CAREER HISTORY.

JULY 2011 - Sept. 2012 TECHNIP BENELUX B.V.

GLENCORE INTERNATIONAL A.G.

HUNGARY.

COMMISSIONING START-UP LEAD

SUPERVISIOR.

Bio Fuel Multi Seed Crushing

Plant, Processing 2,000 tons of seed

per day, Producing approx.

800 t/day vegetable oil.

MAY 2009 - APR. 2011 FATIMA FERTILIZER COMP. PAKISTAN.

SENIOR COMMISSIONING ENGINEER.

Responsible for pre-

commissioning, commissioning and

Start-up of the following

units. AMMONIA, UREA, MPK, CAN,

NA, BAGGING, UTILITYS &

OFFSITES.

Ensure safe start-up and

meeting all planned schedule targets.

Training local personnel in

the safe and efficient operation of the

plant

AUG 2008 - MAY 2009 P.D.O. OMAN. SRDC PROJECT. GAS PLANT.

Commissioning Coordinator.

Liaise with Contractors.

Responsible for control and implementation of

Pre-commissioning and

commissioning activities. Ensuring safe start-up.

Meeting all planned scheduled targets. On new Gas

Plant.

JAN.2008 - JULY 2008. TECNICAS REUNIDAS. KUWAIT (K.O.C.)

OIL GAS SEPARATION PLANT

SENIOR COMMISSIONING ENGINEER.

Responsible for pre-commissioning,commissioning and

Start-up. Ensure safe start-up and

meeting all planned schedule targets.

Training local personnel

in the safe and efficient operation of the

plant.

JAN.2007 - DEC2007 PETROFAC. KAUTHER GAS PANT. OMAN. (P.D.O.)

SENIOR COMMISSIONING ENGINEER.

Responsible for pre-commissioning,

commissioning and start-up

of the Gas Plant. Supervising

commissioning operators.

Ensure safe start-up & meeting

planned schedule targets.

Training local

personnel in the safe and efficient operation of the

plant

FEB 2006 - NOV 2006 LINDE/B.O.C. HYDROGEN PROJECT. TOLEDO & LIMA

REFINERYS.

OHIO, USA.

SENIOR COMMISSIONING /

START-UP ENGINEER

Responsible for commissioning and

start- up of three Hydrogen trains each producing

55mmscfd...Process includes Nuovo Pignone compressors and

associated Utilities units.

Ensure safe start-up and meeting planned schedule targets.

Training local personnel in

the safe and efficient operation of the

plant.

JUNE 2005 - JAN 2006 CSPC PETROCHEMICAL PROJECT, NANHAI, GUANGDONG.

P.R. CHINA

SENIOR COMMISSIONING ENGINEER.

Supervising a multi national workforce on a

Ethylene/Propylene plant, responsible for the pre-

commissioning, commissioning of Storage Spheres and

Atmospheric Tanks.

The Unit consists 14 Storage Spheres, 9 Hydrocarbon/Solvent

Storage Tanks and also included, a Vapour Recovery Unit,

Firewater Foam Systems and Export Pumping Facilities.

Activities included flushing

and blowing of lines, tightness testing, dry-out

to dew point,nitrogen

inerting,punchlisting and equipment function testing

Training local personnel in

the safe and efficient operation of the

plant.

NOV 2004 - APRIL 2005 LURGI ENGINEERING, METHANEX 4 PROJECT, PUNTA

ARENAS, CHILE

SENIOR COMMISSIONING ENGINEER.

Responsible for construction and commissioning of a

2400t/day Methanol Plant utilising new process technology.

Responsible for control and implementation of pre-

commissioning / commissioning activities and supervision of

client's operations team and subcontract personnel to

ensure safe start up and meeting planned schedule targets.

Training local personnel in

the safe and efficient operation of the

plant.

MAR 2003 - SEPT 2004 ATLANTIC METHANOL COMPANY: MALABO,

EQUATORIAL GUINEA.

ASSISTANT PRODUCTION/MAINTENANCE COORDINATOR.

Duties were to assist the Production/Maintenance

Coordinator in planning, all day to day, shutdown, first

outages and turnaround activities. Assisting in the day-to-

day operation and maintenance activities of the Methanol

Plant and all utilities in a safe and efficient manner.

Meet and exceed all Plant objectives, no lost time

injuries. Maintains environmental prudence. Assisting in

meeting and exceeding production forecasts and shipping

forecasts. Maintains the Plant in the highest state of

productivity and ensures all operations employees are

trained correctly..

JAN 2000 - MAR 2003 ATLANTIC METHANOL COMPANY: MALABO,

EQUATORIAL GUINEA.

SENOIR SHIFT SUPERVISOR.

Responsible for the pre-commissioning, commissioning, start-

up and day-to-day operation of a 2500 MTPD Methanol plant.

Initially posted to company offices in Houston, Texas and

then to site in Malabo, Equatorial Guinea. Supervising an

expatriate & Filipino workforce in pre-commissioning,

commissioning and start-up of all process and utilities

systems.

Process includes: Foster Wheeler steam reformer, Mitsubishi

Synthesis Gas, Circulator and Booster compressors, Methanol

converter and Distillation, Product storage and ship

loading facilities. Utilities includes: Foster Wheeler

package boilers, Solar Taurus generators, Desalination

units, Demineralisation units, Cooling Water, Potable

water, Firewater, Clarifier, Oily water separator and

Chemical injection.

Process and Utilities controlled by PC based Moore DCS

system.

Training local personnel in

the safe and efficient operation of the

plant.

JUN 1995 - JAN 2000 SYRIAN PETROLEUM COMPANY SOUEDIE. LNG GAS PLANT,

KAMISHLY, SYRIA.

OPERATIONS ADVISOR/ SENOIR SUPERVISOR.

Assigned to a gas process treatment plant, receiving

associated gas from over 700 oil wells through 5 GOSP

areas. Duties included outside plant and Control Room

operation, plus supervision of Syrian national operations

personnel on the following: 3 X LP Process gas compressor

trains, Di-isoethanol amine acid gas absorption / amine

regeneration unit, "Claus" Sulphur recovery unit, Molecular

Sieve dehydrators and regenerators, 3 X HP Process Gas

compressor trains, Cold Gas separation NGL recovery unit

(Cryogenics) incorporating a C3 refrigerant closed loop

system, Fractionation, De-etheriser, LPG Splitter,

Depentaniser, Solvent Splitter, 2 X "York" C3 Refrigerant

compressors. Utilities included: 2 X "Babcock & Wilson" HP

Boilers and Utilities, De-ionisation Water Treatment plant,

LPG and Gasoline storage and Export facilities and LPG

Bottling Plant.

Training local personnel in

the safe and efficient operation of the

plant

JAN 1994 - MAY 1995 CRADDOCK UK LTD ZUEITINA OIL COMPANY, TRIPOLI, LIBYA

OPERATIONS ADVISOR / SUPERVISOR.

Assigned to a Gas Injection, Condensate Recovery and LPG

plant.

Plant 1 - Gas Injection plant comprising of 4 x 250 mm SCFD

Gas Injection Multi Stage compressor trains injecting at up

to 4000 PSIG. Equipment included Pratt & Whitney gas

turbines, Dresser Clark compressors with associated coolers

and separators.

Plant 2 - HP/LP Condensate recovery and LPG system.

Equipment included 4 stage Dresser Clark compressor,

Propane compressor, Glycol Gas Dehydration unit and

associated coolers, chillers and exchangers.

Utilities includes: 2 X "Babcock & Wilson" HP Boilers,

Solar Taurus generators, Desalination units,

Demineralisation units, Cooling Water, Potable water,

Firewater, Clarifier, Oily water separator and Chemical

injection.

Process and Utilities controlled by PC based Moore DCS

system.

Responsibilities included: Day to Day plant operations,

preparing equipment for maintenance as required,

Shutdown/Start-up of all process equipment as instructed by

senior management, On the job training of local personnel

in the safe and efficient operation of the plant.

Training local personnel in the

safe and efficient operation of the

plant.

JUL 1991 - DEC 1993 MW KELLOGG LTD. TUGSAS, GEMLIK, TURKEY.

OPERATIONS ADVISOR/ SUPERVISOR.

Duties included all hands on operational duties on the 1000

MTPD Ammonia Plant during the pre-commissioning,

commissioning, start-up and test run of the unit, with

responsibility for on the job training of the client's

operations personnel in the safe and efficient operation of

the plant. The unit consisted of the following equipment:

Steam Reforming, Benfield CO2 removal system, Gas

compression, Synthesis loop and Refrigeration unit.

Utilities included: Foster Wheeler package boilers, Solar

Taurus generators, Desalination units, Demineralisation

units, Cooling Water, Potable water, Firewater, Clarifier,

Oily water separator and Chemical injection.

Training local personnel in

the safe and efficient operation of the

plant.

SEP 1990 - JUN 1991 CAPPO INTERNATIONAL LTD. FINANESTA REFINERY,

ANTWERP, BELGIUM.

COMMISSIONING ENGINEER.

Responsible for the, for the pre-commissioning,

commissioning and start-up of the following: 450,000 MTPD

Kellogg design Ethylene Plant, CCR unit, Naphtha Splitters,

Hydrotreater unit.

Responsible for flushing and blowing of lines,

punchlisting, valve checking and stroking. Duties included

all hands-on operational duties on the various units during

start-up. Utilities included: Foster Wheeler package

boilers, Solar Taurus generators, Desalination units,

Demineralisation units, Cooling Water, Potable water,

Firewater, Clarifier, Oily water separator and Chemical

injection.

JUL 1989 - AUG 1990 CAPPO INTERNATIONAL LTD. HOWE-BAKER ENG INC, TYLER,

TEXAS.

COMMISSIONING ENGINEER.

Responsible for pre-commissioning, commissioning, start-up

and test run of 5 Crude Oil Topping plants and associated

utilities units in SAUDI ARABIA (each unit had a capacity

of 13,000 BPSD)

Utilities included: Foster Wheeler package boilers, Solar

Taurus generators, Desalination units, Demineralisation

units, Cooling Water, Potable water, Firewater, Clarifier,

Oily water separator and Chemical injection.

Duties were to produce on specification product, to

supervise 20 TCN Operators and to carry out on the job

training of local Operators in the safe and efficient

operation of the plant.

JUN 1988 - MAY 1989 KTI, CALIFORNIA, USA. HAZIRA INDIA.

COMMISSIONING ENGINEER.

Responsible for the commissioning, start-up and test run of

an NGL/LPG plant at Hazira, India. Duties included hands-on

operations during the commissioning; start-up and test run

of the various units, producing on specification product

and to carry out on the job training of local Operators in

the safe and efficient operation of the plant. The plant

consisted of the following units: Condensate Fractionation,

Gas Treatment, Sulphur Recovery, Gas Dehydration, Dew Point

Depression, Compression, LPG and Utilities. Utilities

included: Foster Wheeler package boilers, Solar Taurus

generators, Desalination units, Demineralisation units,

Cooling Water, Potable water, Firewater, Clarifier, Oily

water separator and Chemical injection. All processes

controlled and monitored by Yokogawa Centrum DIDC system.

FEB 1981 - APR 1988 ARAMCO . SAUDI ARABIA.

OPERATIONS ADVISOR/SUPERVISOR.

Responsible for all duties in the field and Control Room on

a 1.5 billion SCFD NGL/LPG plant where associated gas from

oil wells is separated and heavy ends liquefied.

Duties included ensuring on specification production, on

the job training of Saudi Nationals in all aspects of field

and control room duties required for the safe and efficient

operation of the plant. Involved in liaison with the

control instrument group during the installation and start-

up of the Control room for the following units: Gas

Treatment, Sulphur Recovery, Gas Dehydration, Dew Point

Depression, Condensate Fractionation, Compression, and

Steam Generation.

Utilities included: Foster Wheeler package boilers, Solar

Taurus generators, Desalination units, Demineralisation

units, Cooling Water, Potable water, Firewater, Clarifier,

Oily water separator and Chemical injection.

Equipment used included: Absorbers, Condensers, Reactors,

Converters, Strippers, Gas Furnaces, Steam Turbines, High

Capacity pumps and Compressors.

All processes controlled by Honeywell TDC 4500 & 2000 DCS.

FEB 1966 - DEC 1980 DUPONT UK LTD.

PROCESS OPERATOR/SUPERVISOR.

Responsible for supervising overall shift duties on a

Hydrogen/Carbon Monoxide plant.

Utilities included: Foster Wheeler package boilers, Solar

Taurus generators, Desalination units, Demineralisation

units, Cooling Water, Potable water, Firewater, Clarifier,

Oily water separator and Chemical injection.

Duties included ensuring on specification production,

Upkeep of Supervisor's logbook, reporting of plant upsets

to Shift Foreman and on the job training of new personnel

in the duties required for the safe and efficient operation

of the plant.

Equipment used included: Oil fired Reformer, CO Absorbers

MEA and Copper liquor, Condensers, Methanator, Strippers,

Gas Turbines, High Capacity pumps and Compressors.

All processes controlled and monitored by Honeywell

instrumentation.



Contact this candidate