/post launch optimization • Ericsson
• IS95/IS95B • operations/performance KPI’s • Lucent
• EVDO • features, FOA’s, upgrades • Nokia
• AMPS
education:
BSEE 3.5/4.0 Rutgers University New Brunswick, NJ
experience:
WCDMA / UMTS cdma2000 / 1XRTT/IS95/EVDO/AMPS
• UMTS RAN Engineering Consultant • Sr CDMA Performance Engineer
(3Z Telecom - contract) (Sprint - contract)
Nov2009 – Dec2009, Ft Lauderdale, FL Nov2004 - Jun2005, Miami, FL
• Sr CDMA Performance Engineer
• UMTS Design and Optimization Engineer (Sprint - contract)
(T-Mobile - contract) Apr2004 - Apr2004, Jacksonville, FL
Nov2006 – Sept2009, Plantation, FL • Sr CDMA Performance Engineer
(Cellular South - contract)
• Model Tuning Senior Engineer Dec2003 - Mar2004, Mobile, AL
(T-Mobile - contract) • Senior IS-95/cdma2000 RF Engineer
June2006 - Oct2006, Plantation, FL (Nortel)
May2000 - Sep2002, Sunrise, FL
• Principle RF Engineer - UMTS • Design/Performance RF Engineer
(Cingular - contract) (Verizon)
Nov2005 - Apr2006, Boca Raton, FL Jun1998 - May2000, Boca Raton, FL
• RF Engineer
• UMTS/W-CDMA RF Engineer (Sprint)
(Hi3G - contract) Nov1997 - Jun1998, Plantation, FL
• RF Engineer
Sep2002 - Apr2003, Stockholm/
(Bell Atlantic Mobile)
GÖteborg,SE
Jun1996 - Nov1997, Branchburg, NJ
military:
US Navy 1986-1992 FC1 (E-6) Fire Control Technician
(Combat Systems Missiles)
PROFESSIONAL EXPERIENCE HIGHLIGHTS
o Initial system radio planning: morphology/geography and CW radio propagation studies, search ring
generation, site candidate analysis, base station location and configurations, antenna system testing and
specifications, link budget and prediction model tuning
o Network operation and optimization: system level configurations of radio resource, mobility management and
call management parameters, mobile data collection, call performance and statistical trending for grade of
service analysis
o Future planning and network growth: initiate and expand customer service areas, forecast usage and
subscriber growth, develop special applications (arenas, airports, subways, stadiums, etc)
keywords:
WCDMA/UMTS, cdma2000/1XRTT, IS95/IS95B, EVDO, HSDPA AMPS Nortel BSC,BTSC,BSM (O&M) Lucent
ECP, Base Station, OMP (O&M) Ericsson UTRAN and RAN, RANOS (Radio Access Network Operation
Support), EMAS (Element Manager Access System Support, Ericsson), BSM, CNA Nokia NetAct – Optimizer,
CM Editor, CM Operations Manager, BTS Site Manager, CM Analyzer, RNC Browser, Antenna Data Editor RF
planning- AIRCOM Asset,MSI Planet,WATCHMARK Design, MOTOROLA Netplan, LCC
CellCad,PC/WINTEL/UNIX- MS-Office, c, html, csh, tcsh, sed, awk, X,TCP/IP, ftp, telnet, Visual Basic, Mapinfo,
Mapbasic, RF Engineering – Actix Spotlight, Optimizer,CACP,BSMCI,CDF NCF Editor,NL Tuning Array,
Autopace, TEMS, Xceed WINDCATCHER, ACTIX IQ Analyzer, Spotlight, Optimi ACP, ANDREW Spectrum
Tracker, Anritsu
PROJECT AND EMPLOYMENT HISTORY
AWS 1700-2100
UMTS RAN Engineering Consultant
Nov 2009 – Dec 2009 Ft Lauderdale, FL
o UMTS technology training and planning
o Radio Access Network (RAN) CIQ preparation and validation
o Nokia OSS datafill auditing and neighbor adjacency generation
o Scrambling Code planning for UMTS deployment
o 2nd carrier nodeB configuration planning and datafill verification
o TEMS drive test equipment training and data throughput configuration and testing
o Data collection post processing and site launch support
AWS 1700-2100
UMTS Design/Optimization Engineer
Oct 2006 – Sep 2009 Miami, FL
o UMTS/GSM performance monitoring and optimization using KPI targets for RF actions and planning
o UMTS pre/post launch tuning including antenna tilt and parameter recommendations
o Pre-launch datafill auditing and neighbor adjacency generation
o Construction close out validation including sweep test and remote tilt (AISG 2.) configuration/verification
o Scrambling Code planning for UMTS deployment
o Asset 3G site and cluster RF analysis and macro development for data integrity audits and KPI achievement
o Site Audit and UMTS/GSM antenna overlay designs, construction support
Nokia UMTS / Ericsson GSM
PCS 1900 / AWS 1700-2100
Model Tuning Team Lead
Jun 2006 – Sep 2006 Miami, FL
o 1900 PCS propagation model definition with extrapolation to 2100 MHz AWS
o CW data collection and project planning
o Tuning and validation
o Model integration and implementation
AWS 1700-2100
Principle RF Engineer
Oct 2005 – May 2006 Miami, FL
o UMTS RF Design planning with Asset 3G simulation software
o Propagation analysis and RF database maintenance
o Traffic cell spreading and monte carlo analysis
o Iterative system design optimization with Optimi ACP tool
o Project summary and analysis for launch strategy support
o Neighbor adjacency generation and tuning
o Scrambling Code planning and strategies
PCS 1900
CDMA SME
July 2005– July 2005 Miami, FL
o CDMA repeater performance analysis and testing
o Optimization and OA&M
o Alvarion equipment vendor for shipboard repeater deployment
PCS 1900
Principle CDMA Performance Engineer
Sep 2004 – July 2005 Miami, FL
o CDMA2000 Performance Engineering, EVDO datafill and data collection verification
o Cell site HW and SW change recommendations
o New feature testing and implementation
o Propagation analysis and testing
o KPI development and analysis
o Statistical trending for grade of service evaluation
o Nortel Infrastructure - BSC,BTSC,BSM (O&M)
PCS 1900
Senior CDMA Performance Engineer
Apr 2004 – May2004 Jacksonville, FL
o Lead RF for Nortel inter-system rehome of client market
o configure inter-system handoff borders
o post process and analysis of drive test data and system audit files
o Nortel Infrastructure - BSC,BTSC,BSM (O&M)
PCS 1900
Senior CDMA Performance Engineer
Nov 2003 – Apr2004 Mobile, AL
o CDMA2000 System launch optimization
o Cell site HW and SW change recommendations
o System datafill auditing
o Propagation analysis and testing
o KPI development and analysis
o Statistical trending for grade of service evaluation
o Nortel Infrastructure - BSC,BTSC,BSM (O&M)
PCS 190
UMTS RAN Tuning Engineer
Oct 2002 – Jun 2003 Stockholm/GÖteborg - SE
o 3G System launch optimization
o Cell site parameter recommendations including antenna tilts, neighbor adjacencies and DGU settings
o System datafill auditing
o Propagation analysis and testing
o KPI development and analysis
o Statistical trending for grade of service evaluation
o Ericsson Infrastructure - UTRAN and RAN,RANOS,EMAS
Nortel Networks
Senior CDMA RF Services Engineer
May 2000 – Sep 2002 Sunrise, FL
o 1XRTT trials for MTX10 customer cdma2000 launch
o 1XRTT acceptance testing including layer 3 and call flow tracing, datafill configurations and analysis
o Radio Link Protocol testing and optimization via PPP session management and call sequence analysis
o CDMA network feature testing including Nortel FIT and FOA customer acceptance trials.
o cell site base station verification and integration
o System datafill auditing
o CDMA carrier addition and overlay
o OM statistical trending and analysis
Verizon
Senior CDMA Design Engineer
Jun 1998 – May 2000 Boca Raton, FL
o RF coverage planning for PCS system launch and expansion
o System frequency and scrambling code planning
o Mobility parameter management and optimization
o Base station power output and control
o KPI development and analysis
o Statistical trending for grade of service evaluation
o Lucent Infrastructure - ECP, Flexent, apxrcv, fci, OMP (O&M)
Sprint PCS
CDMA Design Engineer
Nov 1997 – Jun 1998 Plantation, FL
o RF coverage planning for PCS system launch and expansion
o System frequency and scrambling code planning
o Mobility parameter management and optimization
o Base station power output and control
o KPI development and analysis
o Statistical trending for grade of service evaluation
o Nortel Infrastructure - BSC,BTSC,BSM (O&M)
Bell Atlantic Mobile
RF Design Engineer
Jun 1996 – Nov1997 Branchburg, NJ
o AMPS and CDMA cell site planning and engineering
o System frequency and scrambling code planning
o Mobility parameter management and optimization
o Base station power output and control
o Statistical trending for grade of service evaluation
o Lucent Infrastructure - ECP, Flexent, apxrcv, fci, OMP (O&M)
Education
o B.S., Electrical Engineering (May 1996) Rutgers University, New Brunswick NJ (GPA: 3.5/4.0)
Military
o US Navy 1986-1992 FC1 (E-6) Fire Control Technician (Combat Systems
Missiles)