CAREER HISTORY.
JULY 2011 - Sept. 2012 TECHNIP BENELUX B.V.
GLENCORE INTERNATIONAL A.G.
HUNGARY.
COMMISSIONING START-UP LEAD
SUPERVISIOR.
Bio Fuel Multi Seed Crushing
Plant, Processing 2,000 tons of seed
per day, Producing approx.
800 t/day vegetable oil.
MAY 2009 - APR. 2011 FATIMA FERTILIZER COMP. PAKISTAN.
SENIOR COMMISSIONING ENGINEER.
Responsible for pre-
commissioning, commissioning and
Start-up of the following
units. AMMONIA, UREA, MPK, CAN,
NA, BAGGING, UTILITYS &
OFFSITES.
Ensure safe start-up and
meeting all planned schedule targets.
Training local personnel in
the safe and efficient operation of the
plant
AUG 2008 - MAY 2009 P.D.O. OMAN. SRDC PROJECT. GAS PLANT.
Commissioning Coordinator.
Liaise with Contractors.
Responsible for control and implementation of
Pre-commissioning and
commissioning activities. Ensuring safe start-up.
Meeting all planned scheduled targets. On new Gas
Plant.
JAN.2008 - JULY 2008. TECNICAS REUNIDAS. KUWAIT (K.O.C.)
OIL GAS SEPARATION PLANT
SENIOR COMMISSIONING ENGINEER.
Responsible for pre-commissioning,commissioning and
Start-up. Ensure safe start-up and
meeting all planned schedule targets.
Training local personnel
in the safe and efficient operation of the
plant.
JAN.2007 - DEC2007 PETROFAC. KAUTHER GAS PANT. OMAN. (P.D.O.)
SENIOR COMMISSIONING ENGINEER.
Responsible for pre-commissioning,
commissioning and start-up
of the Gas Plant. Supervising
commissioning operators.
Ensure safe start-up & meeting
planned schedule targets.
Training local
personnel in the safe and efficient operation of the
plant
FEB 2006 - NOV 2006 LINDE/B.O.C. HYDROGEN PROJECT. TOLEDO & LIMA
REFINERYS.
OHIO, USA.
SENIOR COMMISSIONING /
START-UP ENGINEER
Responsible for commissioning and
start- up of three Hydrogen trains each producing
55mmscfd...Process includes Nuovo Pignone compressors and
associated Utilities units.
Ensure safe start-up and meeting planned schedule targets.
Training local personnel in
the safe and efficient operation of the
plant.
JUNE 2005 - JAN 2006 CSPC PETROCHEMICAL PROJECT, NANHAI, GUANGDONG.
P.R. CHINA
SENIOR COMMISSIONING ENGINEER.
Supervising a multi national workforce on a
Ethylene/Propylene plant, responsible for the pre-
commissioning, commissioning of Storage Spheres and
Atmospheric Tanks.
The Unit consists 14 Storage Spheres, 9 Hydrocarbon/Solvent
Storage Tanks and also included, a Vapour Recovery Unit,
Firewater Foam Systems and Export Pumping Facilities.
Activities included flushing
and blowing of lines, tightness testing, dry-out
to dew point,nitrogen
inerting,punchlisting and equipment function testing
Training local personnel in
the safe and efficient operation of the
plant.
NOV 2004 - APRIL 2005 LURGI ENGINEERING, METHANEX 4 PROJECT, PUNTA
ARENAS, CHILE
SENIOR COMMISSIONING ENGINEER.
Responsible for construction and commissioning of a
2400t/day Methanol Plant utilising new process technology.
Responsible for control and implementation of pre-
commissioning / commissioning activities and supervision of
client's operations team and subcontract personnel to
ensure safe start up and meeting planned schedule targets.
Training local personnel in
the safe and efficient operation of the
plant.
MAR 2003 - SEPT 2004 ATLANTIC METHANOL COMPANY: MALABO,
EQUATORIAL GUINEA.
ASSISTANT PRODUCTION/MAINTENANCE COORDINATOR.
Duties were to assist the Production/Maintenance
Coordinator in planning, all day to day, shutdown, first
outages and turnaround activities. Assisting in the day-to-
day operation and maintenance activities of the Methanol
Plant and all utilities in a safe and efficient manner.
Meet and exceed all Plant objectives, no lost time
injuries. Maintains environmental prudence. Assisting in
meeting and exceeding production forecasts and shipping
forecasts. Maintains the Plant in the highest state of
productivity and ensures all operations employees are
trained correctly..
JAN 2000 - MAR 2003 ATLANTIC METHANOL COMPANY: MALABO,
EQUATORIAL GUINEA.
SENOIR SHIFT SUPERVISOR.
Responsible for the pre-commissioning, commissioning, start-
up and day-to-day operation of a 2500 MTPD Methanol plant.
Initially posted to company offices in Houston, Texas and
then to site in Malabo, Equatorial Guinea. Supervising an
expatriate & Filipino workforce in pre-commissioning,
commissioning and start-up of all process and utilities
systems.
Process includes: Foster Wheeler steam reformer, Mitsubishi
Synthesis Gas, Circulator and Booster compressors, Methanol
converter and Distillation, Product storage and ship
loading facilities. Utilities includes: Foster Wheeler
package boilers, Solar Taurus generators, Desalination
units, Demineralisation units, Cooling Water, Potable
water, Firewater, Clarifier, Oily water separator and
Chemical injection.
Process and Utilities controlled by PC based Moore DCS
system.
Training local personnel in
the safe and efficient operation of the
plant.
JUN 1995 - JAN 2000 SYRIAN PETROLEUM COMPANY SOUEDIE. LNG GAS PLANT,
KAMISHLY, SYRIA.
OPERATIONS ADVISOR/ SENOIR SUPERVISOR.
Assigned to a gas process treatment plant, receiving
associated gas from over 700 oil wells through 5 GOSP
areas. Duties included outside plant and Control Room
operation, plus supervision of Syrian national operations
personnel on the following: 3 X LP Process gas compressor
trains, Di-isoethanol amine acid gas absorption / amine
regeneration unit, "Claus" Sulphur recovery unit, Molecular
Sieve dehydrators and regenerators, 3 X HP Process Gas
compressor trains, Cold Gas separation NGL recovery unit
(Cryogenics) incorporating a C3 refrigerant closed loop
system, Fractionation, De-etheriser, LPG Splitter,
Depentaniser, Solvent Splitter, 2 X "York" C3 Refrigerant
compressors. Utilities included: 2 X "Babcock & Wilson" HP
Boilers and Utilities, De-ionisation Water Treatment plant,
LPG and Gasoline storage and Export facilities and LPG
Bottling Plant.
Training local personnel in
the safe and efficient operation of the
plant
JAN 1994 - MAY 1995 CRADDOCK UK LTD ZUEITINA OIL COMPANY, TRIPOLI, LIBYA
OPERATIONS ADVISOR / SUPERVISOR.
Assigned to a Gas Injection, Condensate Recovery and LPG
plant.
Plant 1 - Gas Injection plant comprising of 4 x 250 mm SCFD
Gas Injection Multi Stage compressor trains injecting at up
to 4000 PSIG. Equipment included Pratt & Whitney gas
turbines, Dresser Clark compressors with associated coolers
and separators.
Plant 2 - HP/LP Condensate recovery and LPG system.
Equipment included 4 stage Dresser Clark compressor,
Propane compressor, Glycol Gas Dehydration unit and
associated coolers, chillers and exchangers.
Utilities includes: 2 X "Babcock & Wilson" HP Boilers,
Solar Taurus generators, Desalination units,
Demineralisation units, Cooling Water, Potable water,
Firewater, Clarifier, Oily water separator and Chemical
injection.
Process and Utilities controlled by PC based Moore DCS
system.
Responsibilities included: Day to Day plant operations,
preparing equipment for maintenance as required,
Shutdown/Start-up of all process equipment as instructed by
senior management, On the job training of local personnel
in the safe and efficient operation of the plant.
Training local personnel in the
safe and efficient operation of the
plant.
JUL 1991 - DEC 1993 MW KELLOGG LTD. TUGSAS, GEMLIK, TURKEY.
OPERATIONS ADVISOR/ SUPERVISOR.
Duties included all hands on operational duties on the 1000
MTPD Ammonia Plant during the pre-commissioning,
commissioning, start-up and test run of the unit, with
responsibility for on the job training of the client's
operations personnel in the safe and efficient operation of
the plant. The unit consisted of the following equipment:
Steam Reforming, Benfield CO2 removal system, Gas
compression, Synthesis loop and Refrigeration unit.
Utilities included: Foster Wheeler package boilers, Solar
Taurus generators, Desalination units, Demineralisation
units, Cooling Water, Potable water, Firewater, Clarifier,
Oily water separator and Chemical injection.
Training local personnel in
the safe and efficient operation of the
plant.
SEP 1990 - JUN 1991 CAPPO INTERNATIONAL LTD. FINANESTA REFINERY,
ANTWERP, BELGIUM.
COMMISSIONING ENGINEER.
Responsible for the, for the pre-commissioning,
commissioning and start-up of the following: 450,000 MTPD
Kellogg design Ethylene Plant, CCR unit, Naphtha Splitters,
Hydrotreater unit.
Responsible for flushing and blowing of lines,
punchlisting, valve checking and stroking. Duties included
all hands-on operational duties on the various units during
start-up. Utilities included: Foster Wheeler package
boilers, Solar Taurus generators, Desalination units,
Demineralisation units, Cooling Water, Potable water,
Firewater, Clarifier, Oily water separator and Chemical
injection.
JUL 1989 - AUG 1990 CAPPO INTERNATIONAL LTD. HOWE-BAKER ENG INC, TYLER,
TEXAS.
COMMISSIONING ENGINEER.
Responsible for pre-commissioning, commissioning, start-up
and test run of 5 Crude Oil Topping plants and associated
utilities units in SAUDI ARABIA (each unit had a capacity
of 13,000 BPSD)
Utilities included: Foster Wheeler package boilers, Solar
Taurus generators, Desalination units, Demineralisation
units, Cooling Water, Potable water, Firewater, Clarifier,
Oily water separator and Chemical injection.
Duties were to produce on specification product, to
supervise 20 TCN Operators and to carry out on the job
training of local Operators in the safe and efficient
operation of the plant.
JUN 1988 - MAY 1989 KTI, CALIFORNIA, USA. HAZIRA INDIA.
COMMISSIONING ENGINEER.
Responsible for the commissioning, start-up and test run of
an NGL/LPG plant at Hazira, India. Duties included hands-on
operations during the commissioning; start-up and test run
of the various units, producing on specification product
and to carry out on the job training of local Operators in
the safe and efficient operation of the plant. The plant
consisted of the following units: Condensate Fractionation,
Gas Treatment, Sulphur Recovery, Gas Dehydration, Dew Point
Depression, Compression, LPG and Utilities. Utilities
included: Foster Wheeler package boilers, Solar Taurus
generators, Desalination units, Demineralisation units,
Cooling Water, Potable water, Firewater, Clarifier, Oily
water separator and Chemical injection. All processes
controlled and monitored by Yokogawa Centrum DIDC system.
FEB 1981 - APR 1988 ARAMCO . SAUDI ARABIA.
OPERATIONS ADVISOR/SUPERVISOR.
Responsible for all duties in the field and Control Room on
a 1.5 billion SCFD NGL/LPG plant where associated gas from
oil wells is separated and heavy ends liquefied.
Duties included ensuring on specification production, on
the job training of Saudi Nationals in all aspects of field
and control room duties required for the safe and efficient
operation of the plant. Involved in liaison with the
control instrument group during the installation and start-
up of the Control room for the following units: Gas
Treatment, Sulphur Recovery, Gas Dehydration, Dew Point
Depression, Condensate Fractionation, Compression, and
Steam Generation.
Utilities included: Foster Wheeler package boilers, Solar
Taurus generators, Desalination units, Demineralisation
units, Cooling Water, Potable water, Firewater, Clarifier,
Oily water separator and Chemical injection.
Equipment used included: Absorbers, Condensers, Reactors,
Converters, Strippers, Gas Furnaces, Steam Turbines, High
Capacity pumps and Compressors.
All processes controlled by Honeywell TDC 4500 & 2000 DCS.
FEB 1966 - DEC 1980 DUPONT UK LTD.
PROCESS OPERATOR/SUPERVISOR.
Responsible for supervising overall shift duties on a
Hydrogen/Carbon Monoxide plant.
Utilities included: Foster Wheeler package boilers, Solar
Taurus generators, Desalination units, Demineralisation
units, Cooling Water, Potable water, Firewater, Clarifier,
Oily water separator and Chemical injection.
Duties included ensuring on specification production,
Upkeep of Supervisor's logbook, reporting of plant upsets
to Shift Foreman and on the job training of new personnel
in the duties required for the safe and efficient operation
of the plant.
Equipment used included: Oil fired Reformer, CO Absorbers
MEA and Copper liquor, Condensers, Methanator, Strippers,
Gas Turbines, High Capacity pumps and Compressors.
All processes controlled and monitored by Honeywell
instrumentation.