STEVE DURHAM
FT. WORTH, TX 76136
(817) 236- 3877
abmfx5@r.postjobfree.com
OBJECTIVE
SEEKING POSITION FOR ADVANCEMENT WITH THE INDUSTRIAL, PETRO-CHEMICAL,
POWER, AND CONCRETE PLANT CONSTRUCTION. OVER 20 YEARS EXPERIENCE AS A
CARPENTER, AND 15 YEARS EXPERIENCE IN SUPERVISION.
WORK HISTORY
TETON CONSTRUCTORS CO.
2/10 TO 4/10 – CARPENTER FOREMAN
FOREMAN AR.
SUPERVISOR – JOHN ZIEBA
JOB SCOPE ; WORKED A SHUTDOWN FOR CEMENT PLANT BUILDING RETAINING WALLS
FOR STORAGE FACILITY, ALSO BUILT COAL UNLOADING RAIL STATION AS WALL WORK
COMPLETED AHEAD OF SCHEDULE.
RESPONSIBILITIES ; SUPERVISED A 14 MAN CREW IN THE ERECTION OF FORMWORK
AND PLACEMENT OF CONCRETE.
ZACHRY CONSTRUCTION CORP.
7/08 TO 5/09 – CIVIL SUPERINTENDENT
RYTON EXPANSION PROJECT, BORGER, TX
SUPERVISOR – CHRIS MAXEY
JOB SCOPE; NEW CONSTRUCTION, ADD ON FOR THE CHEVERON/PHILLIPS REFINERY IN
BORGER, TEXAS. PROJECT WAS A COST PLUS INDEAVER WITH A BUDGET OF 50
MILLION. ERECTED NEW FOUNDATIONS, STRUCTUAL STEEL AND PIPING FOR THE
PRODUCTION OF RYTON PRODUCT (POLYPROPELENE) UNIT TO INHANCE THE
CURRENT PRODUCTION TO 100% MORE CAPACIITY.
RESPONSIBILITIES; SUPERVISE CIVIL DEPT. AND PIPE CREW TO ASSIST PROJECT TO
GET BACK ON SCHEDULE. SHEDULED ACTIVITIES FOR CIVIL DEPT, AND PIPE DEPT.
ZACHRY CONSTRUCTION CORP.
6/08 TO 7/08 – FACILITATOR TRAINER
RYTON EXPANSION PROJECT, BORGER, TX.
SUPERVISOR - CLAY JONES
JOB SCOPE; TO TEACH AND ADVISE THE CIVIL FACILITATOR HOW TO PERFORM
PROPER, AND ACCURATE TAKE-OFFS. ORDER MATERIALS IN A TIMELY FASHION, AND
TO READ THE BLUEPRINTS DETAILS TO INSURE THE ORDERING OF MATERIAL WAS
COMPLETE AND ACCURATE.
RESPONSIBILITIES; TRAIN NEW FACILITATOR TO PERFORM TAKE-OFFS FOR THE CIVIL
PROJECT. TRAINED FACILITATOR TO RESEARCH BLUEPRINTS FOR ORDERING
MATERIALS SUCH AS REBAR, ANCHOR BOLTS, AND EMBEDS, WORKED WITH CIVIL
CLERK TO ESTABLISH WORK PACKAGES FOR THE CIVIL DEPARTMENT.
ZACHRY CONSTRUCTION CORP.
5/07 TO 5/08 - CIVIL GENERAL FOREMAN
SALT RIVER MATERIAL GROUP CLARKDALE, AZ.
SUPERVISOR; JOHN ZIEBA
JOB SCOPE; ERECTED FOUNDATIONS AND SILO STORAGE BUILDINGS, AS WELL AS
CONVEYOR SYSTEMS TO INHANCE THE PRODUCTION OF CEMENT FOR THE COST OF
34 MILLION. ADDED NEW CONVEYOR FOUNDATIONS AND CONVEYOR BELTS TO INSURE
THE QUALITY OF THE PRODUCT WITH A NEW RADIOACTIVE MINERAL CONSISTENCY
MONOTERING SYSTEM.
RESPONSIBILITIES; SUPERVISE AND PLAN ALL ACTIVITIES FOR THE CIVIL DEPARTMENT,
WHILE BUILDING AN EXPANSION FOR THIS CONCRETE PLANT, MAINTAINED THE
SCHEDULE AND P-3 ACTIVITIES AS WELL AS ORDERED ALL MATERIALS, PERFORMED
ALL CIVIL TAKE-OFFS, READ AND INTURPRETED BLUE PRINTS FOR ALL CIVIL CRAFTS,
MAINTAINED COST REPORTS AND COORDINATED ALL ACTIVITIES WITH Q-TRAX.
PERFORMED ALL PROGRESS FOR THE CIVIL DEPARTMENT AND INSURED THAT ALL
SAFETY RULES AND REGULATIONS WERE COMPLIED WITH ALL CREW MEMBERS.
RESPONSIBLE FOR 50 EMPLOYEES.
BECHTEL TELECOMMUNICATIONS DIVISION
8/05 TO 3/07 - CIVIL SUPERVISOR
KNOXVILLE, TN. - TAMPA, FL. - BALTIMORE, MD.
CINGULAR WIRELESS TECHNOLOGIES
SUPERVISOR; CHAD CURRY
JOB SCOPE; EXCATATE AND POUR CONCRETE FOUNDATIONS FOR INDOOR CELLURE
EQUIPMENT ASSOCIATED WITH THE PERFORMANCE OF THE BROADCAST TOWERS.
BUILDINGS WERE PRECAST AND PLACED ON THE FOUNDATIONS FOR CELL CARRIER
TO INSTALL COMPUTER EQUIPMENT, EXECUTED CONTRACT WAS 60 MILLION.
RESPONSIBILITIES; PURCHASE MATERIALS, EXCAVATE FOR FOUNDATIONS, INSTALL
ICE BRIDGES AND GROUND RINGS FOR EXISTING CELL PHONE TOWERS. READ AND
INTURPRETED BLUE PRINTS OPERATED EXCAVATING EQUIPMENT, PERFORMED
LAYOUTS AND SHOT ELEVATIONS FOR ALL CONCRETE FOUNDATIONS INSTALLED,
ORDER CONCRETE, PLACE AND FINISH CONCRETE AS PER SPECS. 3 MAN CREWS.
ZACHRY CONSTRUCTION CORP.
12/03TO 2/04 - CARPENTER GENERAL FOREMAN
MANATEE POWER PLANT, TAMPA FL.
SUPERVISOR; MARIO MANCHA
JOB SCOPE; ERECTED AN INTAKE STRUCTURE FOR A POWER PLANT IN FLORIDA. THE
INTAKE STRUCTURE WAS BUILT WHILE IN A CAUFFER CELL IN ABOUT 37 FEET OF
WATER, NO COOLING TOWERS WERE USED DUE TO A 100 ACRE LAKE BEING PRESENT.
A DUAL CELL INTAKE STRUCTURE WAS INSTALLED AT 550,000 THOUSAND DOLLARS IN
ADDITION TO THE COST OF THE COGEN UNIT BUILT AT THE SAME TIME.
RESPONSIBILITIES; SUPERVISE A HAND PICKED CREW FOR SUB-CONTRACTOR TAKE
OVER. SUB-CONTRACTORS WERE FALLING BEHIND ON SCHEDULE, CALLED IN TO
COMPLETE THE WATER INTAKE STRUCTURE INSIDE A COFFER CELL. 8 WEEK TIME
LIMIT WAS COMPLETED ON TIME WITH NO INJURIES OR FIRST AIDES COMPILED. CREW
WORKED 7-10'S TO COMPLETE 250 CY CONCRETE POURS TO INSURE THAT FIRST FIRE
WAS MET.
ZACHRY CONSTRUCTION CORP.
3/03 TO 10/03 - CARPENTER GENERAL FOREMAN
TARMAC CEMENT PLANT, MEDELY FL.
SUPERVISOR; MARIO MANCHA
JOB SCOPE; EXCAVATE AND POUR FOUNDATIONS FOR A NEW CONCRETE PLANT WITH
A COST OF 90 MILLION. POURED FOUNDATIONS FOR ALL MAJOR COMPONENTS OF A
CONCRETE PLANT WITH A CULMITIVE CONCRETE VALUE IN EXCESS OF 9000 CUBIC
YARDS OF CONCRETE. INSTALLED FOUNDATIONS FOR CONVEYOR SYSTEMS OF 2
MILES IN LENGTH. INSTALLED STORAGE FACILITIES FOR DRY ROCK, SILOS FOR
STORAGE OF POWDER GOODS.
RESPONSIBILITIES; SUPERVISE CARPENTER CREWS IN THE CONSTRUCTION OF THE
CEMENT PLANT; AREAS OF RESONSIBILITIES WERE THE BAG HOUSE, COAL MILL, AND
THE OFF SITE CONVEYOR TOWER FOUNDATIONS. READ AND INTURPRETED DRAWINGS
FOR CREWS, EXPEDITED MATERIALS, AND CONDUCTED STA'S TO INSURE THE SAFETY
AND WELL BEING OF ALL CREW MEMBERS.
FLUOR DANIELS
9/02 TO 2/03 - ACE CARPENTER FOREMAN
EXXON/MOBIL, BAYTOWN TX.
JOB SCOPE; 38 MILLION DOLLAR REVAMP TO PRODUCE LOW SULFUR DIESEL. POURED
FOUNDATIONS FOR STORAGE AND THE PIPING TO TRANSFER THE PRODUCT
THROUGHOUT THE REFINING PROCESS.
RESPONSIBILITIES; BUILD THE LOW SULFUR MOGAS UNIT, SUPERVISED A 10 MAN
CREW, BUILT AND SET FORMS, READ AND INTURPRETED BLUE PRINTS, CONDUCTED
SAFETY MEETINGS WITHIN THE CREW AND INSURED THAT ALL CREW MEMBERS
FOLLOWED AND COMPLIED WITH ALL SAFETY RULES AND REGULATIONS.
ZACHRY CONSTRUCTION CORP.
10/01 TO 6/02 - CIVIL GENERAL FOREMAN
SEMPRA ENERGY CORP. MESQUITE POWER PLANT. TONOPAH, AZ.
SUPERVISOR - MARIO MANCHA
JOB SCOPE; EXCAVATE FOR ALL UNDERGROUND UTILITIES, POUR FOUNDATIONS FOR
4 ON 2 COGEN UNIT. UNIT WAS EQUIPED WITH 4 HEAT RECOVERY SYSTEMS, 4
COMBUSTION TURBINS, AND 2 STEAM TURBINES. INSTALL TWO 300’ COOLING TOWERS,
AND EVAPORATIONS PONDS AROUND THE FACILITY. JOB WAS PERFORMED AT A COST
OF 57 MILLION.
RESPONSIBILITIES; BUILD POWER PLANT FOR SEMPRA ENERGY IN ARIZONA.
SUPERVISE THE CIVIL CRAFTS, CARPENTERS, RODBUSTERS, DIRT EXCAVATIONS, AND
LABORERS; CEMENT FINISHERS, AS WELL AS, HEAVY EQUIPMENT, CRANES, RIGGERS
ETC. SUPERVISED APPROXIMATLY 325 EMPLOYEES IN ALL THESE VARIOUS CRAFTS.
PLANNED THE WORK SCHEDULE FOR ALL CRAFTS, TAKE-OFFS FOR ALL CRAFTS,
EXCAVATE FOR PIPE DEPT. AND ELECTRICAL DEPT. COORDINATE THE DIGGING
ACTIVITIES AND ORDER FORMS, REBAR, CONCRETE, AND ALL OTHER MATERIAL
REQUIRED TO PERFORM THIS FUNCTION AS PER SPECIFICATIONS FOR THE
CUSTOMER AS PER BLUEPRINTS. READ AND INTERPRET BLUEPRINTS TO CRAFT
FOREMEN. SETUP ACCOUNTS AS NEED FOR VENDOR SUPPORT AND INSURE ALL
SPECIFICATIONS WERE FOLLOWED.
ZACHRY CONSTRUCTION CORP.
4/00 TO 10/01 - CIVIL GENERAL FOREMAN
CALPINE ENERGY CORP. LYONDELL CITGO REFINERY. PASADENA TX. SUPERVISOR;
BOBBY KING
JOB SCOPE; INSTALL A 2 ON 1 COGEN UNIT INSIDE THE LYONDALE CITGO REFINERY.
THE UNIT CONSISTED OF 2 HEAT RECOVERY SYSTEMS, 2 COMBUSTION TURBINES, AND
1 STEAM TURBINE AT A COST OF 37 MILLION.
RESPONSIBILITIES; SUPERVISED APPROXIMATLY 300 CIVIL EMPLOYEES TO
CONSTRUCT A POWER PLANT INSIDE THE LYONDELL FACILITY FOR CALPINE.
CORDINATE EXCAVATIONS FOR OTHER CRAFTS. READ AND INTURPRETED BLUEPRINTS
FOR CIVIL FOREMAN AND SCHEDULE WORK PROGRESS, ANSWERED TO THE PROJECT
MANAGER FOR COST AND FORECAST MONIES. ORDERED MATERIALS FOR FORMS,
REBAR, AND CONCRETE, AS WELL AS, ALL OTHER MATERIALS PERTAINING TO THE JOB
AS PER SPECIFICATION ON BLUEPRINTS.
ZACHRY CONSTRUCTION CORP.
12/98 TO 4/00 - CARPENTER FOREMAN
ROHM AND HAAS CHEMICAL, DEER PARK TX.
SUPERVISOR; WALTER KING
JOB SCOPE; BUILT THE SEP 4 PROJECT TO INHANCE THE CHEMICAL PRODUCTION FOR
THE PLANTS CHEMICAL REFINERY. POUR CONCRETE TO SUPPORT STORAGE VESSELS
AND PIPING TO CONVEY CHEMICAL ADDITIVES.
RESPONSIBILITIES; SUPERVISED A 15 MAN CREW IN THE CONSTRUCTION OF THE
SEPERATOR 4 PROJECT. READ AND INTRUPRETED BLUEPRINTS AND INSURED THE
SPECIFICATIONS FOR ALL TASKS PERFORMED WERE CORRECT AND THE WORK
PERFORMED WAS A HIGH QUALITY WITH NO REWORK FROM THIS CREW. SET FORMS,
ANCHOR BOLTS, AND INSTALLED ALL OTHER MISC. HARDWARE PERTAINING TO THE
JOB.
BECON CONSTRUCTION CORP.
6/98 TO 12/98 LEAD MAN CARPENTER
CHEVERON, CEDAR BAYOU, MONT BELVIUE TX.
SUPERVISOR; JOE LAFLUER
JOB SCOPE; EXPANSION FOR CHEVERON CHEMICAL DIVISION.
RESPONSIBILITIES; DEMO OLD FOUNDATIONS AND THE ERECTION OF THE NEW
FOUNDATIONS. SET FORMS AND ANCHORBOLTS, READ AND INTURPRETED
BLUEPRINTS TO THE OTHER CRAFTSMEN, AND PERFORMED ALL LAYOUTS.
FLUOR DANIELS CONSTRUCTION
1/95 TO 6/98 JOURNYMAN CARPENTER
SOLVEY, MONTELL, AND AMMOCO PLANTS.
DEER PARK AND LA PORTE, TX.
RESPONSIBILITIES; SET FORMS AND ANCHOR BOLTS, READ BLUEPRINTS AND
INSTALLED ALL THE HARDWARE PERTAINING TO THE TASK AT HAND. TIED REBAR,
POURED CONCRETE, AND STRIPPED FORMS FOR A FINISHED PRODUCT.
EDUCATION
TEXAS CENTRAL COLLEGE CRIMINAL JUSTICE
CITY OF COLLEGE OF CHICAGO CRIMINAL JUSTICE
WEATHERFORD COLLEGE CRIMINAL JUSTICE
KILGORE COLLEGE CRIMINAL JUSTICE
TOTAL SEMESTER HOURS - 52
LICENSES
TEXAS PEACE OFFICER
TEXAS COUNTY JAILER
AWARDS/COMMUNTIY SERVICE
RECEIVED COMMENDATION 6/01 FROM CALPINE ENERGY CORP. FOR DISTINGUISHED
SERVICE AND PERFORMANCE AND AN EXTREMEMLY HIGH QUALITY OF PRODUCTION.
MILITARY
2/83 TO 2/86
UNITED STATES ARMY
MILITARY POLICE CORP. SPECIALIST 4TH CLASS (E-4)
DUTIES; PERFORMED AS A MILITARY POLICE FOR THE USA PHYSICAL SECURTIY
SYSTEMS. RESPONSIBLE FOR THE TESTING OF NUCLEAR STORAGE FACILITIES WITHIN
EUROPE. PERFORMED TESTS FOR INSPECTOR GENERAL AND GRADED SOME OF THE
OTHER FACILITIES ON THEIR RESPONSES AND PERFORMANCE OF PRACTICE
SITUATIONS. RECEIVED 2 ARMY ACHIEVMENT MEDALS, GOOD CONDUCT MEDAL, AND
WAS SELECTED AS A BODYGUARD FOR GENERAL CHILDS ON A EUROPEAN
FRIENDSHIP TOUR THROUGHOUT THE WESTERN GERMANY.
REFERENCES
JOHN ZIEBA 305-***-**** SUPERVISOR
LARRY SHOFNER 915-***-**** SUPERVISOR
MARIO MANCHA 210-***-**** SUPERVISOR
CHRIS MAXEY 318-***-**** SUPERVISOR