DAVID W. BARLOW
**** ****** ****** **** 208-***-****
Pocatello, ID 83201 abnbeq@r.postjobfree.com
SKILLS/QUALIFICATIONS
*Substantial Experience with Public Work (Corps of Engineers, DOT,
Municipalities)
*Proficient with both traditional and Design-Build project delivery
methods.
*Well versed in long term and short range scheduling.
* Possess a solid understanding of fixed and variable costs associated with
equipment utilization.
* Have working knowledge of Union and Non-union work environments.
*Participated and trained in Competent Person, Traffic Control, Confined
Space, Crane Safety and First Aid.
*Proficient with Scheduling, Costing and Estimating Software (Bid2Win,
HCSS, Viewpoint, JD Edwards, Primavera, Microsoft Office)
* Capable and able to function as Superintendent and/or Field Project
Manager.
EMPLOYMENT
2006-Present STAKER PARSON COMPANIES
Project Manager /Estimator-Pocatello Operations
*City of Rocks BC Biway, Idaho Transportation Department
* Satellite Casino, Fort Hall Reservation, Idaho
* Simplot Acid Line Replacement-Pocatello, Idaho
* McDonalds Reconstrucion-Pocatello, Idaho
* Alco Store site work contractor- Preston and American
Falls, Idaho
* Linden Avenue Reconstruction-City of Chubbuck, Idaho
* Pocatello Regional Airport -Pocatello, Idhao
* KBC Farms Subdivision- American Falls, Idaho
* FBI facility parking expansion-Pocatello, Idaho
2004-2005 SIERRA NEVADA CONSTRUCTION, INC.
2055 East Greg Street, Sparks, NV 89431 775-***-****
Project Manager/Estimator
Estimated, scheduled, planned managed various projects.
. Caltrans 09-287904, Big Pine, California, State
Highway 395 rehabliltation. Contract value
$3,800,000.
. Mammoth Lakes, CA. On-site Project Manager for
Sitework/grading projects.
. Estimated various public works contracts throughout
in the Northern Nevada and Northern California area.
2001-2004 GRAN ITE CONSTRUCTION COMPANY
1900 Glendale Avenue, Sparks, NV 89431 775-***-****
. Estimator
Participated in multiple estimating and engineering
efforts
including the I-80/US 395 and Carson City Bypass
Bids.
$55 and $70 million, respectively.
. Project Engineer/Project Manager
$22 million Caltrans Project, Mt. Shasta,
California.
Performed duties pertaining to overall safety,
project
scheduling, cost control and revenue management.
Scope
of work included roadway excavation, base/paving and
concrete paving, structures work and traffic control.
1999-2001 JAMES W. FOWLER COMPANY
12775 Westview Drive, Dallas, Oregon 97423 503-***-****
Project Superintendent.
Estimated, scheduled and managed various projects
including the
following;
. Oak Creek Site Development, Albany, Oregon.
. Site work and structure demolition- Silverton
Wastewater
Treatment Plant, Silverton, Oregon
. 12th Street Improvement Project, Salem, Oregon
. SW 124th and Leveton Streets, Tualatin, Oregon
. T.A.P. Intertie Project, Medford, Oregon
1993-1999 GRANITE CONSTRUCTION COMPANY
Heavy Construction Division, 585 West Beach Street, Watsonville,
California 831-***-****
. November 1998- June 1999: Field Superintendent
I-17, Reconstruction Project, Phoenix, Arizona,
Arizona Department of Transportation. $79.3
million,
. Design-Build Project. Responsible for night shift
operations including; traffic control, excavations/
subcontractor coordination and over-all crew safety.
. April 1998-November 1998. Field Superintendent,
Cottonwood Segment, I-15 Reconstruction, Salt Lake
City, Utah. $400 million portion of a $1.36 billion,
Design-Build Project. Responsible for grading,
drainage, minor structures, utility relocations and
traffic control. Directed multiple foremen and
crews, multiple shift operations.
. March 1997-April 1998. Area Field Engineer, I-15
Reconstruction. Provided Direct Support to
Superintendents and production crews. Coordinated
with owner representatives, designers, subcontractors
and other stakeholders.
. September 1996-March 1997. On-Site Representative, I-
15 Corridor Reconstruction. Provided direct support
to Joint Venture team during the estimating and
proposal process.
. January 1994-September 1996, Field/Office Engineer,
Sam Rayburn Spillway Modifications, Jasper, Texas.
$27.4 million Corps of Engineer Project. Responsible
for tracking quantities, preparing pay estimates,
support and coordination with production crews,
suppliers, and subcontractors.
. 1993-1994. Junior Estimator, Watsonville,
California.
EDUCATION Bachelors of Science, 1993, Construction Engineering
Management, Oregon State University, Corvallis, Oregon.
High School Diploma, 1987, Myrtle Point, Oregon 97458.
REFERENCES Available upon request.