Resume:

Name : Boukedjouta Chawki

Function : Instrument control engineer

Date of Birth : 28 May 1972

Nationality : Algerian

Telephone : +213-***-***-***

[pic]

EDUCATIONAL QUALIFICATION:

Instrument control engineer from university of Constantine with distinction

COURSES ATTENDED:

1. HSE Induction course

2. Basic Life Support

3. Job Hazard Analysis (JHA) Course

4. Permit To Work (PTW) signatory Course (Permit Applicant)

Known languages:

. Arabic

. English

. French

Courses :

Prosafe RS; Yokogawa Centum CS 1000 & CS 3000

ProSafe PLC /ESD, FA-M3 RTU; Triconex

HMI Cimplicity ;GE 9030 PLC,CCC(compressor control corporation), Bentley

Nevada-7200, 3300 & 3500 Series, Interconnecting CISCO network

CARREER SUMMARY:

Extensive experience in end to end execution of projects Gas Compressors,

DCS & PLC based instrumentation, SCADA Systems and other Field

Instrumentation Projects. Completed apprenticeship in Instrument and

Control and subsequently gained experience within, Petrochemical, Oil and

Gas . This involved most positions from commissioning engineer, lead system

commissioning engineer for PAS-SIS&FGS and QC INSPECTOR (FIELD & VENDOR).

Working on the following types of equipment:

DCS FIRE & GAS, ESD, GAS TURBINES, speedtronics Mark Controls, Bentley

Nevada-7200, 3300 & 3500 Series, Woodward Protech-203 over speed Control v

Control Valves & Positioner, Performance/Load sharing and Surge Testing and

Tuning of turbo-compressor

Overseas experience gained in Russia, Netherlands, France, South Africa,

Angola, and Nigeria

Skills / Competence :

. Expertise in yokogawa DCS,PLC of point definition and configuration,

I/O channel assignment, interconnect wiring design, graphic display

configuration, programming, factory acceptance test, commissioning and

system verification and site acceptance test.

. Responsible for Software Engineering & Configuration of distributed

Control Systems:

Programming & Engineering of Process Control Logics using IEC 61131

Function Blocks Diagrams, Phase Logic Diagrams, Sequential Function

Charts (SFC) & Structured Text.

. Design & Engineering (Preparation of Specifications, Data Sheets,

Equipment Sizing And Selection, Bid Evaluation And Inspection,

Installation And Commissioning Support Of Control And Instrumentation

System.

. Detail control system engineering

. Development of control system logic

. Development and design of the control system and safety system

. Familiar with P&ID control diagram loop and wiring diagrams, as built

plants, automation diagrams; network topologies

. Familiar with loop test for ESD cause&effect and F&G safety system.

. Familiar with electrical and instrumentation equipment specification

. Having good experience in Installation,functional

test,configuration,pre commissioning and commissioning of YOKOGAWA

DCS with Foundation Field Bus Instruments system,PROSAFE PLC for

safety systems(IPS,FGS).

. Writing Pre-Commissioning and Commissioning procedures for all Fire &

Gas Systems, Control systems such as prosafePLC ESD system, Fire &

Gas system and High Integrity Pressure Production System (HIPPS).

Writing the Functional Test( procedures for all types of Control

Valves, Motor Operated Valves (MOV) and all the instruments

. Experience in communicating Systems(using MODBUS protocol

communication) or OPC client with different GTG package

. Experience in installation and configuration of system software,and

installation of Multiplexers (peperl + Futches, MTL) for HART

transmitters etc

. As a specialist in control field service engineering on different

project:

- Supervise the installation, calibration and set up of instruments

- Supervise cable laying, meggering and connection

- Lead and execute loop check and commissioning phase, performing

the functional tests.

- Lead and execute unit start-up and performance tests

. Vibration analysis & trim balancing of Solar engines/compressors &

also non-Solar driven equipment, i.e. pumps & generators

[pic]

Work History :

05/2007 to 07 /2009: Sakhalin OPF in Russia

Lead Commissioning Supervisor and Field bus / PCS Engineer reporting

directly to the project Manager

06/2007 to 07 /2007: Bonny Terminal Integrated

Plant Nigeria

EPC: HHI Korea

Process: LNG

System Integration Test with other System Vendors reporting directly to the

project Manager

* In charge in conducting DCS Hardware Systems site Acceptance Test (SAT).

- Cabinets Inspection

- Controllers & Power Supplies redundant test

- IO Cards channel testing

- Controller & IO Carriers inspection

- Wirings & Termination Inspection

- Network Interconnection & Testing

- In charge in preparation of project documentations and site software

Support

- Attending daily progress meetings.

.

- commissioning of OPC link with two Nuovo Pignone Turbine powered 30MW

Gas Compressors & two Siemens Turbine powered Nuovo Pignone 15MW Gas

Compressors the link with DCS was OPC

04/2007 : FOSKOR Complex South Africa

EPC: FOSKOR

Process: Petrochemical

Engineer instrument/ DCS/ESD YOKOGAWA

Commissioning and maintenance

Design, engineering, installation and commissioning of CS3000 yokogawal DCS

System

- Installation and commissioning of process instrumentation i.e. Mass Flow

Meter-Micromotion, Smart Transmitters-Fisher Rosemount, Smart Positioner-

Fisher Posemount.

- Handled effective maintenance of

- DCS- (YOKOGAWA), Foundation Fieldbus and Advanced Process Control Loops.

- Control System of Boilers and Steam Turbine (Boiler-American Shack,

Turbine-Siemens)

-upgrade DCS system

03/2007 : Malongo Project / On OFF shore Chevron Angola

EPC: Chevron

Process: Oil

Engineer DCS/ESD YOKOGAWA South Africa

Commissioning and maintenance

Successfully handled commissioning & maintenance of

- Central Control Panel and associated process instrumentation used for oil

& gas processing. (Controllers, Transmitters, Control Valves, Turbine

Meters).

- En-Tronic Control of Process Gas Compressor (Gas Generator-Rolls Royce,

Power Turbine-Cooper Bessmer, Compressor-Kawasaki)

- Instrumentation System of Centrifugal Pumps Driven by Gas Turbine.

(Vibration System and Temperature System Monitoring)

- Control and Instruments of Gas Turbines used for electric power

generation.

- Fire and gas Detection System using PLC (Series 3 General Electric)

- Ensured effective preventive & corrective maintenance of Pneumatic

Control Panel, Hydraulic System, Electronic Controller, Vibration &

Temperature Monitoring Systems, Rosemont Transmitters, Control Valves,

Daniel Turbine Meter, Rosemount Transmitters, Control Valves, Turbine

Meters Electronic Exchange and Telemetry System.

01/2007 to 02 /2007: Arya Sasol Polymer Co - 09th Olefin Complex

Ethane Cracking Plant Iran

EPC: Technip France

Process: Petrochemical

Lead Engineer DCS/ESD YOKOGAWA

Commissioning and start-up

As a PAS/SIS&FGS Engineer, I am responsible for Control Logic Engineering

/ Programming, HMI/Operator Interface Graphics Display Build-Up, OPC

Mapping & PI Report Generation based on customer's functional specification

and project documentations.

* Commission and Calibrate Foundation Fieldbus Field Devices namely Fisher

Fieldvue DVC5000F Digital Valve Controller, Rosemount 3051 Pressure

Transmitter, 3244 Multi Variable Temperature Transmitter, 8800 Vortex Flow

Transmitter, Micromotion 2000 Coriolis Mass Flow Transmitter, Rosemount

Analytical OXT5000 Oxygen Analyzer and Rotork FF Motorized Valve.

* Responsible for conducting site Acceptance Test (SAT) on Software System

Setup such as

Customers Control narratives, Functional logics and System Integration Test

with other Vendors

* Responsible for conducting Factory Acceptance Testing (FAT) on Hardware

System Setup such as Rittal Cabinets, DeltaV, Redundant Power Supplies, IO

& Fieldbus Cards.

* Provide training, guidance and direction to polymer Plant Operation

Engineers & Instrument Technicians on the best utilization of DCS and

proper installation / commissioning of Foundation Fieldbus Technology as

integrated to the DCS.

09/2006 to 10 /2006: Jam Petrochemical Company - 10th Olefin Complex

EPC: Technip France

Process: Petrochemical

Lead Engineer DCS /ESD YOKOGAWA

Commissioning and start-up

I had been assigned to work at project in train 3 and train 4 (the early

stages). The areas of responsibility were utilities offsite, sea water

intake, process (propane compressor, mixed refrigeration compressor, off

gas compressor, oxidation air compressor, and vendor package).

b)Conducted preliminary inspection such as glancing & termination of

instrument cable, JB installation, field instrument installation, leak &

pressure testing of impulse line and air line for instrument, cable laying

prior back backfilled and tray works prior cable pulling, to the sub-con

CCC prior to final inspection with company.

c) Conducted material arrival inspection at warehouse and yard, such as

cable drum IR test.

d) Monitored and coordinated functional check of DCS.

04 /2003 to 06 /2006: Project In SALAH Gas Algeria (Joint venture : British

Petroleum /STATOIL /SONATRACH ALGERIA).

EPC: KBR /JGC

Process: GAS

FA-M3 /SCADA, Leak detection on Pipe.

Commissioning CS3000 Start up

Technical Assistance for ICSS system

under YEF

. As a PAS commissioning engineer (with Japanese team) and RTU

specialist I start project form end to end and during commissioning I

perform serial link test with Rolls Royce GTG in krechba field.

. Assisted vendor pre-commissioning to commissioning of Power Generation

Package by Rolls Royce

. Monitored site work progress of control system part

. Assisted technical query to the construction group

. Training of personnel on all operations & maintenance of all YOKOGAWA

staff

. Planning all platform maintenance repairs incorporating and coordinate

with engineer planer

. Coordinated and applied work permit in the different areas of

responsibilities

12/2002 to 03/2003 : Development CS 3000 coke oven project

(ISPAT Annaba)

. Preparation of control narrative

. Design, engineering, installation and commissioning of CS-3000

YOKOGAWA System

. Installation and commissioning of process instrumentation i.e. Mass

Flow Meter-Micromotion, Smart Transmitters-Fisher Rosemount, Smart

Positioner-Fisher Posemount

03/2002 to 11/2002 : Project IN-SALAH GAS YOKOGAWA Netherlands

Programming RTU FA-M3 preparing

of FAT

documents

01/2002 : Engineer Automation with EVOLUTEC

INTERNATIONAL Engineer Automation

Service and maintenance

1997-2001 : Supervisor, Field Engineer on LNG

Complex Sonatrach

Skikda



Contact this candidate