Daniel McMenamin
Westfield, IN 46074
Home Phone: 317-***-****
Cell Phone: 317-***-****
Summary
Senior Scheduler/Planner with more than fifteen years experience in Critical Path Method
(CPM) scheduling for construction, maintenance and operating power plants. Highly
skilled Planning and Scheduling Professional (PSP) with Primavera Scheduling Products
(P3 v3.1, P6). Proficient with Microsoft Office applications.
EXPERIENCE
10/2007 – Present Catalyst, Inc., Indianapolis, IN
Scheduling Engineer
Provide scheduling support to clients using appropriate scheduling tools and applications
using Primavera products. Clients have included Hunt-Smoot Midfield Terminal
Construction, Indiana Department of Transportation – Major Moves Project Management
Group, Skanska – Scott USAF Base Clinic Renovation, Nestle Purina PetCare Food
Engineering – Schedule Support and Mentoring, Burns & McDonnell – MPRP Baseline
Schedule, Cahills Construction – Urban Assault Course baseline schedule.
10/2005 – 10/2007 Smoot Construction Company, Indianapolis IN
Scheduling Manager
Develop, analyze, maintain and update Master Construction CPM schedule of the
Indianapolis Midfield Terminal Project for the Midfield Terminal, Concourses and Apron
Areas. Integrate individual subcontractor schedules into the Master schedule. Provide
schedule deliverables on a routine basis including look-ahead schedules, summary
schedules, critical path, what-if scenario analysis and detailed predecessor successor
reports. Provide technical expertise for unfamiliar with CPM scheduling and Primavera
products in particular.
6/2003 – 10/2005 Jacobs Engineering Group Indianapolis, IN
Senior Planner/ Scheduler
Develop, analyze, maintain and update CPM schedules from Interactive Planning
Meetings, client interactions and project manager input for Small Projects Engineering in
Indianapolis and Lafayette, Indiana. Develop and maintain integrated master and
subproject schedules for multiple projects in a single building.
6/2002 - 6/2003 Brookhaven National Laboratory Long Island, NY
Project Controls Scheduler
Provide technical support to clarify and improve the overall baseline schedule associated
with the Brookhaven Graphite Research Reactor Decontamination and Decommissioning
Project. Create and maintain detailed and summary Primavera resource loaded schedules.
Maintain and control baseline schedules and generate baseline change documentation.
Create and produce Primavera sub-reports for detailed reporting.
9/2000 - 2/2002 Parsons/Westaff Newport, IN/Oak Ridge, TN
Planner/Scheduler
Collect and schedule information for an Integrated Master Schedule at the Newport
Indiana Chemical Depot. Provide direct schedule interface support to the Construction,
Environmental, Laboratory and Engineering Cost Account Managers. Adjust constraints
and logic within the schedule as needed to ensure smooth interrelation with other
activities. Assign resources to activities and adjust schedules as needed to ensure even
resource loading.
10/1999 - 9/2000 Bechtel Frederick, MD
Sr Project Controls Engineer
Business Manager May 2000 to Oct 2000
Provide schedule and cost support for a single market, in Indianapolis, IN, of an
integrated multi city telecommunications project. Critical issues identification, cost
tracking and coordination of multiple interrelated detailed activities are included in
primary duties.
Planner/Scheduler Oct 1999 to May 2000
Collect and schedule information for construction craft superintendents in conjunction
with the DC Cook Nuclear Power Plant restart effort. Provide meaningful schedules for
information dissemination. Adjust constraints and logic within the schedule as needed to
ensure smooth interrelation with station activities.
10/1998 - 10/1999 Information Resources Chicago, IL
Project Analyst
Interpret data collected from various upper management sources and convert into a cross
functional schedule for Information Technology projects. Provide reports for
interdisciplinary decision making committees and turnaround the information based on
the feedback obtained through the use of Primavera Project Planner (P3).
3/1996 - 5/1998 Commonwealth Edison Zion, IL
Cycle Planner
Plan, schedule and coordinate corrective maintenance with testing and preventive
maintenance for all station departments. Provide scheduling information using PSDI
Project 2 and the Electronic Work Control System used at Commonwealth Edison.
3/1993 - 3/1996 Commonwealth Edison Zion, IL
System Engineering Scheduler/Planner
10/1988 - 3/1993 Commonwealth Edison Zion, IL
Licensed Shift Supervisor
8/1981 - 10/1988 Commonwealth Edison Zion, IL
Quality Assurance Engineer
3/1973 - 8/1981 United States Navy Washington, DC
Machinist Mate First Class (SS)
EDUCATION Bachelor's Degree from Northern Illinois University Aug 1999
Certified by AACE as Planning & Scheduling Professional (PSP) Jan 2009