Post Job Free
Sign in

Manager Management

Location:
Stockbridge, GA, 30281
Posted:
May 17, 2010

Contact this candidate

Resume:

David J. Knotts

*** ******** *****

Stockbridge, GA 30281

Phone : 727-***-**** Email: ************@*****.***

SUMMARY

Manager/Supervisor with experience in Medical Device manufacturing and

distribution with a proven ability to develop, supervise, and motivate work

teams, effectively manage change, and execute business strategies and cost

improvement projects. Experienced working with senior management and cross-

functional teams. High-energy individual with the ability to provide

strong leadership and produce effective results in:

. Problem Identification and Resolution

. Lean Manufacturing Implementations

. Project Management

. Internal / External Audit Compliance (cGMP, ISO)

Warehousing / Shipping, Receiving, Inv. Control

. Proficient in Microsoft Office Applications

. Product / Equipment Validations

. Information Management and Reporting

. Team Building

PROFESSIONAL EXPERIENCE

SMITH & NEPHEW, INC., Largo, FL 2003 to 2009

$3.4 billion worldwide manufacturer of Wound Management, Orthopedic,&

Endoscopy Products

Production Manager - Largo Wound Management

Managed approximately 200 full time and contract manufacturing technicians,

Supervisors, and Team Leads over a three shift operation of six production

areas of wound management products (Allevyn, Skin Care, Acticoat, NPWT,

Exudry, and Films). Front-line managed two new product areas as they were

brought into facility (Allevyn and NPWT).

. Monitored, maintained, and set up projects for all product areas for

yield, cycle time, on-time delivery, and throughput volume

requirements.

. Initiated and managed various lean projects; utilization of KanBans,

5S, quick changeover methods, and linear manufacturing.

. With plant closure set for end of 2009, currently part of senior

management team working on third party production transfers and

preparations for facility closure.

. Worked closely with Quality management on plan to reduce employee-based

CAPA issues; resulting in a year-on-year improvement since 2005.

. Designed and developed integrated capacity models for production lines.

. In the absence of an automated platform, developed manual (Excel) OEE

data collection and reporting system.

. Implemented quick changeover process for reel-fed machines, thereby

reducing setup times from an average of 68 to 36 minutes and recovering

approximately $110k annually in costs.

. Saved approximately $11k annually by developing and implementing

planning changes that reduced overall number of setups.

. Improved OEE in 2008 by over 28% through quicker machine setups, shift

to shift "hot changeovers", and development of floater role in

assisting all workcenters.

. Established "3 deep" cross-training for all production equipment and

processes in plant.

. Reduced burn dressing operation (Exudry) from 3 shifts to 2 within 60

days of taking over area; mostly through efficiency improvements,

KanBans, and lean flow techniques. Reduced contract labor by over 50%.

. Met or exceeded profitability targets every year with company by

controlling expenses and meeting or exceeding production goals.

David J. Knotts Page 2

BAUSCH & LOMB, INC., Clearwater, FL 2000 to 2003

$2 billion worldwide manufacturer of Eye Care Products

Department Supervisor - Ocucoat, Inserter, and IOL Final Packaging (2002 -

2003)

Managed 40 technicians in three areas of assembly production and packaging.

Maintained on-time delivery schedule for all products to Distribution

Center. Maintained product yield and efficiency for assembly areas.

. Supervised 50-70 manufacturing technicians and leads of Class III,

implantable lens for use in the correction of ocular cataracts.

. End-to-end product line supervision of all manufacturing and interim

packaging processes.

. Scheduled requirements and personnel management for 1st and 2nd shift

employees.

. Monitored and maintained all product yield, cycle time, on-time

delivery, and throughput requirements.

. Implemented process improvements or new product additions.

. Provided vital information for budget planning purposes.

. Maintained flexible workforce through continuous cross-training.

. Improved silicone lens yield from 54% (Jan 01) to 80% (Sep 01 - May 02)

. WIP reduction of approximately 53% (from 128,000 to 60,000 units in

under 6 mo)

. Reduced cycle time by approximately 37%

. On-time deliveries improved from 7% (Jan 01) to 90% (May 02)

. Cross-training of approximately 90% of staff (improved from 40% in Jan

01)

. Initiated and implemented Lean Manufacturing process changes to reduce

costs and minimize training requirements for multi-task process.

. Validation of new Square Edge-technology product.

INTERVASCULAR, INC., Clearwater, FL 1990 to 2000

Manufacturer of Vascular Prostheses and Patches

$21 million division of Datascope Corp.

Manufacturing Manager (1994 to 2000)

Senior Sales / Inventory Control Supervisor (1990 to 1993)

EDUCATION / CERTIFICATION / PROFESSIONAL DEVELOPMENT

Associate of Arts in Business Administration, Accounting,

Widener University, Wilmington, Delaware (1980)

SixSigma Green Belt training and certification, certified Black Belt

trainer (S&N)

Lean Manufacturing Practices, Florida MEP, Celebration, FL

Certification in GMP practices, GMP Institute, Erlanger, KY

Certification in OSHA and Florida Department of Health regulations



Contact this candidate