Post Job Free
Sign in

Engineer Project

Location:
Johnson City, NY, 13790
Posted:
March 09, 2010

Contact this candidate

Resume:

Gothey */*

KAUSTUBH GOTHEY

**** *., ***** ***., *** # 1V, Chicago, IL 60626 Ph: 607-***-**** Email: *******@*****.***

OBJECTIVE

Full time position with an organization that provides me an opportunity to utilize my HVAC knowledge and to be a part of

team that works dynamically towards completing accomplishments of the organization

SUMMARY

MS – IE with overall 4+ years of work experience in HVAC and manufacturing firms

Deep understanding of principles of thermodynamics, psychometrics, thermal engineering, heat transfer, refrigeration

and air conditioning

Expertise in handling commercial, Green buildings and Clean Rooms

Experience of space planning, design, costing, load calculations and LEED guidelines

Adept in managing small and large projects creatively within time and allocated budget

Knowledge of various types of AHUs, ventilation and exhaust systems

Hand on experience in developing a strong Vendor Network and Supplier Pricing

EDUCATION

Dec’09

State University of New York, Binghamton

Masters of Science, System Science & Industrial Engineering,

Overall GPA 3.4/4.0

Jun’06

University of Mumbai (V.J.T.I.), India

Bachelor of Engineering, Production Engineering

Overall GPA 3.87/4.0

COMPUTER PROFICIENCY

Programming Languages: Java, C, Visual Basic Application, SAS, SQL

Carrier HAP or E 20, AutoCAD, MS Excel, Access, PowerPoint, MS Project

Software Packages:

RELEVANT EXPERIENCE

Mumbai, India

Blue Star Ltd.

HVAC Project Engineer – Design and Planning Aug’06–Jul’07

Carried out initial studies of HVAC project and conducted initial kickoff

meetings with other departments

Planned and designed HVAC for critical components of clean room application typical to class 10 to 10000

Calculated overall system Heat Load for conventional and Green buildings using Carrier software E 20/HAP

Assisted in Cost Analysis and allocation of Budgets for erection of the system

Developed Rate Analysis sheets highlighting rates of all materials and labors and their productivity

Scrutinized and negotiated techno – commercial offers form Vendors and prepared Cost Matrix

Created and processed Tenders, Design Basis reports and Space Planning reports

Prepared HVAC schematics, Bill of Materials, Technical and Commercial Reports of different equipments

Finalized relative estimates of energy savings against total power consumption using

simulation analysis

Designed customized Pharma Air Handling, Ventilation and Exhaust units of

high static pressure

Monitored overall project schedule by preparation of monthly progress

reports highlighting project achievements

and shortcomings with remedial action

Arranged Client/Vendor/ Site meetings and coordinated clients for payments

Projects handled – Commercial, Hotels, Malls and Hospitals – exceeding $ 2.5 million

Mumbai, India

Vighneshwar Air Conditioning Pvt. Ltd.

HVAC Project Engineer – Sales and Planning Jun’05 – Aug’ 06

Identified new sales areas by conducting market search and marketed design services to architects and builders

Devised an MS Excel based software to calculate Heat Load according to ISHRAE standards

Gothey 2/2

Calculated Heat Load and Air Leakages of complex systems which had high tonnage requirements

Created Tenders, assisted in bidding for projects and obtained mechanical contracts

Studied the floor drawings provided by Client and designed the ducting layout according to it

Approved GA Layouts and Piping and Instrumentation diagrams prepared by Design Department

Finalized AHU placement, VAV, duct and piping routing and calculated dampers and grilles sizes, insulation, etc

Inspected components from supplier side and conveyed suitable changes

Closed out projects by providing all documentations to Client as defined by commissioning log

Analyzed completed projects to compare estimated costs to actual costs and reduced the discrepancies in future

OTHER EXPERIENCE

Binghamton, NY

Sheltered Workshop for the Disabled, Inc

Engineer – Purchasing and Planning Aug’07 – Sept’ 09

Devised a software for automated quote selection for the Purchasing Department using MS Access and VB

Automated the issue and receipt of quotes which selected the best vendor based on quality, pricing, lead time, etc

Extracted the quote information to the assembly level and prepared Costing Sheet for the customers

Provided a cross reference between company parts and suppliers parts

Build up a strategic Vendor Network by optimizing the number of suppliers which resulted in cost savings due

to reduced administrative costs and quantity price breaks

Developed and maintained KANBAN system for Inventory Management and Control using MS Excel, Visual

Basic and MAPICS ERP system

Scheduled quantities for Just In Time implementation and enhanced Kanban System to administer smooth flow of Supply

Chain

Ensured proper component coverage in the warehouse for Just in Time shipment to the customers

Supported Quality Control team in defect reduction of wire assemblies using Kaizen approach

CERTIFICATIONS

Mar’ 07

Basics of Air Conditioning – ISHRAE, Mumbai

(Psychometrics, Cooling Load, Duct Design & Air Distribution)

Jun’ 07

Practical Air Conditioning – ISHRAE, Mumbai

(Practical Pumps & Piping, Air Handling Units, Cooling Coils, Electrical & Controls)

ACADEMIC PROJECTS

Thesis: “Formation and Design of Cells in Reconfigurable Manufacturing Systems”

Projects:

Financial Systems Program – Course design for Industrial Engineering Department

Decision Support System – Industrial Application for Inventory Management

Overview of University Academic programs using Design of Experiments

Modeling and Simulation of University food court using Arena

Housing conditions of Boston and Suburbs using Multivariate Techniques and SAS

POSITIONS OF RESPOSIBILITY

Jun’08 – May’09

Vice President Indian Graduate Student Organization, Binghamton University

Organized ‘Peace Rally’ for Mumbai terror victims and Binghamton shoot out victims

Participated in the International Film Festival at Binghamton University

Organized festivals and trips to promote cultural values and harmony

Jan’04 – Jun’04

H.R. Coordinator National Seminal Conference, Mumbai University

Conducted a conference aimed at Engineering Academic Transformation

Led team of 30 members to coordinate the event

Managed budget and sponsorship for the event

HONORS AND AWARDS

Gothey 3/2

Received full tuition scholarship for entire Bachelor’s study from University of Mumbai

Received full tuition scholarship for entire Masters study along with stipend from NY State

Meritorious performance in Maharashtra State Talent Search Examination



Contact this candidate