Project Power Plant

Location:
Temperance, MI, 48182
Posted:
March 09, 2010

Contact this candidate

Resume:

Don Reau

General Superintendent - Project Superintendent

***** ***** **.

734-***-****

Temperance, MI 48181

abneh1@r.postjobfree.com

Summary of Qualifications:

Over 30 years of progressive field experience leading up to roles as a

General Superintendent/Project Superintendent over the last 12 years.

Responsible for all day-to-day field activities on all projects and

supervises all phases of construction to ensure the required materials and

construction equipment are on site, in the proper sequence, and the

subcontractors are manning the project sufficient to meet the schedule.

Performs daily inspection of all work to ensure conformance with the

contract and design documents and work is completed in a manner compliant

with all safety regulations. Responsible for maintaining client

relationships in the field, resolving issues and positioning the company

for future project work.

Rudolph/Libbe, Inc:

12/1978-1/2010

Michigan & Ohio Operations

Carpenter Foreman

10/1996-1/1998

General Foreman

1/1998-6/1999

Project Superintendent

6/1999-2002

Field Operations Manager

2002-2010

Certifications/Licenses:

. Journeyman Carpenter - Local 687 . OSHA 30 Hour . MIOSHA 10 Hour .

First Aid/CPR/AED

Market Experience:

. Utilities/Power . Petroleum . Industrial . Manufacturing

. Commercial/Office .

Institution . Government

Summary of Project Experience:

The Special Accounts Group focused on completing projects in a range up to

$2M in construction cost. Projects were generally fast track in nature,

client "high priority" driven by safety & emergency response compliance, or

rapid response to changing critical market conditions. Typical projects

may include heavy concrete, site/civil & utility, emergency maintenance,

capital equipment and general facility construction.

Selected Client Experience:

. ACH/Ford Motor Co. . BASF . Marathon Petroleum . US Steel .

Severstal NA

. DTE Energy . Consumers Energy . Sunoco Inc. . Pfizer . Mazda .

Frito Lay

Project Addendum:

ACH / Ford Motor Co. - Saline, Michigan $2.4M

. East warehouse upgrade project

. Automotive component cooling towers project

. Automotive component water return line project

BASF Corporation - Wyandotte, Michigan $2.9M

. Fire stopping walls project

. River water increase project

. Offsite Containment Warehouse

.

U. S. Steel - Ecorse, Michigan $4.1M

. Wastewater project involving concrete, masonry, civil work and sub

painting, steel, and roofing for EES Coke Battery

. Remove and replace No 1 cooling tower

. Excavation, backfill, concrete duct banks and misc. foundations for

Triangle No 2 Ore dock trestle

. Install new concrete overlay slab over 120,000 SF warehouse, new

overhead doors, loading dock, and man doors as well as excavation for

fire line, lead abate, structural steel painting, etc

. Tube City office building

. Monarch Welding baghouse 1 & 2 foundations project

U.S. Steel - Granite City, Illinois $1.5M

. Warehouse renovations project

Severstal North America / Steel Mill - Dearborn, Michigan $2.8M

. Stove deck repairs

. Top and surface inspection project

. BOF ladle prep and caster project

. B Furnace Bag House foundations, electrical and piping trestle

foundations.

. Relocation of power supply to new Cold Mill

. Scrap Yard Separation Project - Heavy concrete

Consumers Power - Erie, Michigan $500K

. Electrical pads project for GEM

. Provide architectural, mechanical and electrical work to modernize a

passenger elevator at JR Whiting plant for Shindler

. ICS Rail Road bridge repair

Mazda Motor Mfg. / Prep Center - Woodhaven, Michigan $1.2M

. 30,000 SF pre-engineered facility for applying striping to cars

Detroit Edison Co. - East China, Michigan $1.4M

. SCPP security office project

. Install foundation for BRPP conservator tank

. Construction pre-engineered building for Belle River Peaker

. Phase I Gallery Floor Replacement Project at St. Claire Power Plant

included removal of 2700 SF of pre-cast floor panels inside enclosed

coal conveyor. Panels were replaced with metal deck and 3" concrete

floor.

. Construction of pre-engineered building for Belle River Peaker

Detroit Edison Co. - Monroe, Michigan $3.5M

. Boiler project at MESB

. Pressurize modular electrical building for Unit 3 SCR

. Rough grade site/construct foundations/slabs for dust control system

. Exploratory digging for utility location

. Project for 1-2 Slurry House

. Floor-to-ceiling renovations to Control Rooms 1 & 2

. Renovations to Control Room #3 for new equipment

. Maintenance office project

Detroit Edison Co. - Detroit, Michigan $1.2M

. Trombley Part 5 containment project

. Earthwork & concrete work to install natural gas fueling system

. Remodel 4,116 SF office space at Warren Service Center

. Maintenance garage addition for service center

Detroit Edison Co. - Marysville, Michigan $700K

. Concrete structures to contain potential oil spills/leaks

. Install oil containment provisions, including retention pond for Part

5 containment project.

Detroit Edison Co. - Sylvan Lake (Pontiac), Michigan $585K

. Regrade coal yard, dig retention ditch and create a berm

. Locker room modifications

Detroit Edison Co. - River Rouge Power Plant, Michigan $900K

. Project to perform civil, concrete and finish trades to install

concrete containment structures and pedestals for new chemical tanks

being installed

. Install Hydrochloric Acid system

Detroit Edison Co. - Newport, Michigan $1.8M

. Fermi NOC walkway project

. Fermi Black Start Emergency Generators Backup Power System

Detroit Edison Co. - Trenton, Michigan $1.3M

. Sibley Quarry wireless communication project

. Reroute storm sewer main thru out plant

. Installation of electrical and piping for new water treatment system

Detroit Edison Co. - Ann Arbor, Michigan $350K

. Excavation, concrete duct banks, sidewalks, footers and masonry walls

at Alternate Data Center

Tenneco Automotive - Jackson, Michigan $500K

. Pedestrian bridge project

Songer Steel Service - River Rouge, Michigan $870K

. USS B stove civil / concrete project

Marathon Ashland Petroleum - Detroit, Michigan $6.5M

. Installation of new foundations offsite for GOHT Unit & Alky

. 400 LF of duct bank thru out plant

. Demolition of existing boiler foundations

. Supply & install new ESP foundations for expansion

. Installation of temporary oil/water separator system and partial

demolition of existing system

. Installation of 2 new blast proof guard houses at main gates

. New water treatment facility project including underground utilities

and concrete foundations

Pfizer Inc. - Kalamazoo, Michigan $350K

. Pour concrete floor topping for Florline Midwest at Pfizer facility

Pfizer Inc.-Ann Arbor, Michigan $4.8M

. 50,000 SF, 2 story Lab building

. MRI installation in existing facility

Sun Pipeline - Taylor, Michigan $450K

. Site investigation and load calculators at Inkster administration

building, garage and pole barn

Sunoco -Sterling Heights, Michigan $2.4M

. Natural Gas Peaker Plant

Power Process Piping - Avoca, MI $1.8M

. 10, 5 and 6 compressor addition at Romeo, Michigan

. Zug Island B2 Furnace project

. Concrete foundations & trenching at DTE Greenwood Twp

Ford Motor Company - Dearborn, Michigan $420K

. Modification to existing HVAC system for CTL Duct