PROFESSIONAL EXPERIENCE (1999-2009)
Construction Superintendent
KIRCO LLC - Troy, Michigan
RESPONSIBILITIES
. Responsible for accurate and timely job reports, all job
correspondence, e-mails, meeting minutes, daily safety reports,
progress staff activity reports, look ahead schedules for weekly
meetings (Meridian Prolog & Microsoft Projects)
. Pre planning review of all preliminary documents
. Setup subcontractor staging areas
. Secure/obtain all permitting (City & State)
. Review and approve material submittals /samples
. Review of all shop drawings
. Initiate RFI's & follow up with document changes - Addendums &
Bulletins review and distribute
. Conduct Weekly meetings (owners, architects, subcontractors)
. Adjust progress of project while evaluating design problems
. Supervision of up to 150 men on job daily
. Schedule & Oversee all building inspections, special inspections and
review reports of testing engineer; forward to engineer of record and
discuss, active in solutions
. Supervise and review all field dimensioning by engineers survey crew,
instrumental in trouble shooting discrepancies.
. Monitor site safety per company policy
Technology Skills Education and
Certifications
Meridian Prolog Southeastern Louisiana University-Architecture
-1980
Microsoft Projects LEED
Classes
Microsoft Outlook/Word/Excel Licensed Storm Water - State of
Michigan
Master Carpenter Licensed Builder - State of Michigan
Certified in CPR
PROJECTS & ACCOMPLISHMENTS (1999-2009)
Rayconnect International SAS Rochester, MI - LEED Design, Plastic Injection
Molding Factory
. Completed on time and under budget with a considerable shared savings
. Built job without winter conditions due to budget and economic
restraints
. Worked around DEQ wetlands permit to maintain progress and schedule
. Numerous changes and design delays relating to LEED Points and owner
equipment changes made job difficult
Corporate Express US Inc. Southfield, MI - Office/Warehouse Designed by
Yamasaki & Associates
. Ground up to finish - difficult site, perched water and wet clay in
fall construction
Crittenton Medical Hospital Medical, Rochester MI - 4 story addition to an
occupied existing medical office building on hospital complex. Complete
second floor medical office for Wayne State University.
. Difficult job on hospital grounds (logistics, traffic control, noise &
dust control)
Warde Medical Laboratory Ann Arbor, MI - Level 3 medical testing
laboratories
. Ground up to finish
. Complicated HVAC, Electrical systems (1000 dedicated circuits to
backup generator) $.75m in medical lab cabinetry with trespas tops
. Numerous fume hoods
. Medical gas room, RO water room along with all associated stainless
steel piping and equipment
Essay Medical Laboratory Ann Arbor, MI - Level 2 medical testing laboratory
. Ground up single story start to finish in 7 month fast track schedule
. RO water room and all associated piping
Single story Medical / Industrial, Ann Arbor, MI
. Ground up core and shell medical - industrial speculation building
Basha Medical Facility Royal Oak, MI -4 Story Medical addition to existing
facility originally built by Albert Kahn.
. Difficult job to existing forty year old building on a tight site on
Woodward Avenue.
Hertz Rental Cars, Royal Oak, MI
. Ground up start to finish rental car facility.
Columbia Center Towers 1 & 2, Troy, MI - Twin towers, 28 floors total,
Designed by Yamasaki & Associates.
. Assisted in Core & Shell joint venture with Walbridge on tower 2
. Single superintendent of all high end tenant work (20,000 square feet
per floor) while
Simultaneously relocating tenants from tower 1 to tower 2
PROFESSIONAL EXPERIENCE (1997-1999)
Construction Superintendent
Interior Partnership Group, Troy Michigan
PROJECTS & ACCOMPLISHMENTS (1997-1999)
Blue Cross Blue Shield - Commercial Building
. Commercial renovation and personnel move involving the first and
second floors of the Riverside complex in phases while occupied.
Crowley's Department Store - Interior renovation of first and second floors
. Successfully meet time and budget constraints, overcoming a difficult
schedule while open for business.
. Coordinate and supervise asbestos abatement
Big Apple Bagel Restaurant
. Successful in meeting time and budget constraints while working with
Big Apple representatives through all phases of store set up and
coordination
. Set up Board of Health inspections - oversee all requirements to
obtain certificate.
. Responsible for Big Apple specifications including all finishes -
colors, floors, trim pack, fixtures, casework, displays and logo's,
menu board.
Other notable projects and EXPERIENCE:
Vehma International - Industrial, Campbell I Manix - Chrysler Detroit Zone
Offices - Detroit Science Center, Detroit Zoo, MSX International, GM
Specials Vehicles
Carpenter
Commercial Contracting Corporation Troy, Michigan,
1996 to 1997
1. Carpenter and Millwright experience various Chrysler projects.
Superintendent / Carpenter
Pulte Construction Rochester Hills, Michigan
1995 to 1996
2. Site Superintendent and Carpenter on various commercial and industrial
projects.
Owner I Operator
CJM Carpentry Company St. Clair Shores, Michigan
1991 to 1995
3. Owner and operator of high end custom interior finish carpentry
company, successfully completing various projects while overcoming a
competitive market.
4. Calculate and finalize job costs
5. Personally performing carpentry while managing up to ten employees.
6. Extensive background in custom interior finish carpentry including
millwork, casework, design- fabrication and installation of stairs and
related parts.
7. Plan, design and build various architectural details.
Carpenter
US Stairs Parts West Bloomfield, Michigan
1988 to 1991
. Finish Carpenter and subcontractor in fabrication and installation of
stairs and their related components plus custom interior finish
carpentry.
Carpenter
Custom Design Woodwork Clarkston, Michigan
1983 to 1988
. Finish Carpenter high end custom interior carpentry company in various
residential projects ranging from $2M to $6M.
Draftsman/Field Inspector
William J. Hughes Jr. & Associates, Architects Baton Rouge, LA 1980
to 1983
. Draftsman and Field Inspector in various commercial, industrial and
residential projects
. Trouble shoot special situations- develop solutions.
. Field inspections - verify job as per print, daily job reports.
. Shop drawings - review and approval.
Carpenter/Builders Assistant
CR. Jones Construction Company Baton Rouge, LA 1976 to
1977
Assist builder in residential development projects.
. Form, Frame & Finish carpentry.
. Site work: - lot preparation, tree removal, layout and landscaping.
. Take off and purchasing of materials.
. Heavy Equipment operation.
Carpenter Baton Rouge, Louisiana 1974 to
1976
. General carpentry experience on large industry and commercial projects
(Exxon, Shell and Dow Chemical)