Adam Marshall, P.E. **** W. Fair Oaks Ave
Tampa, FL 33611 813-***-****
***********@*******.***
Profile
. Civil Engineer who has played key parts in the design, drafting,
estimating and construction of development projects over a five year
career.
. Define myself as extremely detail-oriented, organized, and a peak
performer in both the office and the field.
. Have the knowledge and experience to fully implement the design,
permitting and/or construction of your land development, civil
rehabilitation or water resources infrastructure project.
. Place special emphasis on conserving project resources and
establishing a sustainable infrastructure.
. Prefer to work in a project structure with direct and decisive
organizational leadership and an assertive communication style.
Engineering Career
Sep 2008 - Present Project Engineer, WRS Compass, Tampa, FL
Aug 2006 - Sep 2007 Land Development Engineer, Atwell-Hicks, Tampa, FL
Sep 2003 - Jan 2006 Land Development Engineer, King Engineering, Tampa,
FL
Formal Education and Certifications
Jun 2010 Civil Professional Engineer, FL License #71533
Aug 2002 Master of Engineering Degree in Biological and Environmental
Engineering
Masters Project in Aquaculture - Indoor Shrimp Production
Cornell University, Ithaca, NY
May 2001 B.S. Degree in Biological and Environmental Engineering
Cornell University, Ithaca, NY
2003-04 Completed courses in Project Management Systems, Financial &
Managerial Accounting, Business Law, Managerial Finance,
Managerial Decision-Making, and Leadership & Organizational
Behavior
June 2006 Diploma in National Outdoor Leadership School - Himalaya
Backpacking Course
Other HAZWOPER Certified, FL Phosphate Contractor Safety Certified,
TWIC Certified
Technical Skill Sets
Software: ICPR, AutoCAD/Design Review, Microsoft Office, Adobe Acrobat,
SpecsIntact, ESRI ArcGIS, HEC-RAS, SWMM, BRN, MODRET, StormCAD
Calculations: Hydrology and Hydraulics, Floodplain Determination, Pond
Volume and Treatment, Storm Sewer Pipe Sizing, Weir Sizing, Pump
Curves, Pavement Design, Structure Buoyancy, Soil Embankment and
Backfill, Retaining Walls, Stormwater BMP Design, Erosion
Control Design
Reports: Environmental Resource Permits, Engineering Specifications,
Land Development Drafting and Design, Standard Operating
Procedures, GIS Exhibits
Interests
Sports: Running (5K and Half-Marathon), Crew (Fat Cats Rowing of
Tampa), Swimming
Hobbies: Gardening, Traveling, Investing and Real Estate, Volunteer Work
Engineering Experience
Wiregrass Ranch, King Engineering
Developed, in conjunction with a three person team, the Stormwater ICPR
model, associated calculations, pipe design, pond design, and authored and
assembled the permits required for the 5,000 acre Wiregrass development DRI
in Pasco County. The DRI required a pre-development model to be approved
through SWFWMD, and also an ERP application for each development within
Wiregrass. The design required integration of three housing communities
with a golf course, town center, high school, shopping center, hospital,
and extension of State Route 56.
Analyzed aerials, site topography, survey data, and site reconnaissance to
create a detailed existing ICPR model of the area, and then determined that
the effects of runoff, floodplain encroachment, stormwater detention and
retention, and proposed bridges and highways would not create an adverse
impact on the natural water routes in the project site. Integrated the
results from ICPR with information from GIS and AutoCAD in order to provide
quantities and exhibits for the floodplain, pervious and impervious areas,
and water inflows and outflows for inclusion in the SWFWMD ERP for this
project.
River Club, Atwell-Hicks
Generated the Stormwater ICPR model, associated calculations, pipe design,
pond design, and ERP application and report for the 200 acre three-phase
River Club development in Sarasota County, which has been successfully
permitted through SWFWMD. This development required a synthesis of single-
family homes, townhouses, commercial property, roadways, and a complex pond
drainage system. Completed a conceptual overall development ERP and then
three separate ERP's for each of three phases, all of which were approved
by SWFWMD. Succeeded in executing the ERP's for this project on an
extremely short timetable set by my company, and our team achieved project
completion within the projected schedule and budget of this project.
C-111 Spreader Canal, WRSCompass
Reviewed plans, specifications, hydrologic and hydraulic modeling in ICPR
and HEC-RAS, and earthwork quantity computations for this Everglades
restoration project. Compiled data from a 7 person team and integrated
into a project summary Excel sheet that was updated and distributed for
weekly meetings and contained all pertinent design information for the
project in an easily accessible graphical and tabular format. Project
included construction of over 20 miles of levees, two pump stations, 23
weirs, a 3 mile long water mounding channel, and three retention ponds with
areas ranging from 150-180 acres as part of an Aceler8/CERP project for
SFWMD. Authored and reviewed much of the final design report. Coordinated
extensively with estimating department for takeoffs and quantities for this
project to create an OPCC for the client and to create a separate bid
proposal from our company for construction.
Mosaic FSA Loadout, WRSCompass
Designed, drafted and supervised construction of a Fluosilicic Acid (FSA)
loading area containment system, consisting of a concrete truck pad, rail
pan, and receiving sump with industrial pump, to comply with existing and
future RCRA regulations. FSA is highly corrosive to silica and metals, and
therefore the system design had to creatively incorporate multiple material
and coating technologies in addition to the civil design challenges of
routing spillage and stormwater in a highly active industrial environment.
Researched, calculated and designed system volume requirements, concrete
depth and reinforcement, outlet pump and piping, subgrade for truck and
rail areas, sump size and material, and pipe and coating materials.
Coordinated vendor bid submittals. Estimated project construction cost and
schedule; participated in weekly client meetings. Drafted AutoCAD 16
sheets of design plans in AutoCAD, which required integration of
topographic survey, geotechnical analysis, proposed site modifications,
rail plan and profile, truck containment plan and profile, drainage piping
plan and profile, overhead pressure piping plan and profile, details for
concrete, rail pan, subgrade, pump, piping and instrumentation, and as-
built mark-ups for final plan submittal. Provided engineering consultation
during project construction.
North District Orlando Sentinel (NDOS) Site, WRSCompass
Managed construction for the demolition and relocation of a "pump and
treat" groundwater treatment system to make room for expansion of I-4 in
downtown Orlando, which required street and sidewalk demolition, well
drilling, horizontal directional drilling, installation of concrete vaults,
and connection of HDPE piping to an existing pressure system. Compiled a
schedule of required project equipment and materials from the construction
plans, and used this schedule to communicate material specifications to
vendors, collect bids, purchase required components based on a value
analysis for each bid, and coordinate equipment and materials delivery to
the project site. Supervised site work and served as primary contact for
communication with utility companies, FDOT, city employees, CSX,
neighboring businesses, and the design engineer. Implemented maintenance of
traffic protocols based on the engineering plans.
HCA Florida Fuel Storage Tanks, WRSCompass
Drafted the complete sets of plans for UST removal and AST installations at
five Florida hospitals run by the Hospital Corporation of America in
AutoCAD. Assisted in component design and configuration. Investigated
alternative tank installation technologies and obtained vendor quotes and
bids for construction.
Belle Glade/Torry Island Lock, WRSCompass
Oversaw the ERP and Dredging Permit submittal for a lock system to be
constructed in Belle Glade, FL. Authored application and report. Reviewed
and compiled drainage and treatment calculations, environmental reports,
construction plans, property deeds, specifications, topographic survey, and
GIS data for this project.
Additional Experience
. Presented a site-specific safety training course in order to provide
certification for two separate work crews to work at the Mosaic
industrial phosphate production plant.
. Simplified the computation of hydrologic information such as SCS curve
number, time of concentration and hydraulic information such as
detention pond design, weir design and pipe design by creating
interactive Excel sheets utilizing Visual Basic and embedded drop-down
menus.
. Initiated document, calculation and file standards development for
team at all places of employment. Wrote and organized ISO 9000
documents as part of a college internship.