Post Job Free
Sign in

Project Process

Location:
Arlington, TX, 76010
Posted:
June 22, 2010

Contact this candidate

Resume:

SOMA BALA

*** *. *** **., *** #***, Arlington, TX 76010

Email: *******@*****.***.

Mobile: 817-***-****.

Summary:

. 1 year of experience in implementing Lean tools and statistical

process control methods.

. 3 years of experience in Manufacturing & Project Management Domain.

. Proficient in working with Pro/E, Solid works, AutoCAD, MS Project &

MS Office.

. Excellent communication and interpersonal skills.

. Organized, proactive, analytical and fast learner who adapts quickly

to new challenges and enjoys working in a team.

. Willing to relocate anywhere in United States. Eligible to work for 29

months during OPT.

Education:

. Master of Science in Industrial Engineering

GPA 3.75/4.0

University of Texas, Arlington, TX

May 2010

. Bachelors in Mechanical Engineering

GPA 3.7/4.0

Anna University, Chennai, India

May 2006

Job Experience Profile:

Automation and Control Technology India Pvt. Ltd.

August 06 - April 08

. Successfully completed multiple projects installing and commissioning

automation systems including Robotics, hydraulics & Pneumatic systems

and PLC systems for clients from healthcare products, consumer

electronics, pharmaceuticals and logistics.

. Conducted feasibility studies to Automate existing systems to improve

productivity and reduce cost.

. Conceptualized and designed tooling and equipment for automated

production processes.

. Analyzed machine and process capabilities to estimate throughput and

developed continuous improvement strategies to improve it.

. Designed and implemented plant layouts for different production

operations using AutoCAD.

. Conducted periodical meetings with management and customers to discuss

on project schedule, milestone achievements, capital investment

decisions and project deadlines.

. Held human resource management responsibility for installation process

including Engineers, Draftsmen, foremen and field crew.

Durr India Pvt. Ltd., Student Internship.

May 05- June 06

. Team member in implementing kanban/pull system for auto body pre-

treatment process to reduce work in process inventory by 60% and

increase throughput by 30%.

. Developed internal training program for 5S implementation at shop

floor.

. Done process data sampling for statistical process control.

. Implemented quality improvement activities, such as using control

charts resulting in 15% reduction in rework at final system test

level.

. Prepared instruction manual on factory safety procedures for workers

at job site.

Technical Skills:

Applications: Solid works, Pro/E 2001, AutoCAD, MS Project, SAS, MS

Visio.

Operating Systems: Windows Vista/XP/2000/98/NT, Windows 2003, Mac OS.

Other Packages: Microsoft Office 2007/2003, Lotus Notes, Photoshop.

Academic Projects:

Statistical Data Analysis:

Performed multiple linear regression using SAS/ Minitab on manpower and

workload data for US Navy bachelor's quarters, to estimate manpower

requirements.

Pro/E 2001:

. Trained in sketch modeler, part modeler, surface modeler, sheet metal,

photo render and assembly modeler.

. Designed and modeled 3D clutch plate assembly and pedestal fan

assembly using sketch modeler, part modeler and assembly.

Continuous Improvement:

Developed optimal solutions based on continuous improvement using PDCA

method by understanding the customer problems, understanding the process,

and implemented best solution for top customer complaints for the

betterment of a consumer product. General Electric Bread toaster was used

for this project.

Relevant Course Work:

Planning and control of Enterprise Metrics and Measurements

systems

Production and Inventory Control Quality systems

Machine Design Production technology

Advanced Engineering Economy Automation and advanced manufacturing

Awards:

Graduate Dean Masters Fellowship at University of Texas at Arlington.



Contact this candidate