Lee Wah Loy Jr.
** ***** *******, *********, ** *8540
Phone: 609-***-**** email: *******@*****.***
Summary: IT Professional with over 20 years of data processing
experience in a regulated/validated environment. Project
experiences encompass all phases of a project lifecycle with
appropriate use of SDLC methodology from requirements
definition/development to implementation/support and system
retirement. Proven problem solver and team player that have
delivered major projects and can effectively work with all
levels of management in a variety of different roles and
projects.
. Implemented XP desktop migration for over 10,000
workstations
. Implemented B2B communication link between internal
business partner and consulting company located in China
. Implemented major upgrades to SAS environment for drug
development group
Professional Experience:
Johnson & Johnson, Inc. Family of Companies 1981 -
2010
J&J Pharmaceutical, Research and Development, LLC, Titusville NJ
1999 - 2010
Project Leader, Global Electronic Media Group 2009 -
2010
Maintained the Pharma application inventory system (TRAIL) and its data.
Created reports to identify software usage and opportunities for cost
reduction
. Identified and documented requirements and performed unit testing to
enhance the TRAIL system so it can be used globally;
. Developed and implemented business process for maintaining the TRAIL
inventory data;
. Coordinated with teams to schedule, communicate, trouble-shoot and
follow-up approximately 10,000 desktop migrations to Windows XP;
Project Leader, Program Management Office 2008-
2009
Supported Resource Allocations Strategy (RAS) process and Corporate Project
Management application (Clarity)
. Developed and conducted Resource Allocations Strategy (RAS) training
and reporting within the Project Management application called
Clarity;
. Implemented upgrade to Clarity version 8.1 group which improved
application performance and conformed to corporate standards;
Project Leader, Bio-Clinical Informatics Support 1999-
2008
Supported the computer technology needs of Bio-Clinical Informatics (BCI)
group, Quality Management CoE and the Global Clinical Operations (GCO)
which included the SAS server environment, the Clinical Registry system and
the Clinical Document Control system (CRF WorkManager)
. Lead an international project team that implemented offshore B2B
communication link (Shanghai, China) that complied with all J&J
security processes to allow vendor access to the BCI SAS environment;
. Created a business continuity strategy and disaster preparedness plan
for the Bio-Clinical Informatics SAS environment;
. Migrated SAS server environment from a Unix OS to Windows 2000 OS and
upgraded from SAS version 8.2 to SAS version 9.1. As part of these
upgrades, I helped developed and implement test plans, reviewed
results and ensured migration and validation documentation conformed
to change control processes;
. Analyzed and documented Clinical Registry enhancement requirements and
upgraded the database and server environment;
. IT SME (subject matter expert) that reviewed vendor IT environment for
Patient Recruitment Project;
Lee Wah Loy Jr. Phone: 609-***-****; email:
*******@*****.***
. Implemented the CRF Workmanager version 4.1 system and later upgraded
to version 4.1. Initial implementation included creating an Citrix
environment for remote access, upgrading Oracle to 8i, Year 2000
testing, and migrating scanned data from an optical jukebox to a
network storage array;
Johnson & Johnson Professional, Inc., Raynham Ma
1997-1999
Project Leader, Quality & Regulatory System Support
1997-1999
Supported the Quality & Regulatory System, Supplier Management System,
Electronic Print Room Document Inquiry System (EPR) and the Lotus Notes
Customer Complaint System.
. Year 2000 testing/validation of the aforementioned systems;
. Implementing the Lotus Notes Customer Complaint System;
. Developing Impromptu/Cognos reporting templates for the Quality &
Regulatory data;
Ethicon Endo-Surgery, Inc., Cincinnati Oh
1992-1997
Project Leader, Operations Support
1992-1997
Supported various manufacturing operations applications including the
Product Inquiry Management System (PIMS), Change Authorization Form (CAF),
and Warehouse Management System (WMS).
. Implemented a Kanban based warehouse management system and its
associated technologies which included bar code equipment and radio
frequency terminals;
. Implemented a physical inventory system in both Cincinnati and
Albuquerque facility which integrated with the Material Requisition
Planning (MRP) system called Cincom;
Ethicon, Inc., Somerville NJ 1981-
1992
Lead Analyst, Senior Analyst, Programmer Analyst, Manufacturing Operations
Support
Supported and enhanced numerous manufacturing operations systems (both
batch and on-line CICS) including Wage Payroll, Shop Floor, Accounts
Payable, Accounts Receivable and other reporting systems.
. Implemented a graphics user interface based Kanban shop floor system
in an experimental manufacturing facility;
Training and Certifications:
. Project Management Professional (PMP) certification from Project
Management Institute (PMI) - Aug 2005.
J&J sponsored GMP training and CFR21 Part 11 training
Oracle PL/SQL, MS Office (Word, Excel, Powerpoint, Access), MS Project,
Impromptu/Cognos, Kepner-Tregoe Problem Solving, COBOL, CICS
Education:
MBA - General Business; Rutgers University
BS - Computer Science; Rutgers University
BA - Biology Education; Trenton State College
Military:
Served as an officer in the United States Marine Corps and honorable
discharge
References:
Provided upon request