David Manocchio
Mendon, MA ***56
Profile
Heavy - Civil estimator / project manager with over 15 years of experience
in bridge, tunnel, marine, waste water, dam, CSO structures, deep
foundations, industrial and big box retail projects. Professional
experience includes designing and directing the installation of numerous
systems for large scale concrete formwork, support of excavation, rigging /
hoisting and hydraulic jacking systems. Team and technically oriented
construction professional with many years of practical field experience.
Proficient in the use of Heavy Bid "HCSS", Timberline, Primavera P3, Auto
Cad, Excel and most windows based systems.
Experience
Turner Brothers, LLC Raynham, MA April 2007 -
Present
Chief Estimator - Project Manager
Assigned primary responsibility for the cost development and project
management of all heavy - civil projects in the private and public
construction markets. Established and maintained HCSS databases for
estimating department. Provided managerial and mentoring support for
junior and mid-level estimators. Trained accounting personnel in the
interpretation of HCSS cost and material reports. Developed and updated P3
schedules for all major public works projects. Designed and directed
installation of concrete formwork and support of excavation systems.
Functioned as the primary contact for all technical and logistical issues.
Performed all project management functions for heavy - civil construction
projects, including resource scheduling, material and subcontractor
negotiation and buy-out and budgeting.
Manco Bridge & Structures Corp. Mendon, MA June 2004 - April
2007
Owner - Operations Manager
Performed all estimating, project management and accounting functions for
public and private heavy - civil construction projects. Established and
maintained HCSS databases for bid items, crew configurations and materials.
Performed all project management functions, including work assignments,
material purchasing and scheduling, equipment resourcing and client / owner
meeting attendance. On larger projects, functioned as a working
superintendent.
Horton Construction Co. E.Providence, RI Sept.
2001-June 2004
Chief Estimator - Project Manager
Assigned primary responsibility for the cost development and project
management of heavy - civil, industrial, commercial, and public works
projects. Performed digitized quantity take-offs and engineered
construction means and methods. Wrote detailed requests for quotations for
all subcontractors and vendors. Analyzed subcontractor and material vendor
quotations for cost benefit and associated lead times. Using HCSS
software, developed crews, bid items, activities, and final costs for all
major construction projects. Supervised, mentored and provided managerial
support to three junior to mid level estimators. Performed all project
management functions including subcontract and vendor contract
negotiations, project scheduling, labor and equipment assignments, writing
of requisitions, and attending client / owner project meetings.
M.DeMatteo Const. Co. Braintree, MA Dec. 1998-
Sept 2001
Lead Structures Engineer - Logan Airport Elevated Walkways Project
Assigned primary responsibility for the off-loading, transport, and
erection of 150 ton elevated walkway trusses. Developed ACAD truss
hoisting and erection plans that included utilizing a 600 ton DeMag crane
and super-lift counterweight. Designed and directed the installation of
shoring towers and hydraulic jacks at all truss splice locations.
Engineered and directed the installation of a traveling truss work platform
to facilitate subcontractor finish systems. Established concrete gang form
layout drawings and steel erection plans for all vertical circulation
towers. Supervised the rehabilitation of three concurrently worked airport
terminals.
Structures Engineer - Central Artery C01A6 Tunnel Project
Responsible for designing and directing the concrete formwork for all
tunnel bases, walls, and roofs. Directed the construction of 120 ton steel
roof soffit travelers and developed ACAD traveler alignment drawings.
Inspected concrete formwork, reinforcement, embeds, and sleeves prior to
all concrete placements. Worked directly with project superintendent and
trade foremen in designing and implementing means and methods. Developed
and maintained a cost tracking and progress program for all major
construction activities.
The Middlesex Corp. Littleton,MA June 1997-Dec
1998
Estimator
Quantified and priced heavy / highway projects in excess of $ 250 million.
Performed detailed site and utility take-offs utilizing Agtek systems.
Attended pre-bid construction meetings and site visits to determine project
scope and potential risks. Developed detailed material vendor and
subcontractor requests for quotations.
Shire Corporation Providence, RI June 1994-
June 1997
Began as a construction laborer with RI Local 271 and progressed to
superintendent and project manager. Assumed superintendent and project
management functions for all major bridge, building, and marine
construction projects. Promoted to chief estimator in 1996 and assumed
primary estimating responsibility for all public and private construction
projects.
Education
Roger Williams School of Architecture
Bachelor of Architecture Degree (5 Year Program) 1995
Minor in Civil Engineering
Currently pursuing BSCE
University of Maine at Orono
Bachelor of Science Degree in Psychology 1989
References & Design Manuals: Available upon Request
Project List
Bridge Over the Barrington & Warren Rivers
Barrington, RI
Owner: RIDOT
Position: Project Manager
Value: $ 12 Million
Fairfield at Dedham - Parking Garage
Dedham, MA
Owner: Fairfield Development
Position: Project Manager
Value: $ 15 Million
Jefferson at Admirals Hill - Parking Garage
Chelsea, MA
Owner: JPI, Incorporated
Position: Estimator / Project Manager
Value: $ 18 Million
Lexington Place - Parking Garage
Lexington, MA
Owner: Oak Tree Development
Position: Estimator / Project Manager
Value: $ 22 Million
St. Paul Arms - Parking Garage
Brookline, MA
Owner: Oak Tree Development
Position: Project Manager
Value: $ 18 Million
Renaissance Marriot at Patriot Place
Owner: Marriott Corporation
Position: Estimator / Project Manager
Value: $ 24 Million
41 Degree North Hotel
Newport, RI
Owner: Unknown
Value: $ 9.1 Million
417 South Street - Parking Garage & Retail / Office
Marlborough, MA
Owner: Franchi Development
Position: Project Manager
Value: $ 17 million
Beverly High School
Beverly, MA
Owner: Town of Beverly
Position: Estimator - Project Manager
Value: $ 26 million
Weston DPW Vehicle Wash & Storage Facility
Weston,MA
Owner: Weston DPW
Postion: Estimator
Value: $ 16 Million
MART Vehicle Storage Facility
Leominster, MA
Owner: MART
Position: Estimator
Value: $ 12.3 Million
Rt. 107 Groundwater Treatment Facility
Seabrook, NH
Owner: Town of Seabrook
Position: Estimator / Project Manager
Value: $ 11.7 Million
UMASS Amherst Southwest Concourse Improvements
Amherst, MA
Owner: UMASS
Position: Estimator / Project Manager
Value: $ 14 Million
Sturbridge Waste Water Treatment Facility
Sturbridge, MA
Owner: Town of Sturbridge
Position: Estimator / Project Manager
Value: $ 14.8 Million
Reconstruction of the Indian Run Reservoir Dam
South Kingstown, RI
Owner: Town of South Kingstown
Position: Estimator / Project Manager
Valuation: $ 3.25 Million
CCL Custom Manufacturing - OTC III Reconstruction Project
Cumberland, RI
Owner: CCL Custom Manufacturing
Position: Project Manager
Valuation: $ 3.15 Million
CCL Custom Manufacturing- CO9 Mezzanine Construction Project
Cumberland, RI
Owner: CCL Custom Manufacturing
Position: Project Manager
Valuation: $ 4.12 Million
Purdue Pharmaceutical Plant
Warwick, RI
Owner: Purdue Pharmaceutical
Position: Project Manager
Value: $ 32 Million
Allendale Dam Reconstruction Project
North Providence, RI
Owner: Town of North Providence
Position: Project Manager
Value: $ 3.2 Million
CCL Custom Manufacturing - Overhead Crane Installation
Cumberland, RI
Owner: CCL Custom Manufacturing
Position: Project Manager
Valuation: $ 450,000.00
Newport Marine Facilities & Harbor Master's Building
Newport, RI
Owner: RIDOT & Town of Newport
Position: Project Manager
Valuation: $ 5.8 Million
Greenwood Ave. Railroad Bridge Reconstruction Project
Warwick, RI
Owner: RIDOT
Position: Project Manager
Valuation: $ 4.5 Million
Rt. 403 Temporary Railroad Bridge Over Amtrak
Davisville, RI
Owner: RIDOT
Position: Superintendent
Valuation: $ 1.5 Million
Logan Airport Elevated Walkways Project
Boston, MA
Owner: Massport
Position: Lead Structures Engineer
Valuation: $ 85 Million
C01A6 Central Artery Cut and Cover Tunnel Project
Boston, MA
Owner: The Central Artery Authority
Position: Structures Engineer
Valuation: $ 185 Million
New London Turnpike Bridge Over Route 95
Coventry, RI
Owner: RIDOT
Position: Estimator / Project Manager
Valuation: $ 3.8 Million
Mineral Spring Ave Railroad Bridge
Pawtucket, RI
Owner: RIDOT
Position: Estimator / Superintendent
Valuation: $ 1.2 Million
Meshanticut Interchange Advanced Bridge Project
Cranston, RI
Owner: RIDOT
Position: Estimator / Superintendent
Valuation: $ 5.5 Million
Amtrak North-End Electrification Project
Eleven (11) project sites throughout Connecticut
Owner: AMTRAK Corporation
Position: Estimator / Superintendent
Valuation: $ 18 Million
Temporary Bridges Over the Barrington and Palmer Rivers
Barrington, RI
Owner: RIDOT
Position: Estimator / Project Manager
Valuation: $ 8 Million
Roger Williams Housing Rehabilitation Project
Providence, RI
Owner: RI Housing Authority
Position: Superintendent
Valuation: $ 650,000.00
Chad Brown Housing Revitalization Project
Providence, RI
Owner: RI Housing Authority
Position: Superintendent
Valuation: $ 875,000.00