Juan A. Rodr guez Rivera, PE. Lic. #*****
Mansiones de los Cedros #47
Cayey PR 00736
Human Resources Manager:
I am a performance driven engineer who will get innovative and creative
solution for every single project on time and under budget, no matter how
complex it can be. However, I have never believed that meeting those
criteria alone was good enough and I have been able to demonstrate my high
potential exceeding customer's expectations in terms of quality and
service.
My forward thinking knowledge has given me dynamic results managing and
directing engineering personnel in the construction industry, and I can
assure that being part of your company would contribute to be a visionary
leader.
I have been able to read, analyze and interpret general business or
governmental regulations on a regular basis as a top performer. My critical
thinking, analysis and recommended solutions regarding technical problems
and complex situations are the best in class.
A superb talent that I will be adding to your organization includes: a
practical approach to direct, design and supervise with a constant eye for
controlling costs and finishing the project under budget, without
diminishing quality. My reputation precedes me for listening and analyzing
employee's ideas and thoughts on creating a safe and productive work
environment.
My professional license is valid in Puerto Rico, but within a small
reasonable amount of time I will get the corresponding license by
endorsement, because there is reciprocity between jurisdictions. Based on
my experience and strong commitment to my craft, I will add significant
value to your team. I look forward to discussing my capabilities in more
detail, and I'm available for a personal interview at your convenience. I
know you are busy, and have many applications to review, so please let me
know if you wish to further discuss your requirements and my ability to
meet them. Thank you for your time and consideration.
Sincerely,
[pic]
Juan A. Rodr guez Rivera, PE. Lic.
#16548
Mansiones de los Cedros #47 Cayey, Puerto Rico 00736 787-
342-9095 ***********@*****.***
SUMMARY:
Engineering manager with talented ability directing a team of professional
engineers in multiple disciplines. Construction manager of residential
projects including zoning, design, economic studies, construction code
compliance and solving construction claims. Management of construction
contracts and economic budgets.
EDUCATION:
BSCE Univ of PR Mayaguez- Aug 92- Dec-96 PE Lic #16548(Valid in most US
states by reciprocity).
ACHIEVEMENTS:
Armonia-Project of the Year 2009 Mortgage Bankers Assoc.
Brisas del Escorial-Project of the Year Runner up 2003 Mortg. Bankers
Assoc.
El Valle-Eco-friendly Project of the Year 2005 PR realtors Assoc.
Los Prados- Planned Community of the Year 2005 PR Home Builders Assoc.
CORE COMPETENCIES:
Award winning team manager, visionary leader, business management skills,
employee motivator, quality driven specialist, estimating and contract
manager, negotiation skills, detailed oriented, construction code expert,
design supervisor, schedule analysis, value engineering analysis, proposal
and business developer.
LOS PRADOS URBANOS Sep. 04- Present
Enginering Manager
Planned and managed the overall Master Plan Community (residential and
commercial) consisting of more than 300 acres. Prepared and design related
construction and infrastructure. Direct all on-site project activity,
managed field engineering and inspection office to ensure projects are
completed on schedule, within budget, and in accordance with engineering
design. Budget tracking, forecasting work loads. Compliance with federal
agencies like USCOE, US fish and wildlife, EPA and FEMA. Flood plan
revision, Hydraulic and Hydrological studies preparation, site layout,
subdivision design, zoning research and analysis, storm sewer and sanitary
sewer design, EPA SWPPP inspections. Management of all construction
contracts including change orders, application for payments, bonds and
surety requirements. Supervising project closeout towards procurement of
the building permit.
Completed $25 million dollar, 240 unit condo, seven month earlier than
scheduled.
. Built over 1,200 residential units and over 150,000 sf of commercial
spaces.
. Managed to upgrade sewer pump station without affecting the 24hr
operation.
Managed three construction projects simultaneously generating incomes
in order of $35k per unit.
Mitigation works along river bank to avoid major slide problems due to
torrential rains.
Increased construction speed by implementing review and tracking
system.
Interstate General Properties Aug 01- Sep 04
Project Manager
Managed and directed the overall construction of phases 2 and 3 at Parque
Escorial 250 acres Planned Community. Prepared and managed construction
drawings, project management and schedule management. Prepared all design
of retention ponds, water distribution systems, sanitary pump stations,
sanitary force lines, including 115KVA electrical substation and electrical
distribution lines. Provided cost evaluations, directed all contract
administration, and managed the resident engineering offices. Developed
strong contractor and Owner communication that helped the fast paced
construction. Delivered 800 residential units, 90,000 S.F. commercial
building, developed and sell six lots of 10+ acres each, averaging $6
million dollar per lot. Managed and evaluated bids, RFI, RFQ, submittal and
monthly economic payments. Construction contracts and specs preparation.
Construction claims manager and dispute solver. Proposal preparation,
budget tracking, forecasting work loads and staff development.
. Saving more than $300k in loans interest by completing the project 9
months earlier.
. Slashed material expenses 10%, establishing specific contract clauses
avoiding escalation clauses.
Directed 3 large-scale condo construction projects each $30 million
plus, including mechanicals rooms, electrical distribution and
equipments.
Major design changes on structural steel roof and precast panels
without affecting Bldg construction.
CSA Group/ CH2M HILL Feb 99- Aug 01
Project Manager
Engineering design director for The North Coast Super Aqueduct. Prepared,
reviewed and recommended contractors joint ventures for the project.
Prepared scopes of work, contracts and managed the inspection services for
the project. Bid process and RFQ supervisor. Managed the economical process
including application for payments, change order, extra works, among
others. Liaison between local govt, population, contractors and design
office. Prepared technical reports and recommendations regarding technical
issues and solved problem in a design built project. Construction
management of water reservoir tanks, water treatment plant including
mechanical and electrical equipment. Prepared and implemented Start up
process and start up manuals.
. Produce savings up to 2 million dollars in change order claims and
extra works.
. Biggest pipeline project ever made in Puerto Rico under a single
contract.
. Critical inspection of pipes produced rejection of non-acceptable
material.
. Contract negotiation reduced claim for court and communities
injunction.
Resident inspector of 30 luxury resort villas at Palmas del Mar. Supervised
the overall construction including electrical, HVAC, elevators, pile
driving, earthwork and mechanical installations. Reviewed and evaluated
submittals, change orders, schedules, construction budgets and construction
code adherence.
CIMECO CONSTRUCTION -Noel Santos Mar 98-Feb 99
Project Engineer
Construction manager of an 80 unit condo. Managed all construction
contracts, subcontractors, material purchasing, manpower requirements,
scheduling, application for payments, and coordination between trades.
Exceed quality standards required by the inspection office and completed
the project within time specified on contract. Usage of different type of
concrete helped accelerate the project.
. Punch list process was rapidly corrected and minimized.
. Culvert (critical item) installation produced savings in order of
$30k.
. Earth reinforced walls installation produced savings of $75k and cut
2 moths from schedule.
. Project management, purchasing materials and monitor costs on a
weekly basis.
ICA MIRAMAR Jan 97-Mar98
Field Engineer
Pre cast concrete plant manager. Directed the installation of pre-cast
segments between piers for light rail system. 982 sections 5mts x 2mts were
casted in a 6 month span. Supervised post tensioning process. Managed the
installation of segments between piers, deep surveying analysis regarding
right of way and alignment of piers before installation of elevated
segments. Complex coordination between contractors 3 shifts per day.
. Fastest contract mounted between piers from a total of 7 competitors.
. Multiple equipment coordination avoided OSHA violations.
. Concrete formwork and rebar placement specialist using precise
surveying instruments.
. Surveying detailed precision helped the casting yard shorten this
process by 3 months.
SKILLS:
Adobe, Primavera, MS Office, Auto Cad, MS Project, Budget Analysis,
Construction Planning, ACI, UBC, IBC, ANSI, NEC, BOCA, Scheduling, Concrete
Specialist, Forensic Engineer, Bilingual, Proposal preparation, workload
analysis and mentor junior staff, ArcGis, HydroCad, Storm CAD, Hydroflow,
HEC-RAS.
ACTIVITIES:
Land Surveyors and Engineers of Puerto Rico Professional College
(CIAPR).
Civil Engineers Institute (IIC)
REFERENCES: Upon Request.