Post Job Free
Sign in

Project Manager Construction

Location:
Riverside, CA, 92501
Posted:
June 22, 2010

Contact this candidate

Resume:

BRADLEY E. AUSTIN

**** ******* *** ******

Riverside, California 92501

951-***-****

E-Mail - abmki7@r.postjobfree.com

POSITION: Senior Estimator/Project Manager

**** - **** *********-******, Inc./ Riverside Construction, San Bernardino,

CA

Chief Estimator, Project Manager

Bondadiman-McCain was sold to Riverside Construction in 6/2009

2000 - 2004 Steve P. Rados, Santa Ana, CA

Senior Estimator

1996 - 2000 Brutoco Engineering Company, Fontana CA

Senior Estimator

1985 - 1996 Mc Cutcheon, Construction, Riverside, CA

Project Manager, Chief Estimator

Proficient in all aspects of estimating from take offs to bid closing.

Proficient in Microsoft Office as well as the latest estimating

software. Have used BID TECH, HCSS Express, Hard Dollar and BID 2

WIN.

I have estimated projects from as small as $10,000.00 to over

$100,000,000.00. As well as participated in design build projects of

over $200,000,000.00. I have played a roll in all phases of these

projects from a team member to the team leader, taking a project from

The Green Sheet to bid closing.

Wrote and negotiated contracts with owners as well as subcontractors.

Negotiated change orders.

Over seen projects from start to finish as well as stepped in as

project manager when needed.

EDUCATION: Civil Engineering Major

1978 William Workman High School, La Puente CA

1978-1980 Mt. San Antonio College, Walnut, CA

1980-1982 Cal Poly Pomona, Pomona, CA

PROJECT HISTORY

For

Brad Austin

Bonadiman-McCain, Inc. Chief Estimator/ Project Manager

Glen Helen Water System for County of San Bernardino - 1.4 Million Dollars.

2.0 M and 400 K gallon water tanks with feeder lines and all Site

Work.

Storm Drain for the City of Montclair - 3.4 Million Dollars.

60" Storm Drain and all Street Work.

Offsite Storm Drain for K. Hovnanian Homes - 3.2 Million Dollars

84" RCP and Cast-In-Place Box Culvert.

Colton Yard Drainage and Crash Walls- Union Pacific Railroad - 2.2 Million

Dollars

Site Drainage and Two Crash Walls for the yard and main line

expansion.

Steve P. Rados, Inc. Senior Estimator

Multipurpose Pipeline for Contra Costa Water District - 48 million dollars

Responsible for structures, and canal shut-down and reconstruction

Del Amo Ave. over crossing - 20 million dollars

1200 ft bridge over Dominquez Channel and 405 fwy

The Geyser Recharge System, Heldsberg - 30 million dollars

33 miles of pipeline

Brutoco Engineering and Construction Senior Estimator

Alameda Street widening - phase 3B - 28 million dollars

Bridge structures and retaining wall for grade separation

Universal City MTA Plaza - 28 million dollars

Steel bridge over 101 fwy and MTA Plaza

55/22 Interchange - Cal Trans - 22 million dollars

Interchange reconstruction

LA River - Levee reconstruction - 30 million dollars

Reconstruct LA river levee



Contact this candidate