Post Job Free
Sign in

Engineer Project

Location:
Tomball, TX, 77377
Posted:
May 03, 2010

Contact this candidate

Resume:

EDUARDO GONZALEZ

***** ****** ******* ***** *******, TX 77377

Home 281-***-**** Cellular 787-***-****

***********@*****.***

CAREER OBJECTIVE

To advance my Project / Field Engineer career, where my knowledge in

engineering will come in use.

CAREER PROFILE

ACCOMPLISHED PROJECT ENGINEER / FIELD ENGINEER / SERVICE ENGINEER offering

a solid educational background, over 15 years experience, a strong record

of performance in project initiation to closing and field engineering.

. Working in equipment / systems installation, troubleshooting,

commissioning, startup.

. Knowledgeable in electromechanical and computer base systems; expert

in the use of testing / measuring tools, electrical / electronic

schematics, and P&ID.

. Strong project control planning, analysis and risk assessment.

. Comfortable with HVAC, PLC, process equipment, electrical power,

computer/network systems; compliance with federal codes (NEC, NFPA,

FDA, OSHA).

. Maximizing staff execution performance through proper management and

team building skill.

. Meeting deadlines with quality results through time management and

attention to detail.

. Continually achieving high levels of productivity and efficiency

through planning, prioritizing and multi-tasking.

. Providing total commitment to colleagues, clients and the organization

as a whole.

. Superior interpersonal, communication, and negotiation talents;

proficient at initiating and growing solid relationships with vendors,

customers, organizational leadership, and staffs. Bilingual (English &

Spanish).

. Interacting well with people at all levels regardless of their

cultural, economic, or social backgrounds.

PROJECT ENGINEER

FLUOR CORPORATION, 2008 - 2009

Allocate to the energy / project management division. Assignment in

Anchorage, Alaska to evaluate the schedule and cost for an on-going $11

million construction of 150 temporary camps dormitories and fire alarm

project (8 fire panels / 2,500 field devices). Oversee and collaborate in

the detail design review, field installation / testing, quality,

authorization to proceed phases / pre-construction activities. Generated

and presented accurate bi-weekly progress reports to stakeholders and Fluor

senior management.

. Selected to lead engineering detail design, project control and

project implementation initiatives in compliance with federal codes,

policies, and guidelines.

. Improved project cost and schedule, which resulted in keeping the

project moving and generation of accurate reports.

. Enhanced engineering design by identifying safety issues, quality,

codes compliance, procedures, and guides.

. Supported field personnel at planning of conduits, wiring, fire

panels/device installation and testing.

. Identified electrical installations quality issues; recommend the

corrective action prior to mobilization of temporary camps to project

site.

. Streamlined field performance by developing WBS, engineering

assessment, review of deliverables time duration and materials

deployment plan.

. Reduced contract problems through evaluation of supplier/contractor

proposals as well as performance through KPI's. (emphasis in safety

policies compliance)

. Boosted employee morale though leadership by example (not being afraid

to roll the sleeves up, get dirty, and do what it takes to get the job

done).

PROJECT MANAGER

FLUOR CORPORATION, 2006 - 2008

Assign to Commissioning and Qualifications division. Responsible for

installation, commissioning and startup effort of automated (PLC)

manufacturing process equipment, and respective ancillary systems (4 HVAC,

inside electrical systems, alarms, network communications, nitrogen

distribution, dust collector, and 6 clean rooms). Project scope includes

new systems and upgrades.

. Directed a team of multi-disciplinary resources, including hiring,

supervision, mentoring, and training.

. Provided field technical support at loop check/continuity test, walk

downs, drawing redlines and punch list.

. Collaborated with teams on maintenance and calibration plans for

devices and instrumentation.

. Collaborated in the identification of electro-mechanical problems;

support the installation of a re-designed assembly.

. Accountable for the generation of over 100+ commissioning documents,

turnover packages and operating procedures.

. Prevented a major project delay due to design issue by implementing

plan based on resources execution performance.

. Selected execution strategies and field initiatives documented as

lesson learn.

. Effectively closed the project with Zero incident reported.

. Avoided major project delay by generating an exceptional execution

plan/schedule due to assembly re-design, and automation software data

corruption. In addition, define project boundaries to adapt

engineering / commissioning activities to construction progress.

PROJECT MANAGEMENT / SALES

INDEPENDENT CONSULTANT FOR RR & ASSOCIATES, 2005 - 2006

Accountable for the infrastructure hardware implementation of a $10M SAP/R3

project.

. Assigned to close the sales cycle and coordinate

configuration/installation of computer and networks infrastructure.

(Completed milestones on time and within budget).

TERRITORY MANAGER / MANAGER

STORAGE TECHNOLOGY, 2003 - 2005

Organization manufacturing state of the art robotic system and software

solutions for data storage applications.

Accountable for sale and service of company product. Coordinate technical

support with local and virtual teams; (Ensure Service Level Agreements

attainment (SLA). Support OEM's at customer presentations and generation /

review of business / technical service proposals.

. Led initiatives for software and hardware technical studies for

compatibility with existing infrastructure, functional and operational

specifications.

. Enhanced aftermarket products sales by effective product positioning

with OEMS, installed base and ROI analysis.

. Generated accurate sales reports for pipeline, forecast, progress

status and services metrics.

FIELD ENGINEER / SERVICE ENGINEER

DIGITAL EQUIPMENT CORPORATION

Information Technology consulting and manufacturing facilities company.

Provide engineering support to manufacturing operations and field

engineering division.

. Assigned as lead during project definition to closing phases for

technology infrastructure capital projects.

. Configured / design computer hardware systems for automated / control

applications.

. Analyzed field test data to troubleshoot and solve electrical /

grounding problems affecting computer systems.

. Provided engineering support during manufactuirng shutdowns / startup

process.

EDUCATION

Polytechnic University of Puerto Rico

Bachelor of Science in Electrical Engineering

University of Puerto Rico

Bachelor in Electronic Technology

Penn Foster, HVAC Certification (May 2010)

CERTIFICATIONS

OSHA: Construction Safety & Health; EIT: Texas / Puerto Rico; Regulatory,

Compliance, Commissioning & Validation Practices

SKILLS

Customer Services, KPI, ROI, Microsoft Office Suite, Project, Outlook,

SharePoint, Technical / Proposal Writing

Lotus Notes, Primavera, Visio, Risk Analysis, LEED, P&ID / Electrical /

Electronic Schematics, PLC, HVAC, IT



Contact this candidate