M I K HAEL I. GITL I N
*** ******* ******, **********, * L 60062
Residence: 847-***-**** *************@*****.*** Cell: 224-***-****
CAREER SUMMARY
Solution oriented, efficient and organized Senior Estimator with 30 years of diverse work
experience in the public, commercial, and institutional industries; including 20 years of
construction estimating and 10 years in project management and structural design sectors.
C ritical thinker with accomplished project management and communication skills coupled
w ith sound grasp of construction procedures/requirements, current market pricing, local
subcontractors and suppliers. Proven ability to minimize the project costs while
maintaining optimum t rade quality.
• H ard Bid Estimating
• Cost Estimating
• Guaranteed Maximum Price (GMP)
• Conceptual/Pre-Design Estimating
• Preconstruction Estimating
• Value Engineering Cost Analysis
PROFESSIONAL EXPERIENCE
T urner Construction Company, General Construction, Construction Management, Chicago,
IL
Senior Cost Estimating Engineer Sept. 2006 – Dec. 2009
• Performed cost engineering, estimating, and cost control functions for all construction
activities
• Scrutinized contractors’ proposed change orders, project delay requests, and submit ted
claims of design and field condition discrepancies
• Applied commonly used best practices methods and procedures to produce independent
estimates
• E valuated all final contractors’ estimate packages to ensure cost accuracy and
completeness
• Analyzed cost of proposed value engineering issues to minimize unnecessary project
expenditures
• Prepared construction project audits detailing time and material work costs requested by
client
• Actively collaborated with project team to resolve cost management issues in required
t ime frames
• Maintained comprehensive databases summarizing historically approved project costs
• Utilized historical production data to develop precise estimates and validate vendor
material quotes
• Negotiated change orders, prepared negotiation comments for contractors’ review, and
made recommendations to project team for cost approvals
A FRAM Corp., Construction Management and Cost Estimating Services, Chicago, I L
Senior Cost Estimator
Nov. 2005 – Aug 2006
• P rovided cost estimating and cost control services for all stages of design and
construction, including pre-design, design, bid and award, construction and post
construction phases
• Generated quantity surveying services for clients by performing feasibility studies, cost
analysis, cost estimates, and quantity take-offs with schedules of materials and bills of
quantities
• Originated conceptual construction estimates and total project budget revisions
• Analyzed and reviewed change order requests, cost schedules, option studies, and cycle
costing
• Developed monthly progress/cash f low predictions, post contract measurement, sub-
contractors disbursements, mitigation of claims and claims settlements, and evaluated
quality control issues
• Coordinated and managed preconstruction phases with scope definit ion
• Reviewed fiscal impacts of various costing issues to optimize project value
• Effectively communicated with clients to ensure high level of expected performance and
estimating services were completed on a timely basis
Mota Construction Company, Inc., General Contractor, Chicago, I L Senior Estimator
M ay 2004 – Nov. 2005
• Led the estimating process by utilizing acceptable construction estimating procedures for
conceptual, pre-design, preconstruction and construction competitive bid estimates
• Researched construction markets for potential bid opportunities, bid result and new
subcontractor information in Dodge reports, construction bulletins, and websites
• Formulated estimating packages with lists of subcontractors and suppliers for t rade
p roposals
• Redesigned bid estimate spreadsheets to increase accuracy and t imeliness of the bid
p rocess
• Resolved cost discrepancies by collecting and analyzing project data
• Evaluated purchase orders by costing project changes, additions, and site requirements
• Prepared schedules of values and value engineering i tem lists as required per project
• Facilitated definition and project design phases to meet project deadlines and reduce costs
• Developed effective relationships with regional and local subcontractors
• Negotiated pricing, bid schedules, post bid revisions, purchase order terms/conditions and
p roject phase dates with subcontractors
H LF Construction Company Inc., General Contractor, Chicago, I L Senior Estimator
M ar.1995 – May 2004
• Performed cost control functions by using feasibly studies to analyze project profitability
and provided value analysis with comparison to analogous projects
• Managed bid day activities by preparing individual t rade estimates in one lump sum bid
• Built and updated database proposals with annual labor and material price increases
• Developed estimating budgets based on actual t rade unit prices
• A nalyzed bid quotations from subcontractors and vendors to prepare competitive bid
packages
• Optimized estimates and hard bid takeoffs for commercial, public, and institutional
p rojects
• Evaluated all final estimate packages to ensure accuracy and completeness
• Prepared and reviewed subcontractor agreements and price negotiations
• Reduced original project costs by more than 4% by locating most cost reasonable
subcontractors
Verde Luz Construction Company, General Contractor, Chicago, I L
P roject Estimator Jun. 1988 – March 1995
• Established initial estimates, takeoffs, and pricing for multiple construction t rades
• Conducted labor and material cost analysis to finalize total estimated project cost
• Drafted competitive bid packages for owner’s review
• Negotiated with subcontractors and formulated subcontract agreements
• Placed orders for material purchases
• Prepared and processed change orders for architect approvals
• Solicited vendors and suppliers to obtain competitive material prices
S tate Construction Company, Belarus
P roject Engineer Sept. 1986 – Dec. 1988
• Provided engineering support for construction sites to minimize delays of project
completion
• Coordinated with subcontractors and architects to resolve field problems stemming from
i ncorrect project design for large scale commercial and industrial projects
• Resolved discrepancies between field conditions and architectural drawings
• Ensured compliance with blueprints and specifications
• Issued requests for bulletins and change orders’ preparation
• Established materials substitution procedures to eliminate long materials delivery time
Byelorussian State Engineering Fi rm, Belarus
S tructural Engineer Jun. 1976 – Sept.1986
• Designed reinforced concrete and steel structures of commercial and industrial buildings
• Fashioned design criteria and specifications for engineering analysis of structural
elements
• Conducted extensive field work to verify construction progress and determine feasibility
of proposed modifications
• Developed design criteria and evaluated cost of old building reconstruction
EDUCATION
U niversity of Belarus, Belarus
Bachelor of Science in Structural Engineering
Building and Architectural Technical School, Belarus
Associate Degree in Architecture
T ECHN ICAL SKIL LS
M icrosoft Office
MC2
Timberline