909-***-**** ********@*****.**
m
Drago Istrate
DESIGN AND COMPUTER SKILLS
Structural beams, trusses
Shear webs, columns
GD&T analysis
Kinematics & linkage
Mechanisms
FEA analysis
Electromechanical actuation
Electrical Routing
Hydraulic actuation
Pneumatic actuation
Aircraft drilling
Ball screws, servos, and gearboxes
Transducer installations
Tooling fixtures
Assembly jigs & fixtures
Precision weldments
Precision drives
Assembly drawings
Manufacturing drawings
Automation, controls & feedback
Catia V5 - 7200hrs
Catia V5 NC
SolidWorks - 3600hrs
Cosmos Works FEA - 700hrs
PDM Works - 1200hrs
SmarTeam - 300hrs
MatrixOne - 200hrs
Leica Axyz - 500hrs
Ansys Workbench
MS Powepoint
MS Office
MS Project
RELATED EXPERIENCE
Mechanical Design Engineer
EMB550, Flap Surface Actuation
Parker Aerospace, Irvine, CA
Sep. 2008 - July 2009
Designed electro-mechanical flap actuation components, actuator, structure
and failsafe brake. Flap actuator installation, structure interface and
layout. Defined actuator location on the wing structure evaluating load
paths, clearance to structure, clearance to skin and fluid lines.
F-35 JSF, Flight Test
Northrop Grumman, El Segundo, CA
Apr. 2007 - Oct. 2007
Prepared transducer installations for JSF flight test, layout models, sheet
metal design and electrical routing. Completed installation drawings build
packages.
X-47B, Landing Gear Doors
Northrop Grumman, El Segundo, CA
Jan. 2006 - Apr. 2007
Main landing gear door mechanism design including structural fittings,
actuator specification, envelope definition, assembly layout, detail part
design, mechanism design, kinematics analysis, up-lock integration, detail
build-to packages, assembly and component level GD&T, sensor integration
and CDR slides preparation.
F-16, Bomb Rack
Sargent Fletcher Inc., El Monte, CA
Nov. 2004 - Nov. 2005
Performed F-16 pneumatic bomb rack design for production, including high-
pressure gas sealing redesign, piston & cylinder with staging, forgings,
hook and latch mechanism. Generated production level assembly prints, Bill
of Material and assembly instructions. Completed GD&T review of all
assembly components. F-35 JDAM weapons bay bomb rack conceptual design and
layout, rack detail, store layout, clearance volumes review.
F-35 JSF
Applied Int. Motion, La Verne, CA
Dec. 2002 - Oct. 2004
Lead design team through concept evaluation, design, fabrication, testing
and assembly of 6-axis CNC. Designed precision linear and rotary drives,
feedback, alignment mechanisms, fluid delivery, cable and hose routing,
clamping and lockdown mechanisms, sensor integration, manifolds, connector
bulkheads, machine structures, assembly jigs including FEA analysis.
Structures were designed to maximize machine stiffness. Performed hand
calculations and FEA to maximize structure stiffness. Evaluated
structures for thermal stability to maximize precision and repeatability.
F-22
Mar. 2001 - Nov. 2002
Lead design team through concept evaluation, design, fabrication, testing
and assembly of 6-axis CNC. Designed twin gantry automated drilling
machine. Completed structures and assembly jig design, supervised part
inspections, installation and alignment. Generated acceptance and service
documentation. Conducted machine performance testing, data analysis and
reporting.
F-18
May 1999 - Mar. 2001
Lead design team through concept evaluation, design, fabrication, testing
and assembly of 6-axis CNC. Simulated work envelopes, travels and part
access for 6-axis CNC. Designed precision drives, mechanisms, precision
weldments, hydraulic and pneumatic actuation. Developed new spindle and
drill unit design.
F-18
Jan. 1997 - May 1999
Simulated work envelopes, travels and part access for 6-axis CNC.
Conducted design review and progress report meetings.
HANDS-ON SKILLS
. Laser tracker machine calibration
Tool and jig align and set-up
Welding and fabrication
Machining
EDUCATION
BSME
California State Polytechnic University, Pomona, CA