Post Job Free
Sign in

Engineer Manager

Location:
Southgate, MI, 48195
Posted:
March 09, 2010

Contact this candidate

Resume:

James M. D'Amato

***** ***** **.

Southgate, MI *8195

734-***-****

E-mail: *********@*******.***

CAREER SUMMARY

. 2 yrs - Independent Contractor for Manufacturing and Engineering

consulting

. 9yrs - Director managed a corporate injection/blow molding tooling, gage

and feasibility group. Drive product manufacturability through design,

establish feasibility and tool ability for production success. Maintain

corporate budgets; personnel and travel.

11 yrs - Sr. Tooling Engineer in a manufacturing environment; new tooling

development from feasibility through production, cost, processes for

Automotive interior and exterior products

12 yrs - Manager and Engineer in manufacturing environment; injection

molding, processing, assembly of business machine, medical devices,

automotive connector and toy parts, production monitoring, shipping,

receiving, raw materials, inventory tracking

EXPERIENCE

D'Amato Consulting LLC

7/08 - present: Independent Consultant for the Injection Molding Industry

. Independent Sales representative for a mold shop and an automation

manufacturer

. Provide on-site support events at mold build source in China - Dec 08

. Supply technical direction for injection tooling from quote phase through

launch

. Troubleshoot, develop and implement corrective action plans as the

project requires

. Involvement in upfront feasibility so quote direction is clear and

concise

. Provide manufacturing feasibility for success in molding

Plastech Engineered Products, Dearborn MI

6/05 - 7/08: Corporate Director, Tooling Eng., Gage Eng, Mfg Feasibility

. Directed and mentored a group of 20 T/E's, G/E's and Feasibility

Engineers

. Responsible for all injection and blow mold tooling through concept to

successful launch

. Achieve corporate goals and directives, budgets for personnel and travel

6/00 - 6/05: Tooling Engineering Manager

. Created a Tooling Engineering Department including Gage Engineers

. Developed Corporate Injection Mold Tooling Standards

. Review potential new business for feasibility prior to customer quote

. Created a feasibility department to review product designs for

manufacturability

. Justified the incorporation of Moldflow software and its utilization to

add computer aided analysis enhance upfront product fease

. Responsible to survey and approve vendor base

8/99 - 6/00: Sr. Tooling Engineer

. Hired to launch the Ford U152 interior trim tooling program

Lear Corporation, Dearborn, MI (acquired Automotive Ind. & O'Sullivan

Corp.)

1/95 - 8/99: Sr. Tooling Engineer

. Interface with part designers to design for tooling & manufacturing

feasibility

. Develop & follow primary tooling design through production

. Tooling built for machines from 150 ton to 4000 ton

6/94 - 1/95: Sr. Tooling Engineer (as Automotive Industries, Inc.,

Winchester, VA)

. Establish cost for new tooling & estimating cycles for quoting new

business

. Develop & follow new tooling from design through production stages

. Provide engineering input for "design for manufacturing"

4/93 - 6/94: Sr. Manufacturing Engineer/Tool Room Manager (As O'Sullivan

Corporation, Winchester, VA)

. Responsible for all current program tooling

. Establish cost & timing for "in house" engineering changes

. Headed the Continuous Improvement Team

. Manufacturing liaison for new tooling design input & approval

General Motors, Inland Fisher Guide Division, Syracuse, NY

2/89 - 4/93: Injection Molding Manufacturing Engineer

. Develop & follow new tooling from design through production stage

. Establish production processes & methods for manufacturing

. Provide engineering input for "design for manufacturing"

. Establish cost & timing for tooling changes & new program tooling

. Injection molding machines from 700 ton to 3300 ton

Poly-Pro Incorporated, Rochester, NY

1/88 - 8/88: Plant Manager

. Responsible for all plant operations

. Injection molding facility with machines ranging from 40 ton to 700 ton,

complete mold build facility

Syracuse Plastics Incorporated, Fayetteville, NY

1/84 - 1/88: Manufacturing Manager

. Responsible for molding, assembly, shipping, receiving, & raw materials

departments

. Installed "Mattec" Production Monitoring System

. Selected & installed parts removal robots

Poly-Pro Incorporated, Rochester, NY

9/76 - 1/84: Manufacturing Manager

. Responsibilities - same as Syracuse Plastics Inc.

. Implemented an inventory tracking system

. Assisted in the implementation of a "clean room" molding environment

. Installed and operated "closed loop" controllers for precision molding

applications

. Followed career path through hands-on involvement: mold set up, process

technician, shift supervisor, general supervisor

. Products included medical devices, business machine parts, automotive

connectors and Fisher Price toys

EDUCATION

Currently enrolled at Eastern Michigan University to complete Business

Management degree

5/91: Geometric Dimensioning & Tolerancing, General Motors

Education &

Training, Syracuse, NY

6/88: Hiring & Firing Seminar, Whiting & Associates, Rochester,

NY

5/87: Statistical Process Control, Onondaga Community College,

Syracuse, NY

6/85: General Electric Advanced Molders Workshop, Atlanta, GA

11/81: General Electric Molders Workshop, Pittsfield, MA

1974-1976: Industrial Arts Education, State University of NY, Oswego, NY

1972-1974: Mechanical Engineering, Monroe Community College, Rochester, NY

References available upon request



Contact this candidate