Synopis of resume of
Ms. Vladi Dolezal
Warwick, R.I.
JOB OJECTIVE
Obtain position of responsibility in AutoCAD or Intergraph drafting
and design.
EDUCATION
1973-1979 Diploma Of Structural Engineering (complex study of
structural, architectural, civil and mechanical engineering)
after ten semesters of study and completion of Diploma
Project on Czech Technical University of Prague, Czech
Republic.
2009 Solidworks software, CCRI
EMPLOYMENT HISTORY
2003-9/2008 Commonwealth Engineers & Consultants, Inc., Rhode
Island
AutoCAD Technician
Development of Bridge and Transportation drawings, RIDOT
Standards
1999-2003 Fuss & O'Neill Inc., Providence, Rhode Island
AutoCAD Technician III. Civil and Environmental
projects, using
Land Development Desktop and GIS software.
1996-1999 Delta Engineers PC, Binghamton, New York
AutoCAD & Intergraph Technician. Laid out Bridge drawings,
Precast drawings,
Estimates, Flight Simulator in 3D.
1996 MC Farland Johnson Inc., Binghamton, New York
Electrical department- to work on Albany Airport; Power,
Lighting and Special System Plans.
1995-1996 Keystone Engineering & Architecture, Binghamton, New
York
AutoCAD & Generic Cad Technician, Architecture and Civil
Projects.
1985-1995 Delta Engineers PC, Binghamton, New York
Drafting and Design of Structural, Civil, Architectural,
Electrical, Mechanical and Bridge Projects, AutoCAD
experience since 3/1987, NYDOT standards
1983 Complete design and supervision of 500K private residence.
1979-1980 Business Project PC, Prague, Czech Republic
Designer of distributing water and sewer systems.
PROFESSIONAL EXPERIENCE
Ms. Dolezal is a CAD Technician with over 23 years experience. She is
responsible for all aspects of drafting using a working knowledge of
bridge, structural, site development, architectural, mechanical, electrical
and environmental engineering. Responsibilities also include the
interpretation of the engineers work into final designs, and the
preparation of final construction plans. Her field experience includes
topograhical surveying, working in 3 dimensional CAD. Ms. Dolezal
experience includes numerous projects in both the private and public
sectors in Rhode Island, Massachusetts, and New York.
* Flight Simulator Platform Design for U.S. Air Force, Structural
assembly plans including 3D plans.
* Bridge Street Bridge over Chemung River, City of Corning, NY -
Historical 3 span bridge rehabilitation.
* Vrooman-Howes Cave Central Bridge, Sloansville, NY - Complete bridge
replacement.
* Production drawings (Box beams, Box Culverts) for Precast Company
* New Hope Christian Church, Providence, RI - site development
* Ranger Road Subdivision, Newport, RI - Commercial subdivision
* Highland Corporate Park, Woonsocket, RI - Industrial Subdivision
* Coventry Bike Path, Coventry, RI - Design of new bike path
* Lyman Street Bridge No. H-21-016, Holyoke, MA - Bridge replacement
project.
* Nooseneck Hill Bridge No. 52, West Greenwich, RI - Complete bridge
replacement new vertical alignment.
* Union Avenue Bridge No. 452, Providence, RI - Complete bridge
replacement, phase construction .
* Natick Bridge No. 383, Warwick, RI - Complete bridge replacement and
realignment.
* Perryvill Road Bridge, Dudley/Webster, MA- Bridge replacement.
* Main Road Bridge No. 648, Tiverton, RI - Complete bridge replacement,
phase construction.
* Sakonnet River Bridge No. 250, Porthmoth & Tiverton, RI 1.275
miles long complete replacement project on vertical and horizontal
curve in two alternatives (steel box girders and concrete NEBT's).
* Morton Street Bridge, Lowel, MA - Complete bridge replacement
* Peacedale, Washington County, RI - Interim repair: stone arch bridge
* Roosevelt Ave. Bridge S-24-090 &091, Boston, MA - Total bridge
replacement phase construction
* I-95 Bridges, Providence/Pawtucket, RI - Emergency Repairs and
Rehabilitation design for the bridge No. 550