Robert Flavin
***.******@*****.*** **** Boardwalk Dr. Apt D202 Fort
Collins, CO 80525 636-***-****
EXPERIENCE
Anheuser-Busch, Inc.
Brewing Process Engineer October 2009
to May 2010
. Managed maintenance technician process improvement work resulting in
annual savings over $250,000
. Reduced load on Siemens Batch servers increasing uptime by 20%
Brewing Group Manager November 2007 to
October 2009
. Led project to reduce supervisor coverage by 50% for 2 shifts per day
. Modified CIP routines reducing annual water usage by over 200,000
gallons and caustic usage by 5%
. Optimized line packs/presses between vessels reducing process loss by
5%
Packaging Electrical Project Engineer August 2005
to November 2007
. Assisted in construction, check out, and startup of a new bottle line
with a 12% project ROI
. Oversaw construction, check out, and startup of a rebuilt carton
conveyor system with a 17% project ROI
. Implemented automatic equipment shut down/start up routine with a 10%
annual energy saving
Briggs & Stratton
Electrical Engineering Intern October 2004
to August 2005
. Verified and modified existing equipment electrical prints reducing
maintenance time by 10%
Noranda Aluminum, Inc.
Electrical Engineering Co-op January 2003 to
August 2003
. Wrote PLC routine to monitor equipment cycle time resulting in a 15%
cycle time reduction
. Installed current monitoring on conveyors increasing conveyor uptime
by 10%
SOFTWARE EXPERIENCE
RSLogix 5, 500, & 5000
Siemens PCS7
RSView Studio SE
Wonderware
PanelBuilder 32
MS Office
EDUCATION
UNIVERSITY OF MISSOURI - ROLLA
B.S. Electrical Engineering August 2005
PROFESSIONAL ASSOCIATIONS
Toastmasters International March 2010 to
present
Institute of Electrical and Electronics Engineers May
2009 to present
Master Brewers Association of the Americas - Rocky Mountain Division
March 2009 to present