B lane W. F r andsen PE
Civil Engineer
**** ** ***** * * ive, south Jordan, Utah 84095
Objective: Seeking Position as -Senior Project Manager / Senior Engineer
Qua l if ications: Professional Civil Engineer / Municipal Engineer
• 5+ years as a Public Works Director / City Engineer
• 8+ years as n Assistant City Engineer
• 9+ years as a Consulting Civil Engineer
• 17 Years as a Municipal Designer / Design Supervisor
• 20+ years as a Registered Professional Engineer with L icense to Practice Land Surveying
Education & T r a in ing
• Brigham Young University- Bachelor of Science Civil Engineering 1977
• Cal state Fullerton- Post Graduate Studies in Engineering
• Training in California Map Act
• Training in California Environmental Quality Act CEQA
• Training in Arc Info-Geographical Information Systems
• Managers & Supervisors Academies@ City of Pomona
Experience
Position- Senior Project Manager & Project Manager for Norr is Repke Engineers &
L and Surveyors ( 2005-2008)
C ity of Villa Park / S upervisor War ren Repke PE City Eng.
• Villa Park Road Reconstruction Design & Construction Management
• City Trails Design & Construction Management
• Safe Route to Schools Grant Applications
• State Trails Grant Applications
C ity of H awaii an Garden / S upervisor Ludwig Smeets PE 714-***-****)
• Prepare City Wide Storm Drain Master
• Prepare City Wide Street L ight Master Plan
C ity of Lake Forest / S upervisor Ludwig Smeets PE 714-***-****)
• Traffic Control Plans for Lake Forest Blvd.
C ity of Moreno Valley / S upervisor Ludwig Smeets PE714-***-****)
• Pigeon Pass Improvements Design & construction Management
• Veterans Memorial Monument Design & Construction Management
• California Aqueduct Bike Trail Construction Management
Position- Di rector of Public Works / City Engineer
C ity of Lawndale (1999-2005) / S upervisor Evangeline Schock, City M an ager
• Technical Advisor to City Manger & City Council
• Preparing departmental staff report and presentations for City Council & Planning Commission Meeting
• Departmental direction and management for Public Works / City Engineering Staff
• Project Director for: $15 (M) Hawthorne Blvd. Revitalization; $1.2 (M)City Hall Renovation; $1.5 (M)Manhattan Beach
B lvd. Reconstruction; $1 (M) Green Park Reconstruction
• Contract Management for; Residential Waste Collection & Disposal, Street Sweeping, Tree Tr imming, Landscape
M aintenance, and Graffiti Abatement.
• Chairman Traffic Committee
Position- Assistant City Engineer
C ity of Pomona (1992-1999) / S upervisors Victor Rollinger PE DPW City
E ng. 210-***-****)
G len Lewis PE DPW City Eng. (714-692-
2351)
Robert DeLoach DPW 909-***-****)
• Senior Manager & Supervisor for City Engineering Division: Water, Sewer& Streets Capital Design & Construction; Land
Development Review & Processing ; Public works Permitting & Inspection; NPDES Program Establishment & Monitoring
• Annual Budget Preparation for Departments Capital Improvement Program
• Annual Budget Preparation for Engineering Division Operational Budget
• Project Director for $25 (M) Pomona Regional Transit Center Planning Design & Construction
• CIP Program Director for$100+ (M) in Streets, Sewers, Sewer L ift Stations, Sewer Outfall L ines, Water Treatment
Facilities, Water Reservoirs, & Water Wells, Public Park Design & Construction
• NPDES Program Development, Inspection & Annual Reporting
• Pavement Management Plan Development and Monitoring
• City Wide Geographical Information System Development & Updating
C ities of Fontana & Yucaipa (1990-1992) Consulting Assistant City Engineer with
Ber ryman & Stephenson (BSI) / S upervisors Ray Wellington PE
R ussell Maguire PE
John McCarty PE
• Land Development Coordination,Writing Conditions of Development, Map Checking, Plan Checking, Improvement Bond
Setup and Processing
• CIP Designs for City of Yucaipa with Construction Management
• Master Plan of Sewers Updating for City of Fontana
Position- Vice P resident / Branch Office M anager for Nor r is Repke &
Associates ( 1988-1990)
C ity of Rancho Cucamonga / S upervisor War ren Repke PE City Eng. (714
973-2230)
• 19th Street Improvements Project Manager for Design
C ity of Banning / S upervisor Warren Repke PE City Eng. (714 973-
2230)
• 22nd S treet Rail Road Crossing
• Safe Route to Schools Grant Applications
Position- Senior Civil Engineer (1983-1988)
C ity of Rancho Cucamonga / S upervisors Lloyd H ubbs PE City Engineer
R ussell M agui re PE City Engineer
• Supervisor of Capital Improvement Design Section for Engineering Division
• Annual Capital Improvement Plan Budgeting and Design Administration completing design s for over $200 (M) in City
S treets, Storm Drains, & Park site Improvements
Position- Project Engineer & Resident Engineer for GPS Consulting
E ngineers ( 1979-1983)
C ity of Culver City / S upervisor Warren Repke PE City Eng.
• Culver City Park Phase I Construction 2 years in Construction
• Culver City Park Phase I Design 1 year in Design
C ity of Dana Point / S upervisor War ren Repke PE City Eng. (714
973-2230)
• El EnCanto Storm Drain Phase I with Energy Dissipater
C ity of Santa Ana / S upervisor War ren Repke PE City Eng. (714 973-
2230)
• Hazard Avenue Storm Drain Design
C ity of Rancho Palos Verdes / S uper visor Warren Repke PE City Eng. (714 973-
2230)
• Palos Verdes Park 3 Elements Design
Position- Design Engineer /Jr. Civil Engineer 1977-1979)
C ity of Orange / S upervisor Ashok Basergaka r PE Assoc. Eng.
• Santiago Canyon Road Improvements Phase I Design & Construction Management
• Katella Avenue Pavement Rehabilitation & Improvements 2 Segments Design & Construction Management
• Chapman Avenue Pavement Rehabilitation & Improvements 3 Segments Design & Construction Management
• 3 CDBG Low to Moderate Income Neighborhood Street Improvements Design & Construction Management