Dhruti Rampelli
** ******** ****** 607-***-****
Johnson City, NY 13790 ******.********@*****.***
Quality Engineer
Lean Six Sigma . Scheduling. Continuous Improvement . Project Management.
ISO 9001. FMEA. Supervisor. Design of Experiments. Quality Control &
Assurance. SPC. Kaizen
Summary
. Project Leader for hands-on and team based Projects related to
Continuous Process Improvement
. Proposed models to reduce the waiting time of the jobs at the Stencil
Manufacturing Unit
. Enhanced the Retention Rate (by 50%) of the freshmen students with the
help of Six Sigma
. Improved the Freshman Education system by eliminating non value added
activities
. Conducted workshops to increase student engagement and interaction for
the faculty
. Certified as Electronic Packaging Engineer by IEEC at Binghamton
University
. Maintained PERT and Gantt Charts for multi-tasking and monitoring of
the projects
. Excellent interpersonal, research and analytical skills; Strong
written and presentation skills
. Certified Green Belt Lean Six Sigma by Thayer School of Engineering at
Dartmouth
Education
Binghamton University, State University of New York Aug 08-Present
. Masters of Science, Systems Science and Industrial Engineering,
Overall GPA:3.52/4.0
. Thesis on Continuous Process Improvement of Freshman Engineering
Program
Mumbai University, India
Jun 04- Jul 08
. Bachelors of Science, Computer Engineering,Overall GPA 3.66/4.0
Experience
Process Improvement Engineer, SUNY Binghamton NY
Jan 09-Present
. Performed Continuous Process Improvement (DMAIC) to improve the
quality of the program which facilitated in decrease of student
retention rate
. Supervised and judged various student projects and presentations to
evaluate the student understanding capacity and enthusiasm for
engineering
. Eliminated the manual paper work of grading and assignment submissions
by deploying automated assessment system.
. Interviewed many people in and out of the department to review and
analyze old models
Academic Projects
Watson School of Engineering, Binghamton, NY
Jan 09-Dec 09
. Reliability and Quality of Production system
Improved Reliability of the Production system by identifying the root
causes with the help of FMEA and FTA. Suggested inspection plans to
minimize the shipping of non conforming products and enhance the
Quality Management System.
. Simulation for Scheduling Jobs at Stencil Manufacturing Facility
A base line and alternative models were simulated using Arena for
scheduling and dispatching the jobs efficiently such that the waiting
time was minimized (by 65%) and tardy deliveries are avoided to ensure
customer satisfaction.
Technical Skills
C, C++, SQL, Visual Basic, HTML, MS Office Applications, Minitab, Matlab,
Mathematica, LabView