Rick Baker
***** ***** ****, **** ********, IN **060
Cellular 513-***-****, **********@****.***
http://www.linkedin.com/in/rickabaker
[pic]
Summary
Over 10 years of construction experience in Design Engineer, Lead
Estimator, Assistant Project Manager, and Project Manager / Estimator
positions. Skilled in all types of construction including but not limited
to commercial, residential, interior renovations, structural steel, tilt-
up, as well as pre-engineered metal buildings. The projects I participate
in are consistently under budget, maximizing profit without compromising
integrity or quality.
Experience
Cincinnati United Contractors, Cincinnati, OH
Pre-Construction Services, 2008 - 2009
. Generated proposals, specifications, scope of work, and estimates based
on meeting with clients and architects.
. Developed and maintained estimating database using Timberline software.
. Produced and submitted RFP's to subcontractors and vendors.
. Analyzed and evaluated subcontractor proposals from all trades.
. Presented proposals to potential clients.
Maxwell Construction, Greendale, IN
Project Manager / Estimator, 2006 - 2008
. Provided management service that guaranteed projects were finished on-
time, within budget and ensured project was built in accordance with the
contract documents.
. Coordinated and scheduled subcontractors and vendors.
. Worked closely with architects and engineers in reviewing drawings and
specifications.
. Prepared budgets, work/purchase orders, owner contracts, bids, and
proposals.
. Scheduled, conducted, and participated in project meetings.
. Reviewed payroll, invoices, and coding for cost control.
. Negotiated work orders and purchase orders with subcontractors and
vendors.
Maxwell Construction, Greendale, IN
Lead Estimator, 2004 - 2006
. Assisted project managers with submittals, evaluating bids, work
orders, change orders, created and maintained primavera schedules.
. Generated proposals complete with estimate, specifications, and design
documents.
. Worked closely with owners taking projects from proposal to contract
stage.
. Analyzed past and current projects to develop spreadsheets and data to
support the company with accurate pricing.
Maxwell Construction, Greendale, IN
Civil, Architectural, and Structural Designer, 2002 - 2004
. Developed proposal drawings from owner meetings.
. Designed full sets of construction drawings using AutoCAD.
. Provided technical support during construction.
. Performed site and building layout using surveying equipment.
Education
Associate of Applied Science, Construction Management
Cincinnati State, Cincinnati, OH
Civil Engineering Technology
. Deans List Honors
Rick Baker
29419 Stout Road, West Harrison, IN 47060
Cellular 513-***-****, **********@****.***
http://www.linkedin.com/in/rickabaker
[pic]
PROJECT LIST
(Partial)
NEW CONSTRUCTION Location Value
Dearborn Savings: Design-build 2-story bank with Lawrenceburg, $1.7M
offices on 2nd floor and adjacent retail space. IN
Honda Distribution Center: Structural steel 2-story Greensburg, IN $3M
structure with office space, cafeteria, and meeting
rooms.
Peoples Community Bank: Bank project with a drilled Aurora, IN $1.3M
pier and grade beam foundation system.
Honda Guardhouses: Three (3) structural steel Greensburg, IN $1M
buildings designed to power exterior lighting and
plant security.
Alig Shell Station: 4,414 sq. ft. design-build retail St. Leon, IN $530K
project with adjacent garage including demolition of
existing gas station.
S & L Retail Mall: 7,370 sq. ft. design-build retail Greendale, IN $1M
building.
Dr. Kick Medical Building: 7,400 sq. ft. design-build Batesville, IN $700K
medical office.
Gastroenterology Consultants of Cincinnati: Medical Lawrenceburg, $210K
office tenant build-out. IN
St. John's Community Hall: 5,560 sq. ft. design-build Dover, IN $330K
project consisted of reception hall, bathrooms, and
kitchen.
NEW CONSTRUCTION / HISTORIC PRESERVATION
Hoosier Place Apartments: 31 new apartments in Union City, IN $3M
existing historic school structure along with site
improvements.
Pieratt Communications Radio Station: Radio station Lawrenceburg, $600K
and offices with additional business rental space IN
within existing historic Masonic Temple.
RENOVATION / ADDITION
D&D Vending Addition: Design-build pre-engineered Greendale, IN $900K
metal building addition along with interior office
renovation.
DCS & DFR Interior Renovation: Design-build Greendale, IN $165K
renovation of office and lobby areas in phases to
maintain minimal distractions.
Bright Medical Center Renovation: Design-build Bright, IN $90K
renovation of offices.
SITE IMPROVEMENT PROJECTS
Rising Sun Skate Park: Site development, concrete and Rising Sun, IN $350K
custom fabricated railing and signage project.
Alig Shell Site Development: Cut and filled St. Leon, IN $60K
approximately 2,000 cy of material and moved
utilities to prepare site for new facility.