PAUL N. FAUCHER

*** ***** ****** **** **** Wakefield, MA 01880 781-***-****

OBJECTIVE:

To continue to advance and grow as a Superintendent professionally into Project Management and Estimating Heavy-Highway,

Roadway and Utility Construction projects. To be able to exert my un-teachable qualities of multi-tasking, attention to detail,

and high organizational skills to deliver a high quality product that is delivered safely, under budget, and ahead of schedule.

PROFESSIONAL WORK EXPERIENCE:

SCIBELLI BROTHERS CONTRACTORS – Malden, MA (6/86 to 8/94, 3/07 to Present)

Project Supervisor/Estimator

Responsibilities for Contracting Company specializing in masonry, concrete and site work for commercial buildings

and road/utility projects in the public and private sector include the following:

Daily jobsite supervision, labor/material/equipment procurement, Required layout and verification that

performed work conforms to contract documents, Coordination and supervision of subcontractors; Create and

assemble complete bid proposals/bid packages for prospective projects; Design of projects not requiring a

registered Engineer; Coordination and supervision of snow removal activities.

McCOURT/OBAYASHI JOINT VENTURE – Boston, MA (11/99 to 2/05; 3/06 to 3/07)

Central Artery Tunnel Project C17AA (I-93 Tunnel Finishes Project)

Project Superintendent

Responsible for field supervision, labor/equipment/material procurement, scheduling, coordination, and cost to

complete reports for the following activities:

Extensive preparation and placement of over 2 million square feet of Class “A” Concrete Overlay, and

placement of over 2.75 million square feet of Bituminous Concrete wearing surfaces for I-93 North, South and

related ramps; Full depth roadway and utility construction; Preparation and installation of Elastomeric

Concrete expansion joints; Demolition and repairs to structural invert slabs, wall and ceiling joints; Diamond

Grinding utilized both for demolition and for corrective changes in the roadway profile and cross-section; All

concrete work including C.I.P. barriers, ceilings, stairs, slabs and utility encasements; Training of multiple crews

on the operation and safe use of a 20,000 psi hydro-demolition unit and Bidwell Concrete Paver; Slurry wall

repairs; Leak repair of slurry wall and C.I.P. wall/ceiling joints; Assisted with foreword pricing for change

orders; Coordination with in-house Traffic Engineers along with the Owners Representatives and the

Massachusetts Turnpike Authority for nightly tunnel and ramp closures; Supervision of Bituminous Concrete

paving operations at Logan International Airport; The determination of the most efficient and cost effective

procedures to complete the above activities in a safe and profitable manor.

Assistant Superintendent (11/99 to 4/00)

Responsible for obtaining quotes for Purchase Orders for purchasing of equipment and

materials. Developed a system for tracking quantities and submitting payment requisitions

for all Unit Price and Lump Sum pay items. Coordinating and tracking all work done

outside the contract scope on a Time and Materials Basis. Maintain R.F.I./Field Change

Notification log and ensure ongoing fieldwork conforms to any design changes. Established

and supervised the survey department on a daily basis. Coordination and supervision of

masonry work for Cross Passages, Egress Stairways and Utility Rooms. Assigned work

activity codes to Foremen’s daily time cards; Field verification, that ongoing work of all

tunnel components performed by Ironworkers, Carpenters, Masons, Plumbers, Electricians,

Operators, and Laborers conforms to the contract documents.

JAY CASHMAN CONSTRUCTION (MODERN CONTINENTAL) - Cambridge, MA (2/05 to 3/06)

Massachusetts Highway Department Route 3 Expansion Project

Project Superintendent

This design-build project along the 27 miles of Route 3 from Route 128 to the New Hampshire border included

adding one lane and shoulder in each direction, replacement of 47 bridges, on/off ramp and local road

reconstruction, and drainage/utility improvements. Responsibilities as Project Superintendent included field

supervision, scheduling, and coordination of suppliers union employees, equipment and subcontractors,

quantity take-offs for material procurement and coordination of complex lane closures for the following

activities; Full depth roadway construction, Installation and improvements of drainage, water and

underground electrical systems; Detention pond construction; Installation of bituminous concrete paving;

Installation of over 5 miles of granite curbing; Fiber optic duct bank construction; and all components of

highway, ramp and local road construction.

M. DEMATTEO CONSTRUCTION – Braintree, MA (12/96 to 11/99)

Central Artery Tunnel Project C07D2 (I-90 Logan Airport Interface)

Survey Crew Chief/Field Engineer

Responsibilities included the daily coordination and supervision of up to four survey crews to support construction

activities for a cut and cover tunnel, elevated viaduct roadways, road and utility construction and numerous

permanent and temporary roadway re-alignments accessing a busy international airport; Coordinating with

Superintendents and Foreman on a daily basis to determine optimal layout requirements as work progresses;

Installation and operation of duel-plane laser system for concrete placements of up to 2500 cubic yards; and

Assisted Superintendents with verification that ongoing work conforms with layout given in the field

G.C.G. & ASSOCIATES– Burlington, MA (8/94 to 12/96)

CAD Designer/Surveyor/Field Engineer

Responsibilities for this Civil Engineering and Consulting firm included; Design and drafting of subdivision,

roadway construction, site work, septic system and pump station projects; Layout for contractors as required for

the above mentioned activities; Performing material take-offs and assisting with Engineers’ Estimate for public

work that the firm designed; Collecting existing condition survey data for various projects; Collecting as-built

information; Acting as on-site representative for projects designed by the firm; and Registry of Deeds research.

EDUCATION:

• Wentworth Institute, Boston, MA – AS Construction Management. 1992

• Computer Processing Institute, Cambridge, MA - 900 hour course AutoCAD R12. 1995

• Wakefield High School, Wakefield, MA - 1987 graduate

• Several Seminars on topics ranging from Massachusetts Highway Department Bridge Deck Specification Changes to

Productivity Training to Claims and Changes.

LICENSES:

• Elastomeric Concrete Bridge Expansion Joint Installer.

• Factory trained on setup/operation/crew training by Bidwell on use of concrete paving machine

• Hydro-Demolition Unit Trainer

• Massachusetts Class 2A Hoisting License

COMPUTER SKILLS:

• AutoCAD Releases 12, 13, 14 & 2000

• Soft Desk Civil/Survey applications for AutoCAD

• Microsoft Office Applications

• SharePoint



Contact this candidate