Post Job Free
Sign in

Manager Quality Control

Location:
Leesburg, FL, 34748
Posted:
March 09, 2010

Contact this candidate

Resume:

PAUL W. WITT, JR.

***** ** **, #***

Leesburg, FL 34748-8590

352-***-****

352-***-**** cell

abnew0@r.postjobfree.com

EDUCATION:

Myers University, Ohio, USA

- Degree, Bachelor of Science, May 1999

- Concentration: Business Management

PRESENT/PAST EMPLOYERS:

DURA-STRESS, Leesburg, Florida, USA - 2006-2009

LJ Tool Specialties, Cleveland, Ohio, USA - 2005-2005

Meyer Products, Cleveland, Ohio, USA - 2003-2005

ARGO-TECH, Cleveland, Ohio, USA - 1989-2002

TRW, Cleveland, Ohio, USA - 1978-1988

Coca-Cola Bottling Co., Cumberland, MD, USA - 1977-1978

EXPERIENCE - JOB TITLES

- SITE MANAGER

- QUALITY CONTROL

- QUALITY CONTROL SUPERVISOR

- SUPERVISOR/FOREMAN

- EXPEDITER

- PC SPECIALIST

- HELP-DESK

- NETWORK CABLING SPECIALIST

- JCL TECH/SCHEDULER

- LEAD COMPUTER OPERATOR

- EXPIDITER

- DRIVER/SALESMAN

WORK SKILLS/ASSIGNMENTS

DURA-STRESS Inc., Site Manager- 01/2007-4/2009

- Control Job site operations

- Order project materials delivery dates

- Control storage of product and trailers for production

- Schedule sub-contractors for on site work

- Track work progress and safety concerns

- Work with project managers and owners of project

DURA-STRESS Inc., Quality Control- 03/2006-01/2007

- Check and Measure parts for defects

- Record product defects and product status

- Devised and installed new procedures for recording problems with product

LJ Tool Specialties, - AEROTEK Automotive, Quality Control Supervisor -

09/2005-11/2005 (Temp)

- Supervise a nonunion work force

- Check automotive parts for defects

- Correct defect in parts or return parts to operators

MEYER PRODUCTS, Machine/Fabrication Shop Supervisor - 11/2003 - 02/2005

- Supervise five departments in a union work force

- Machine shop/fabrication

- CNC machines; Plasma cutting tables; Angle Master; Hem saw; Finn Power

- Welding shop

- Manage the work flow in the parts department: processing the UPS/FEDEX

orders

- Supervise and check the packaging line, also scheduling the next product

packed

- Control the shipping dock: check and scan orders before loading the

freight trucks

- Evaluate the performance of all employees working in my departments

- Supervision and completion of nightly workload

- Scheduled daily and weekend job requirements with personnel coverage

Contract Job at Norman Noble, Expediter - 07/2003 - 09/2003 (Temp)

- Move stents through workstations

- Record movement of stents in computer

- Update status of stents

- Provide shift supervisors and/or leads of stents needed for shipment

- Check and count stents for accuracy before stents are moved to the next

workstation

ARGO-TECH, Network Cabling/PC Specialist/ Help-Desk - 02/1989 - 02/2002

- Resolved user questions in all areas of PC/Laptop: MS Office 95, 97,

EMAIL, Windows 95, 98, 2000, MAGIC, Lotus Notes

- Co-organizing installation of Ethernet backbone and conversion from Token

Ring 4/16Mb

- Fiber optics: testing, connecting, splicing, closet termination

- Coordinate user equipment updates, repairs, and moves

- Site preparation per user requirements with mapping of the location and

scheduling the work with time requirements

- Perform software installs and updates on user PC's, laptops, and printers

- Submitted requests to venders for equipment repair under warranty

- Resolved all help desk calls involving end users software and PC

equipment

problems

- Setup and training in cabling infrastructure

- New employee training in computer operations

- Create new documentation for cabling and special protocol wiring diagrams

- Installed and tested LAN / WAN cable connections

- Researched, tested and selected category 5 termination components

- Wrote instructional documentation for staff, wiring closets updates and

protocol processing

- Standardized documentation for all employees.

- Organized and wrote documentation for operations staff

- Restructured existing cabling infrastructure

- Designed and implemented trouble shooting techniques for connection

problems

- Resolved management's questions, concerning on new CAT5 cable installs

location

and time requirements

- Complete installation of new CAT5 cable pulls within the company

- Created cable jumpers for user sites, closets and network protocols

- Installed, maintain and repair bar code terminals for shop floor

activities

- Set up the locations for the Kronos time clocks/bar code readers plus

installation and maintained the clocks

- Maintained daily job requirements schedule and scheduled coverage of

personnel

TRW, Lead Computer Operator - 03/1978 - 12/1988

- Resolved failed job requests or interacted with system manufacturer

support

personnel to do so

- Operated IBM Mainframe

- Process nightly scheduled jobs

- Organized output from processed jobs

- Process nightly backups

- Process tape catalog and pull tapes need for scratch list

- Submit nightly job processing

- Set up jobs for processing

- Correct errors in nightly job processing

- Control all inventory for computer room processing

- Order products for computer room processing

- Supervised and scheduled the shift operators work load

- Processed the nightly work schedule

- Process distribution for reports

- Resolved or called on-call programmer for job corrections

Coca Cola Bottling Co. Driver/Salesman - 07/1977 - 03/1978

- Calculate and submit payment for daily sales

- Drive, deliver and sell Coca-Cola products

- Load and unload truck

PAUL W. WITT, JR.

28229 CR 33, #79C

Leesburg, FL 34748-8590

352-***-****

352-***-**** cell

abnew0@r.postjobfree.com

References

Shawn Abrehamsen, Manager Tire Plus 352-***-****

Paula Anscomb, Dispatcher, Mt. Dora Police 352-***-****

John Crutchfield, QC Manager, Dura Stress 352-***-****

Dan Jukiewicz, Supervisor, Meyer Products 440-***-****

Gary Miles, Owner, G&L Locksmiths 440-***-****

Dean Priebe, IS Manager, ARGO-TECH/EATON 216-***-****



Contact this candidate