Wayne Poulter
** ******* ****, *** *******, CT **776 Phone: 860-***-**** E-
mail: ********@*******.***
__________________________________________________________________________
__________________
Always optimistic attitude along with a great overall knowledge of
manufacturing procedures from initial start up to the important on time
customer shipment. Positive results happen when properly communicating with
all customers, our suppliers, and various departmental groups within a
successful company.
__________________________________________________________________________
__________________
SKILLS:
. Master Production Scheduling (MPS) and Material Resource Planning
(MRP).
. Trained ISO auditor within a World Class organization
. Past member of APICS - the Association for Operations Management.
. Excel, Microsoft Word
. Familiar with SAP
____________________________________________________________________________
_
WORK EXPERIENCE:
Product Coordinator
1989- 2009
Risdon International
Watertown, CT
. Was responsible for developing and maintaining strong relationships,
built on trust and performance, with customers. Coordinated accounts
located in the U.S., China, Belgium, Switzerland, Canada, Germany,
France and Latin America accounting for over $20,000,000 in annual
sales which represents 40% of Risdon's annual volume
. Championed the product coordinator "one stop shopping" concept which
replaced the previous multi disciplinary approach. This result is a
streamlined one person, one call communication flow with the
customer; updating new requirements, change requests, follow up
information, and production status updates
. Utilized thorough understanding of production processes, capacities,
component supply levels, to maintain continuous flow of materials and
insure proper information to production departments and outside
suppliers, insuring better, more effective decisions
. Worked closely with the Master Scheduler/Materials Manager to be sure
required components are available and necessary labor is in-house
. Based on Master Production Schedule via MRP adjust production
departments (molding, finishing, assembly) and outside purchases
accordingly to best meet plan and customer shipments
- page 1 -
Wayne Poulter
. Communicate and review customer forecasts based on system lead times
as to when new purchase orders may be placed.
. Effective utilization of Material Resource Planning (MRP) identifying
and adjusting inventory shortfalls or excesses to maintain acceptable
production costs.
. As a member of an Inventory Reduction Team, reduced inventory levels
over $250,000 annually by reducing lead times and scrap rates,
recognizing labor shortfalls, and improving inventory reporting.
Responsible for properly maintaining required monthly inventory
levels valued in the $686,000 to $780,000 range.
____________________________________________________________________________
___________
_______
Production Manager Assembly Department 1983 - 1989
Risdon Inc.
. Managed a 225 people Assembly Department in a high volume production
environment, including all aspects of supervision, equipment
maintenance and production scheduling.
. Established and developed departmental budgets to insure that
assembly department priorities were aligned with company goals and
objectives.
. Utilized daily meetings to coordinate the efforts of production,
quality, product engineering and sales personnel to reduce scrap by
8% resulting in $162,000 in annualized savings.
____________________________________________________________________________
_____________
EDUCATION:
. Western Connecticut State College Danbury, Connecticut - Liberal
Arts.
. ASK Material Resource Planning certificate
. Dunn-Bradstreet Customer Service certificate
____________________________________________________________________________
_____________
REFERENCES:
. Available on request.
- Page 2
-
RESUME ADDENDUM
Typical Daily Job items
Product Coordinator
. Assisted with Master Production Schedule (MPS) weekly to review/adjust
each production department and outside purchases accordingly to best
meet plan and timely customer shipments
. Adjusted MRP levels to reflect MPS by utilizing thorough understanding
of production processes, department capacities, recognizing component
supply levels or issues, to maintain continuous flow of materials
. Weekly or daily meetings with all production departments to discuss
and resolve any potential service issues
. Follow up as often as necessary with each supplier to best ensure
delivery date and quantities are on-time
. Per customer direction accurately maintained new requirements, change
requests or expedites, forecasts into the MPS/MRP database
. Followed up each and every customer request for production updates,
shipment details, available inventory, invoice issues, pricing, or
quality problems etc. in a timely manner
. Communicated with forwarding agents to plan international or domestic
customer shipments coordinating with company shipping department
. Reviewed and forwarded each shipping document as determined by the
customer
. Attended meetings for all new potential products or existing product
component updates to ensure BOM's/Routings are accurate
Production Planner
1986-1989
. Planned and scheduled weekly production for off site departments based
on MPS
. Met with department supervisors as often as necessary to discuss
production plan
. Coordinated any changes to plan with proper personnel such as:
purchasing group, quality assurance, sales, if need be engineering
. Reviewed available inventories for accuracy, sub-standard material
disposition status, and readiness for further processing
- Page
3 -