POSITION: Senior Estimator/Project Manager
**** - **** *********-******, Inc./ Riverside Construction, San Bernardino,
CA
Chief Estimator, Project Manager
Bondadiman-McCain was sold to Riverside Construction in 6/2009
2000 - 2004 Steve P. Rados, Santa Ana, CA
Senior Estimator
1996 - 2000 Brutoco Engineering Company, Fontana CA
Senior Estimator
1985 - 1996 Mc Cutcheon, Construction, Riverside, CA
Project Manager, Chief Estimator
Proficient in all aspects of estimating from take offs to bid closing.
Proficient in Microsoft Office as well as the latest estimating
software. Have used BID TECH, HCSS Express, Hard Dollar and BID 2
WIN.
I have estimated projects from as small as $10,000.00 to over
$100,000,000.00. As well as participated in design build projects of
over $200,000,000.00. I have played a roll in all phases of these
projects from a team member to the team leader, taking a project from
The Green Sheet to bid closing.
Wrote and negotiated contracts with owners as well as subcontractors.
Negotiated change orders.
Over seen projects from start to finish as well as stepped in as
project manager when needed.
EDUCATION: Civil Engineering Major
1978 William Workman High School, La Puente CA
1978-1980 Mt. San Antonio College, Walnut, CA
1980-1982 Cal Poly Pomona, Pomona, CA
PROJECT HISTORY
For
Brad Austin
Bonadiman-McCain, Inc. Chief Estimator/ Project Manager
Glen Helen Water System for County of San Bernardino - 1.4 Million Dollars.
2.0 M and 400 K gallon water tanks with feeder lines and all Site
Work.
Storm Drain for the City of Montclair - 3.4 Million Dollars.
60" Storm Drain and all Street Work.
Offsite Storm Drain for K. Hovnanian Homes - 3.2 Million Dollars
84" RCP and Cast-In-Place Box Culvert.
Colton Yard Drainage and Crash Walls- Union Pacific Railroad - 2.2 Million
Dollars
Site Drainage and Two Crash Walls for the yard and main line
expansion.
Steve P. Rados, Inc. Senior Estimator
Multipurpose Pipeline for Contra Costa Water District - 48 million dollars
Responsible for structures, and canal shut-down and reconstruction
Del Amo Ave. over crossing - 20 million dollars
1200 ft bridge over Dominquez Channel and 405 fwy
The Geyser Recharge System, Heldsberg - 30 million dollars
33 miles of pipeline
Brutoco Engineering and Construction Senior Estimator
Alameda Street widening - phase 3B - 28 million dollars
Bridge structures and retaining wall for grade separation
Universal City MTA Plaza - 28 million dollars
Steel bridge over 101 fwy and MTA Plaza
55/22 Interchange - Cal Trans - 22 million dollars
Interchange reconstruction
LA River - Levee reconstruction - 30 million dollars
Reconstruct LA river levee