RICARDO TORRES
Fall River, MA 02720
508-***-**** Home
508-***-**** Cell
EXPERIENCE: NATIONAL GRID (Pro-Unlimited)
Providence, RI
July 1998 to Electrical AutoCAD Draftsman
May 2010 Produced electrical distribution plans for new and existing Residential and Commercial
customers:
Completed drawings from engineering hand sketches using AutoCAD.
Developed details and incorporated current company standards into final plans.
February 1998 INTERSTATE ELECTRICAL SERVICES
Billerica,MA
July 1998 Electrical AutoCAD Draftsman
• Drafted design-build and as-built plans of commercial buildings using AutoCAD.
February 1996 METCALF & EDDY
Wakefield, MA
February 1998 Electrical Draftsman
Produced electrical plans for the Boston Harbor Wastewater Treatment Facilities:
Applied AutoCAD to draft plans for federal government buildings worldwide.
Completed electrical, mechanical and civil drawings for use in wastewater treatment
plants.
May 1994 to JOHNSON & STOVER
Stoughton, MA
February 1996 Electrical Draftsman
Drafted plans for use in malls, schools and commercial buildings.
Designed multiple tenant fit-ups for office buildings.
February 1994 KRONOS
Waltham, MA
to May 1994 Technical Support Engineer
Assisted Customers on the telephone troubleshooting defective badge reader devices
October 1989 COSENTINI ASSOCIATES
Cambridge, MA
to February 1994 Electrical Draftsman
Developed and drafted distribution diagrams for the construction of high rise office
buildings:
Assisted in the design of electrical branch wring requirements according to the NEC.
Generated detail drawings with the use of AutoCAD.
August to MASSACHUSETTS TURNPIKE AUTHORITY (Automatic Toll Systems)
Grafton, MA
October 1989 Field Service Technician
Tested and replaced defective components in Local Area Networks for use in toll
collection.
June 1984 to BULL HN WORLDWIDE INFORMATION SYSTEMS
Billerica, MA
March 1989 Associate Product Support Engineer
Evaluated and recommended disk drive vendors for new product lines:
Located defective disk drive components using oscilloscopes and lab test equipment
Updated and generated new test procedures for product certification.
Performed tests in compliance with FCC, UL, and Company Standards.
Documented field changes that affected product performance with ECO requests.
Monitored quality at the media duplication facility and generated weekly reports.
Winter 1982
Spring 1981 Engineering Aid (Co-op) Produced charts of yields at inspection, wave solder, and
final test
March to M.E.A. ENGINEERING
Newton, MA Waltham, MA
May 1989 Electrical Draftsman (Co-op)
August 1984 Drafted electrical designs of condominiums, malls, and office buildings:
Drafted electrical power diagrams from sketches and specified new lighting products.
Spring 1983
EDUCATION: NORTHEASTERN UNIVERSITY
Boston, MA
Bachelor of Science in Electrical Engineering Technology, June 1984
Building Construction Program - Electrical Systems Design, Winter 1997