Post Job Free
Sign in

Project Manager

Location:
Richmond, TX, 77406
Posted:
July 06, 2010

Contact this candidate

Resume:

Gavin J Simoneaux

**** ******* ******

Rosenberg, TX 77471

832-***-****

**************@*********.***

EDUCATION

Louisiana State University, Baton Rouge, Louisiana

Degree: Bachelor of Science, Major: Construction Management, December

2001

EMPLOYMENT EXPERIENCE

Jacobs Engineering Group, Inc. (Houston, TX) EPC Contractor, January

2005 - present

Lead Planner/Scheduler, ExxonMobil Program, SABIC - Saudi Elastomers

Project, July 2009 - present

Lead Planner/Scheduler of a "schedule recovery team" for the Front End

Engineering and Design (FEED) of the Halobutlyl Unit of the Kemya Rubber

Plant located in Jubail, Saudi Arabia. Completed a full analysis of the

existing FEED Schedule to determine where improvements could be made for

utilizing the schedule to the fullest potential. Developed a new

schedule based on this analysis and implemented said schedule for the

completion of FEED. Responsible for the development and maintenance of

the FEED schedule for the MTBE Decomposition Unit, a sub project to the

Halobutyl Unit. Developed and maintained EPC schedules as FEED

deliverables for both units. Developed and managed the generation of

schedule documentation such as forecast/actual dates, baseline/target

dates, variances, milestones, float, resource curves and lookaheads.

Maintained schedules within a multi-user P6 database and managed said

database as P6 Subject Matter Expert (SME) at the overall program level.

Lead Planner/Scheduler, BP - San Juan Coalbed Methane Project, January

2009 - June 2009

Lead Planner / Scheduler on a "recovery team" which was organized to

analyze the existing EPC schedule for a multi-billion dollar upstream

project consisting of several hundred natural gas wells and pipelines

located in the San Juan Basin outside of Durango, Colorado. Developed a

new, more manageable schedule for the completion of the home office

engineering and procurement phases of the project. Transitioned onto the

existing project controls team as EPC scheduler. Responsibilities

included, working in parallel with the on-site construction team to

develop an EPC baseline schedule and manage said schedule to provide

routine and accurate client / project management reports. Provided

information such as milestone reports, variance reports, areas for

improvements, resource curves and lookahead schedules. Managed a multi-

user P6 database to meet the requirements of an integrated EPC project

schedule.

Lead Planner/Scheduler, PCOSI - Fort Hills Project, February 2008 -

December 2008

Lead Planner/Scheduler for the sulphur unit of a multi-billion dollar Oil

Sands project located in Alberta, Canada. Responsibilities included the

development and maintenance of the front end design portion of the

schedule, integration into an overall program of said schedule to meet

specific client requirements, regular interaction with project team

members to ensure project deliverables are met on time and in accordance

with the schedule, the generation of detailed schedules and reports to

provide schedule data for project team members and management on a

regular basis, and heavy involvement in the development of the EPC

portion of the schedule to effectively utilize a P6 database with

multiple users and meet the requirements of an integrated schedule.

PMT Planner/Scheduler, Bechtel /Jacobs Joint Venture, Motiva - CEP

Project, February 2007 - January 2008

Held a key position on the Project Management Team (PMT) as a

planner/scheduler for the multi-billion dollar expansion project at the

Motiva Refinery near Beaumont, Texas. Responsibilities included analysis

of system wide detailed schedule information, such as milestones,

critical paths, resource curves and mechanical completion dates, and

compiling this data into overall program level reports and schedules for

management review. Heavily involved in program wide schedule management

for procurement and subcontracts. Attended weekly and monthly meetings

to develop and implement strategies to meet project deadlines and improve

communications between all Joint Venture partners. Played an important

role in the migration of scheduling software from Primavera 3.1 to 5.0

(P5).

Planner/Scheduler, Jacobs /Lyondell Alliance, January 2005 - January 2007

Duties included, but were not limited to, providing weekly and monthly

schedule updates and packages for various heavy industrial small capital

projects at various Lyondell facilities located in the eastern United

States. Corresponded with project management, engineering disciplines,

estimating, cost engineering, procurement, and the client on a regular

basis to forecast pertinent schedule information such as milestones,

critical paths, budget curves, resource curves, and mechanical completion

dates. Facilitated regularly scheduled interactive planning sessions to

build project schedules in a "team" environment. Utilized the scheduling

software P3e/c on a daily basis.

Babcock &Wilcox Construction Company, Inc. (Barberton, Ohio) EPC Power

Contractor

Field Engineer, January 2001- December 2004

Responsibilities included, but were not limited to, corresponding with

corporate office and the customer to provide on-site project engineering

and technical support on various SCR (Selective Catalytic Reduction)

projects across the US. Actively involved in subcontractor

management/coordinating, generation of construction documents, purchasing

of construction materials, and supervision of labor. General working

knowledge of project management, estimating, scheduling, field

engineering, procurement, safety, quality assurance, quality controls,

material controls, client/contractor relations, and labor relations.

Group Contractors, Inc. (Baton Rouge, Louisiana) Commercial / Industrial

Contractor

Assistant Project Manager / Estimator, September 1999 - May 2000

Home office duties included, but are not limited to, assisting in project

management, project estimation, and contract administration of

commercial/industrial buildings. Performed quantity takeoff, schedule

preparation, solicitation of subcontractors, proposal delivery and

drawing reproduction. Took part in the creation and business development

of a Drill Shaft Division. Field duties included holding

superintendent/supervisor positions on various projects.

Turner Industries (BASF, Geismar, Louisiana) Industrial Contractor

Boilermaker, June 1998 - August 1999

Numerous projects involving the demolition and installation of piping,

structural steel, and equipment within various process units throughout

the plant. Gained experience in the crafts of boilermaking, pipe

fitting, and iron working which included reading industrial plans, taking

field measurements, and hands-on training in each trade.

COMPUTER SKILLS

PC based applications: Microsoft Office based programs, Primavera

versions 3.1, 5.0, & 6.2



Contact this candidate