Post Job Free
Sign in

Project Manager Engineer

Location:
Folsom, CA, 95630
Posted:
March 09, 2010

Contact this candidate

Resume:

HUBBERT BOOZE, CPIM

*** ********** **.

FOLSOM, CA 95630

916-***-****

******@*******.***

QUALIFICATIONS SUMMARY

Results-oriented, detailed professional experienced in the delivery of

strategic initiatives and tactical projects. Project / Operations

Management leader with a track record of enterprise performance

improvements, systems implementations and operational changes

utilizing Lean Six Sigma Black Belt techniques. Skilled in developing

and implementing strategic plans for improving operational excellence.

Former college level instructor for systems implementation / project

management, certified by APICS and UC Davis Graduate Level Project

Manager certification.

EXPERIENCE

EPC PROJECT MANAGER,

2008 - Present

. Project Manager for the engineering, procurement and construction

of projects which enabled power generation facilities to be

certified by CAISO.

. Lead team to develop and implement project management

infrastructure to improve planning and execution of work.

. Company Safety Manager for development of program to provide a safe

working environment for employees.

CONTRACT PROJECT MANAGER, PGE, contract

2006 - 2008

. Contract Manager for $500M in contracts for new construction of

CPUC peaker generation project.

. Develop and implement improvements to a Project Controls organization.

Lead efforts to reengineer related business processes & metrics in the

project management organization. Consultant for Primavera

implementation and reengineering of scheduling process.

CONSULTANT / PROJECT DIRECTOR, HANSEN TECHNOLOGIES

2004 - 2005

Professional Services Group

Project Director for Public Sector ERP implementations, business

consultant for operational improvements & project reviews for Customer

Billing, Permitting and Asset Management.

Worked with clients to develop and implement solutions to their

concerns. Developed/Managed cost, schedule and SOW to accomplish

projects. Developed contracts & managed projects through Initiating,

Planning, Executing, Monitoring and Closing phases of the project.

PM for the implementation of company wide sales force document

management system, assessment of company call center operations and

reengineering of processes related to reorganizations.

OPERATIONS MGMT CONSULTANT, HEB & ASSOCIATES

1990-1995 & 2002-2003

Client List: Hewlett Packard Packard Bell Pride

Electronic

Master Halco Intel Applied

Aerospace

Longs AmerisourceBergen Davis Wire NI Industries

Consultant/Project Manager for software implementations and

improvement of business operations utilizing Lean & Six Sigma

techniques.

Software Implementations

. Business Process Engineer for Business Area Analysis in preparation

for SAP implementation for a Sales and Marketing Operations.

. PM for operational analysis & implementation of a CRM Document

Management System for Call Center operations

. Business Process Engineer for the implementation of i2, an APS

package, and the Ask Manman MRP system

. Quality engineer for software development, lead for the development

and execution of test scripts

. Trainer for Train the Trainer classes

Business Operation / Transformation Projects

. Project Manager for the improvement/cleanup, and implementation of

Statistical Process Control, in chemical processing which lead to the

proper disposal of 15K lbs. of hazardous waste and a 50 % reduction in

chemical usage saving the company $.5M in annual operating expenses.

. Process Engineer for the improvement of a Quality Organization for

Manufacturing Operations which lead to a reduced rework rate of 25%

saving $1M annually.

. Acting Department Manger for Plant Engineering/Maintenance efforts

which implemented a Preventative Maintenance Program that increased

equipment up time by 25% which enabled a $5M increase in sales with no

capital outlay.

. Consultant for the design & relocation of Manufacturing Operations.

Project completed on schedule enabling client to meet 100% of product

shipment demands.

. Developer and Implementer of an ECO System that enabled manufacturing

operations to "gain control "of their operations which resulted in

acceptance testing going from 0% to 100%.

. Implementation of Cost/Standards System based on time and motion

studies.

MATERIAL MANAGER, Z- WORLD

2001-2002

Manager of Planning, Shipping/Receiving & Inventory/Production Control

Departments.

Brought into a new position at a privately held company to improve

operations and to be project manager for implementation of an ERP

system.

. Developed teams in effected departments to document current

processes.

. Coordinated development of metrics and the setting of goals to

improved operations.

. Coached teams to identify opportunities for improvement.

> Shipping accuracy rose to 99.5%.

> Inventory accuracy increased with a 50% reduction in cycle count time.

. Implemented a MRP system which provided labor and material

requirement visibility.

. Developed a Kanban System and reengineered the Factory Material

Flow.

PROCUREMENT SPECIALIST, HEWLETT PACKARD

1999-2001

Team Lead for Customer Support Business Process Reengineering

. Project Manager for a Project Analysis to identify and resolve

issues related to a SRM implementation

. Author of Methodology for process documentation & Team Lead for

reengineering efforts to documentation information on the WEB in

preparation for SAP implementation

. Team Lead for the development and documentation of Procurement,

Planning and Warehouse Business Processes on the WEB reducing

training time by 50% and throughput time of product to customers by

25%.

SENIOR CONSULTANT, RWD TECHNOLOGIES

1997-1998

Consultant for the improvement of business operations, supply chain

processes and system improvements.

Projects: Borden Foods Oracle Alza

. Authored Planning Module documentation for PeopleSoft.

. Developed WEB based training and classroom training for PeopleSoft

Planning.

. Conducted business development to expand Supply Chain and

Industrial Engineering customer base.

OPERATIONS MANAGER, WELLS FARGO

1995-1996

Telephone & Online Banking Call Centers

Department Manager for 1st Level Technical Support for all Call

Centers

. Developed goals and metrics with supervisors to improve operations

for Telecom, IVRU and Network systems to support Telephone Banking

Operations

. Implemented CRM issue tracking system at all Call Centers

. Telephone Banking Disaster Planning Manager, Team Lead for the

development, implementation and training of disaster plan

PROFESSIONAL AFFILIATIONS

. Member Project Management Institute

. Selected by APICS to be an instructor at Sacramento State

University for their courses in "Systems & Technologies", the

choice and implementation of systems and "Business Processes",

improvement of operations, Seminar.

. Served on the Board of Directors of the Sacramento Chapter of

Industrial Engineers

. Advisor to Sierra College's Center for Applied Competitive

Technologies.

EDUCATION and CERTIFICATIONS

. Graduate Work, MSIE/MBA - Production, Operations and System Mgmt.

San Jose State

. BS, INDUSTRIAL MANAGEMENT, San Jose State University, School of

Engineering

. UC Davis - Graduate Level Project Management Program

. Merritt Community College - Graduate Occupational Safety & Health

Program

. California Teaching CBEST Certified

. Westinghouse Black Belt Training

PRESENTATIONS

. "Optimizing Business Processes for your ERP Implementation"

o Hansen Technologies 2005 User Conference

. "Measurement for Results: Implementing Performance Measures"

o GBA 2006 User Conference



Contact this candidate