RESUME
James R. Blount
P.O. Box ***
Blossom, TX 75416
Home: 903-***-****
Cell: 903-***-****
Personal: abmh3u@r.postjobfree.com
OBJECTIVE:
To obtain a position as, Project Management /Construction Manager / Field
Engineer
Experience Summary:
Twenty plus years in construction management in the construction of Fossil
Fuel
Power. Coal Fired Co-Generation Plants and Wind Energy.
Experience in supervisory construction, quality control, technical support,
system procedures, procurement and materials control. Meeting schedule
deadlines in critical path work is a strong part of my expertise.
Responsibilities have included invoice verification, constructability
review, field engineering, major component modifications.
Established professional skills and experience in mediation/liaison
techniques. Proven abilities in
staff hiring, training, supervision and decision authorization. Effective
in job delegation, positive worker motivation and business practices.
Dedicated to job responsibilities with respect for operational boundaries
and successful working ethics.
EDUCATION/EXPERIENCE:
. Twenty two years experience in Construction including Gas Fired, Coal
Fired,
Co-Generation Power Plants and Wind Energy
. Owner's Representative on a two hundred turbine wind farm
. Foundation Manager of a forty four turbine wind farm
. Subcontractor direction and motivation
. Bid package compilation
. Quality control and assurance development and implementation
. Schedule formation
. Contract negotiations
. East Texas State University
. Extensive training and experience in management and supervisory
positions
. Senn-Delany accelerated training in team building
. OSHA 510 Occupational Safety and Health Standards for the Construction
Industry
. CPR and First Aid Certified
Renewable Energy Systems 12/07 to 9/09
Harvest Wind Farm (forty-three Siemens turbines)
Site Supervisor
Roosevelt, Washington
Responsible for overseeing all civil actives and inspectors including, the
layout and construction of site roads and turbine foundations including
excavation, mud mats, forms, re-bar, imbeds and placement of concrete and
grouting activities for the turbine base sections. Also responsible for the
daily reporting and tracking of all civil activities, creation and
maintaining project logs and disposition of contractor's RFI's.
South Trent Mesa Wind Farm (forty-four Siemens turbines)
Foundation Manager
Abilene, Texas
Responsible for overseeing the layout and construction of site roads and
turbine foundations including excavation, mud mats, forms, re-bar, imbeds
and placement of concrete and grouting activities for the turbine base
sections. Also responsible for the daily reporting and tracking of all
civil activities, creation and maintaining project logs and disposition of
contractor's RFI's.
Pen Power 7/06 to 12/07
Horizon Wind Energy (two hundred turbines)
Lone Star Wind Farm Phase 1 & 2
(Mesquite Farm and Post Oak Farm) Owners
Civil/Structural
Abilene, Texas
Field/Engineer
Responsibilities included, construction of site roads, turbine foundations
including excavation, mud mats, forms, re-bar, imbeds and placement of
concrete, grouting activities for the turbine base sections. I also oversaw
the placement of the underground collection system including trenching,
placement of ground, fiber optic and medium voltage cables, bedding,
backfill operations and cable terminations and testing.
Black & Veatch 4/06 to 7/06
Stewart Energy Center
Civil Superintendent
Aberdeen, Ohio
Responsible for all foundations for the following equipment: Air Quality
System (AQS) consisting of the Balance Draft Conversion (BDC) and the
Flue Gas Desulfization (FGD) for Stuart Power Plant Units 1 thru 4. A
Chiyoda CT-121 wet flue gas Scrubber, limestone and gypsum handling
equipment, eight new ID fans and eight new Booster fans. A new Gypsum
Building, Ball Mills and Conveyer System. Installation of underground
process piping and underground electric duct banks.
Calpine Corporation 5/00 to 4/06
Mankato Energy Center& Water Reclamation Center Civil/Structural
Mankato, Minnesota
Field Engineer
Responsibilities included site grading, underground piping/electrical duct
bank, structural steel and concrete foundations. Review and disposition of
FCR's, DCN's, RFI's and contractor submittals.
Bethpage Energy Center 7/04 to 7/05
Bethpage, New York Owners
Civil/Structural Field Engineer
Responsibilities included site grading, underground piping/electrical
installation, structural steel and concrete foundation.
Specification/drawing constructability reviews. Review and disposition of
FCR's, DCN's, RFI's and contractor submittals
Metcalf Energy Center 7/03 to 07/04 Owners
Civil/Structural
San Jose, California
Field Engineer
Responsibilities included site grading, underground piping/electrical
installation, structural steel and concrete foundation.
Specification/drawing constructability ability reviews. Review and
disposition of FCR's, DCN's, RFI's and contractor submittals.
Riverview Energy Center - 11/02 to 7/03 Owners
Civil/Structural
Antioch. California
Field Engineer
Contract preparation, contractor review, and specification/drawing
constructability reviews. Site preparation, grading, underground piping
installation, concrete foundations, structural steel, and painting.
Directly responsible for review and disposition of FCR's, DCN's, RFI's,
contractor submittals and resolution of punch list items.
Yuba City Energy Center - 6/02 to 11/02 Owners
Civil/Structural
Yuba City, California
Field Engineer
Responsible for sound wall installation, site landscaping, painting, and
resolution of punch list open items. Disposition/approval of contractor
Extra Work Orders (EWO) and invoicing.
Ontelunee Energy Center - 5/00 to 6/02 Owners
Civil/Structural
Reading, Pennsylvania
Field Engineer
Responsible for site preparation, grading, underground piping installation,
concrete foundations, structural steel, painting, and heat recovery steam
generator (HRSG) erection lined holding pond. Installation of all building
sheeting and soundproofing and all masonry work. Directed installation of
all floor covering, plumbing and amenities for control room and others.
Negotiated the final asphalt paving contract. Installation of two 500,000
gallon bolted R.W. and Demin. Storage tanks. Review/disposition QA/QC Non
Conformance Reports (NCR's), disposition/approval of contractor (EWO's),
and directly responsible for disposition of contractor (RFI's)
Siemens-Westinghouse- 5/99 to 1/00
Swell Creek Energy Center Contractors Civil/Structural Field
Engineer
Cedartown, Georgia
Responsible for project schedule, specification and drawing
constructability review. Clearing and grading for site preparation, lined
holding pond, underground piping installation, concrete foundations,
structural steel, painting, site fencing and site roadwork.
Westinghouse - 11/98 to 4/99
Two simultaneous projects
Essex Missouri Power Plant Owners Civil/Structural Field
Engineer
Essex, Missouri
Nodaway Missouri Power Plant Owners Civil/Structural Field
Engineer
Nodaway, Missouri
Responsible for project schedule, specification and constructability
drawing review. Preparation of lined holding pond, grading, underground
piping installation, concrete foundations, structural steel, painting, site
fencing and site roadwork.
Industra Service Corporation - 9/97 to 10/98
Oremett Titanium Recycle Facility Civil
Superintendent
Richland, Washington
Given the responsibility for overseeing carpenters, ironworkers and
equipment operators. Supervised the construction of: 30,000 sq. ft. pre
cast concrete building, 56,000 sq. ft. metal building, and a 7,000sq. ft.
office building.
Florida Power and Light - 9/91 to 9/93 l
Martin Power Plant (3&4) Owners Civil /Structural Field
Engineer
Indiantown, Florida
Responsible for site preparation, dirt work, lined holding pond, grading,
underground piping installation, concrete foundations, structural steel,
painting, and (HRSG) erection. Installation of all building sheeting and
sound proofing. Review/disposition QA/QC Non Conformance Reports (NCR's),
disposition/approval of contractor (EWO's), and directly responsible for
contractor (RFI's)
ADDTIONAL COMBINE CYCLE PLANTS ASSIGNED TO:
. Panda Rosemary Power Co-Generation Facility (220 MW) - Roanoke Rapids,
North Carolina
. Tenaska Co-Generation Facility (187 MW) - Paris, Texas
OTHER POSITIONS HELD:
. Owner and General Manager - Blount and Son Construction - Paris,
Texas
. Warranty Claims Manager - Hawker Siddley Power Engineering Inc. -
Houston, Texas
. Site Manager - Panda Rosemary Power Cogeneration - Roanoke
Rapids, North Carolina
. Assistant Site Manager- Tenaska Co-Generation Facility Paris,
Texas