Jagannathan Ramachandran
Phone: Mobile 217-***-**** Home: 217-***-**** 1111 Windham ct,
Email: ***************@*******.*** Bossier city LA
71112
Leading the change ~ Transforming organizations ~ Manufacturing Executive
Passionate, innovative results driven management professional with
multifaceted experience in manufacturing industry. Lean manufacturing
expert with proven track record in productivity improvements that increased
the operating profits. Able to transform the organizational vision into
simpler goals and persuades others to achieve those. A history of
significant profit, volume & customer satisfaction achievements, which
illustrate the ability to combine cost control, revenue growth and process
improvements through effective personnel training & motivation.
STRATEGIC PLANNING TEAM BUILDING PROJECT
MANAGEMENT
PROFITABILITY IMPROVEMENTS SIX SIGMA LEAN
MANUFACTURING
CHANGE MANAGEMENT LEADERSHIP STAFF
DEVELOPMENT
Orica USA Inc. Watkins CO
Mar 09 - Present
Orica is the world's leading manufacturer of mining explosives &
services for commercial mining industry.
Corporate Lean Six sigma Black Belt
Transformation of three manufacturing sites operationally and to
embrace lean six sigma culture as way of life& deliver an EBIT of
$1Million.
Accomplishments:
. Increased the throughput by 94% through cross functional
team using lean principles of VSM, flow & RCA in the
booster optimization project.
Advanced Filtration Systems Inc. ? Champaign IL
Aug 04 - Mar 09
AFSI manufacturer's fluid filters & systems for Caterpillar diesel
engine applications to serve their OEM & off highway vehicles markets.
AFSI operates with four automated production lines and 250 non union
employees.
Program Manager Sep 08 -
Mar09
To provide leadership and coordinate the design, manufacturing and
integration supply chain functions for next generation filter
assemblies to enhance profit margin and prevent the recurring
design issues.
Re layout the two filter manufacturing lines to increase the
profitability by floor space & labor optimization
Continuous Improvement Manager Sep 07 - Dec 08
Lead the implementation of continuous improvement through five
personnel department & mtg. team.
Improvement of existing process and products through continuous
improvement principles
Deployment of lean manufacturing tools such as Rapid
improvements,5S, VF, QCO, Kanban, Pull & VSM
Promote the continuous improvement culture inside the plant.
Accomplishments:
. $34 Million revenue capacity plan was presented to
management to meet forecasted demand with two year ROI.
. $5Million reduction in capital expenditure using lean
plant layout for AFSI -Europe
. Delivered $1 Million savings by converting 24x7 to 24x5
operations.
. Optimized supply chain inventory for Chin Precision by
creating inventory management plan.
. Created the Rapid Improvement program through employee
empowerment & learning
. Developed & executed the strategic annual plan for the
department.
Lean Manufacturing Engineer Sep 05 - Sep 07
Lead the implementation of Toyota production system principles
through high performance zone teams.
Improvement of existing process and products through continuous
improvement principles.
Deployment of lean manufacturing tools such as 5S, VF, QCO, Kanban,
Pull & VSM
Promotion of the TPS culture inside the plant.
Accomplishments:
. $125,000 savings by reducing changeover time at spin
forming loader by 20 mins.
. Provided comprehensive management training in Toyota
production system.
. Prevented customer shutdown by leading a kaizen event
for waviness of synthetic filters.
. Improved capacity through better packaging methods and
eliminated 4 temporary positions.
. Developed tools for capacity & capability of machines to
facilitate better decision making
. Challenged "status quo" & Inspired people for higher
performance
. Led numerous kaizen workshops with significant
improvements.
Manufacturing Engineer Aug 04 - Sep 05
Provide engineering support to the production line at beading,
spin forming processes & assembly area.
Design & development of new products &processes
Design tooling to support the new products & ensure
functionality, quality and cost of products
Improvement of existing process and products through continuous
improvement principles
Research, recommend, purchase and install the new machines.
Key Accomplishments:
. Designed tooling to reduce changeover time at assembly
gantry by 15 min with savings of $100000
. Launched the new product 1809 Base assemblies for
Caterpillar.
. Improved & standardized the process of design &
development of Urethane molds
. Exhibited excellent project management skill through on
time installation of Centrasep cleaning system with in
budget
Collins & Aikman Corporation ? Morristown IN
Jan 03 - Aug 04
C&A Morristown operations is a 300 employee unionized plant that
manufactures class "A" automotive interior and exterior components to
Toyota, GM, Chrysler, Ford & Mitsubishi. The operations include
injection molding, assembly & paint processes.
Continuous Improvement, Engineering Change & TS-16949 Coordinator
Aug 03 - Aug 04
Lead the implementation of lean manufacturing, coordinate the
TS:16949 certification & Eng. changes
Coordinate the conversion of QS9000 to TS:16949
Coordinate engineering changes across all department's to ensure
on time completion.
Develop the process audits for continual evaluation as per TS:
16949
Key Accomplishments:
. Teamed with engineers to develop FMEA's & Control plan
for new products
. Successful conversion from QS9000 to TS:16949 &
recertification
. Developed the measurement system for document controller
& continual EC review process
. Improved the document control change time by 80%
. Developed Activity Based Cost estimation for 2005 Ford
Mustang parts.
. Created the plant profile presentation for GM-Hummer
business.
Continuous Improvement Coordinator
Jan 03- Aug 03
Provide training & assistance in implementation of Toyota
Production System for associates and plant management through
empowered teams, lean workshops & kaizen team activities.
Identified target areas for improvements and accountable for the
implementation of best practices. Continuous improvement of
operational metrics -quality, cost & delivery.
Key Accomplishments:
. Created weekly waste reduction program that produced
$500,000 annual savings
. Reduced press changeover time from 75 min to 30 min with
$150000 impact to bottom line
. Generated $150,000 supplier cost reduction in Ford
console assembly parts
. Provided $70,000 cost savings through use of returnable
packaging.
. Redeployed 10 operators through kaizen activities with
impact of $294,000 to profitability
. Improved productivity by 40% through line balancing
activities in Ford console assembly
. Reduced floor space requirement by 29% through 5S
. Reduced machine down time by 8.3% through Total
Productive Maintenance
. Introduced lean in new product introductions to reduce
capital expenditures
Previous Experiences:
Center for Robotics & Manufacturing Systems -University of Kentucky,
Lexington KY 2001-2002
Maruthi Castings, Coimbatore INDIA
2000
LMW-GKDITR, Coimbatore INDIA
1999
Wheel & Axle Plant, Coimbatore INDIA
1999
Lakshmi Machine Works, Coimbatore INDIA
1998
EDUCATION
University of Illinois- Urbana, IL MBA
2006-2008
Master of Business Administration in General Management
University of Kentucky, Lexington KY MS
2001-2003
Master of Science in Manufacturing Systems Engineering (Lean & Operations)
Amrita Institute of Technology & Science, Coimbatore, INDIA BE
1996-2000
Bachelor of Engineering in Production Engineering
Skill Sets:
CAD/CAM/Simulation: SDRC-IDEAS, ANSYS, Auto CAD, CATIA, PRO-E,
Solid Works, Pro-Model, Arena
Programming: C, C++, VC++, VB, Oracle, SQL, Java, Microsoft office
& Project, IBM-Lotus
MRP/ Database/ Others: Oracle, Fourth Shift, SAP, Fanuc Robotics&
CNC controller, CNC Programming
Key Words: Lean mfg, TPS, Operations Research, Strategy, Automotive,
injection molding, Casting, machining. TPM. [pic][pic][pic]