JACK CASTELLI
San Diego, CA H: 760-***-****
********@*****.*** C: 619-***-****
Results-oriented Manufacturing Manager and experienced Process Engineer
with broad-based background in new product/process development and high
volume manufacturing environments. Proficiencies include providing clear
direction with organizational goals; implementing systematic solutions that
focus on sustainable improvements with superior controls; and communicating
effectively with all levels on company strategies and direction. Team
player, change catalyst and tenacious achiever with creative problem
solving abilities, extensive experience and accomplishments in the areas of
process improvements and cost reduction utilizing Six Sigma and Lean
Manufacturing strategies.
Continuous Improvement - Six Sigma Black Belt - Manufacturing Management -
Design of Experiments
Theory of Constraints - Lean Manufacturing - Troubleshooting - Project
Management - Process Development
Data Analysis - Budget Development and Control - Cost Reduction -
Statistical Process Control
PROFESSIONAL EXPERIENCE
BOSTIK, Temecula, CA 6/2009
- Present
Global leader in the adhesive and sealants marketplace with solutions for a
variety of markets including residential construction, personal care and
hygiene, packaging and many others.
Sr. Process Engineer
Continuous improvement leader for manufacturing processes including
urethanes, grouts, thinset mortars and mastics for energy and waste
reduction; eliminating nonconforming material by root cause analysis and
corrective action identification and implementation; and safety
improvements through incident investigation facilitation and conducting job
and material hazard analyses. Contributing member of the Plant Leadership
Team and Safety Team.
. Led a project team to increase urethane production throughput by 41%
utilizing Theory of Constraints principles.
. Coordinated, planned and conducted plant trials with R&D to reduce
shipping costs by >$400k per year for powders products, to break into
new markets for urethane products, and for alternative raw material
suppliers for cost reduction.
. Developed, trained coworkers on, and implemented an improved
Management of Change system resulting in a compliance increase of
700%.
CP KELCO, San Diego, CA
1993 - 2009
Leading producer of specialty chemicals with facilities in North America,
Europe, Asia and Latin America.
Operations Manager (Manufacturing/Production: 1/2007 - 3/2009)
Managed and provided technical leadership for an ISO 9001- compliant
manufacturing plant operating within an $80M budget producing innovative
biopolymers used as suspension, viscosifying or gelling agents for food,
industrial, oilfield, personal care and pharmaceutical applications.
Direct reports included 5 Area Leads and >120 indirect reports consisting
of Process Engineers; Supervisors; Lab Technicians; clerical staff; and
union personnel including Mechanics, Material Handlers and Operators
. Lean Manufacturing: Conducted 5S/Kaizen events; designed and implemented
a Pull system for finished goods replenishment in support of an inventory
reduction initiative of 57%.
. Recognized by leadership as the International Safety Rating System -
Subject Matter Expert for Critical Task Analysis, Plant Safety Committee
Member and recertified site to CalOSHA VPP Star status.
. Championed Six Sigma Projects for a fermentor asset utilization
improvement of 8% by reducing turn-around-time between batches by 8 hours;
increasing distillation efficiency by 13%; improving inventory accuracy
from 86% to greater than 98%; multiple product quality / FPSR
improvements; a 43% reduction in fermentor contamination; and an increase
in recovery efficiency by reducing losses by over 1/3 at one stage of the
process.
Recovery Process Area Lead (Manufacturing/Production: 9/2005 - 12/2006)
Process optimization leadership and production scheduling for recovery of
fermented biopolymers with focus on yield, throughput rate, on-stream time,
cost reduction and product quality on 3 lines. Enforced cGMP and Safety
Policies. Managed 4 Production Supervisors, 2 Process Engineers, 1 Process
Specialist and 16 Operators.
. Six Sigma Champion and team member for project resulting in an 11%
reduction in solvent usage worth $2.4M annually in energy savings.
. Supported PR&D technology transfer of new products and processes to
Production through composing detailed processing instructions, providing
field coverage and data analysis for system optimization.
. Led work group to simultaneously achieve the highest first pass success
rate and throughput in history of the site.
Sr. Process Engineer (Manufacturing/Production: 5/2004 - 8/2005)
Optimization for quality and throughput of filtration, precipitation,
pressing, extrusion, drying and milling systems. Troubleshooting, new
equipment start-up and operator training. Coordination of Maintenance and
Project activities with Production schedule. Direct reports included 4
Lead Operators.
. Created Preventative Maintenance procedures for pressure leaf filtration
and dilute phase transfer systems leading to a 7% increase in on-stream
time.
. Re-engineered a pressure leaf filtration system to reduce time to achieve
clarity from typically greater than 10 minutes during each transition to
less than 2 minutes, lengthen typical filter cycles by 30 minutes and
reduce product losses.
. Trained as Six Sigma Black Belt for Operational Excellence and led a
yield increase project resulting in $1.3M annual savings utilizing C&E
Matrices, FMEA, SPC and DOE.
Process Engineer (Manufacturing/Production: 6/2001 - 4/2004)
Created, developed and implemented process improvements in precipitation,
drying, milling and blending processes, resulting in increased throughput
and quality with decreased cost. Troubleshooting, new equipment start-up
and operator training.
. Designed and implemented a heat transfer process for increasing product
viscosity by 45% to meet customer needs.
. Led debottlenecking projects resulting in a 33% increase in recovery
throughput on each of 2 lines.
. Developed a sterilization process allowing rework of otherwise unsellable
material generating greater than $2.8M in revenue.
Project Engineering and Design (Engineering and Maintenance Departments:
6/1993 - 5/2001)
Engineered, designed and drafted capital projects, from preliminary design
through construction. Hired, trained and supervised designers to perform
similar duties.
. Designed, engineered and installed a system for injecting a liquid
dialdehyde into each of 3 Ribbon Blenders facilitating a WIP reduction of
400 MT; slashing product changeover time from greater than 24 hours to
less than 8 hours; and reducing raw material consumption by 90%.
. Established and preserved compliance with OSHA Process Safety Management
requirements through field verification and development of accurate
documentation.
. Emergency Response Team member.
. Other projects include: feed train heat exchangers for a distillation
system; solvent recovery system, chlorine and isopropyl alcohol scrubbing
systems; regenerative catalytic oxidation system; and fed batch
fermentation.
BDK Engineering, San Diego, CA 1/1992 - 5/1993
Drafting
Drafted lighting and receptacle layouts; MCC elevations; and single-line,
ladder, and piping and instrumentation diagrams for architectural firms,
reclamation facilities, and hospitals. Additional responsibilities
included training new hires to use AutoCAD and coordinating small projects.
FORMAL EDUCATION
University of California, San Diego
Bachelor of Science, Chemical Engineering
. Provost's Honors each quarter, Magna Cum Laude, 3.91/4.00 GPA
. American Institute of Chemical Engineers - President of Student Chapter
. IM Softball
. Tau Beta Pi Engineering Honor Society
ITT Technical Institute, San Diego, CA
Associate of Applied Science, Computer Aided Drafting Technology
. Most Outstanding Student Award
TECHNICAL, LEADERSHIP AND MANAGEMENT TRAINING
. 5/2010: Leadercast Seminar
. 12/2009: Quality Management System - Expert
. 9/2009: Quality Management System - Specialist
. 11/2008: How to Deal with Unacceptable Employee Behavior
. 6/2008: Advanced Excel Training
. 5/2008: FranklinCovey - Leadership Greatness Summit I
. 11/2007: FranklinCovey - Seven Habits of Highly Effective People
. 6/2007: Kepner-Tregoe - Problem Solving and Decision Making
. 1/2006: Six Sigma Black Belt for Operational Excellence
. 9/2005: Managing in the New Millennium
SOFTWARE AND CONTROL SYSTEMS
SAP ERP - Minitab - JMP - Word - Excel - PowerPoint - Visio - Access -
Movex - PI Data Historian
MachSix - AutoCAD - SPC XL - LabVIEW - MATLAB - Siemens APACS DCS -
Rosemount RS3 DCS