Andrew Kulatunga, **** Williams Way Lane, Dallas, TX, 75228
214-***-****, **********@*****.***
Objective: Seeking a position as construction Project manager / Assistant
project manager/ Project Engineer/ Site superintendent/.
Summary of Qualifications
Project Management/Site Superintendent:
. Possess proven skills and over ten years in experiencing of commercial
construction project management, project superintended, field
engineering.
. Have knowledge of all facets of construction and remodeling, materials
and methods,
purchasing, negotiation, techniques, Plans and Specifications.
. Experiences with plan and execute construction with quality and to build
working
relationships with project owners and managed relationships with owners'
representatives, architects, engineers, contracts and clients on a
professional level
. Knowledge of safety, technical, blueprints, MS project, RFI, budgeting
and building code
(ADA & health) requirements.
. Coordinated and resolved technical and engineering issues according to
code
requirements with contractors, engineers and architects.
. Led the preparation and review of trade contracts documents, budget, and
major purchase
orders, conducting meeting.
. Checked for compliance with construction documents and estimates and
provided
monthly cost analysis for all active preconstruction assignments and
reconciled
department budgets.
Schon Builders, Dallas, TX Project Manager/ Site Superintendent,
June 2008- Feb 2009
Hampton Inn, 42,000 Sq ft, Wood frame structure, 4
Story 95 units.
Woodward, Oklahoma. Directly involved: Storm water system, Exterior
EIFS, Landscaping, Indoor pool, Indoor
plumbing, Framing, Insulation, Roofing, HVAC
System, Counter tops, Elevator, Door & Window,
Building inspection, and all other aspect for
finish out.
La Quinta, 54,000 Sq ft, Wood frame structure, 3 Story 97 units.
Woodward, Oklahoma. Directly involved: Storm water system with 2150 sq
ft Retention pond, 11 775 sq ft driveway
approach, Exterior EIFS, Landscaping, Indoor
pool, Indoor plumbing, Framing, Insulation,
Roofing, HVAC System, Counter tops, Elevator,
Door & Window, Fire sprinkler system, Building
inspections and all other aspect for finish
out.
NU-Build Inc, Dallas, TX. Project Manager / Coordinator,
April 2005 - May 2008.
Wylie Senior Care Living Center, 38 000 Sq ft, Metal and Wood frame,78
Units.
Wylie, TX. Pre construction meeting, ground breaking, Excavation,
underground utilities and plumbing, 57 000 sq
ft concrete work, Landscaping, CMU, Brick panel
fence and exterior Lime stone, Frame works, all
interior work, MEP and Fire sprinkler systems,
All other aspect for completion to project,
Inspection with State of TX,
Trident International Plaza, 236 000 Sq ft, Tilted wall 2 story, 78 Units,
Harry Hines Blvd, Pre Construction meeting to Certificate of
Occupancy.
Dallas, TX. Titl-wall panel and CMU structural steel and Bricks veneers,
Cargo Elevator, all retail units and site
improvements and all aspects of project till
completion.
Harry Hines Tread Center, 200 000 Sq ft, Tilted walls single story, 56
Units.
Harry Hines Blvd, Pre construction meeting to Completion of the
project.
Dallas, TX. Tilt-wall panel and CMU structural steel and Bricks veneers
front, all retail units and site improvements,
storm water system, and all aspects of project
till completion.
Redeem Church, 14,000 Sq ft, Metal Frame and CMU structural, 2 Story.
Park Blvd, Pre construction to completion of the project.
Plano, TX. Metal Structure frame with CMU veneers, 26 000 Sq ft parking
lot, Storm Water system, MEP system, interior
granite finish walls MEP.
Kulsham Chevron, 10 500 Sq ft, Metal frame and CMU structural, 01 story.
191 & Joyce Line, Pre construction meeting to completion of the
project.
Carrollton, TX. Adding underground storage tanks and Pumps, Metal
structure canopy, 10 door panel cooler, Brick
exterior, all interior improvement and all
other aspect for retail environment.
Topaz (Indian Cuisine), 11 750 Sq ft, Restaurant (Remodeling)
Dallas, TX. Remodeling project according to owner specifications.
MCR Contractors, Dallas, TX. Assistant Project Manager
Mar 2004 - April 2005,
Shiloh Shopping Center, 148 000 Sq ft, 48 Units,
N, Shiloh Rd, Lime stone, Brick veneer and EIFS finish
out an all exterior Garland, TX. improvements.
Hamilton Dental Care, 19 500 Sq Ft, Complete lime stone exterior and
interior
Austin, TX. paint and all aspect for exterior and interior
improvements.
Raj Shell, 13 000 Sq Ft, Interior and exterior finish.
South Lake, TX. Brick veneer and EIFS Exterior, Tile floor and
oil base
interior finish.
LBJ Texaco, 10 250 Sq Ft Interior and Exterior finish.
LBJ Free Way, Brick veneer and EIFS Exterior, Tile floor and
wall paper
Dallas, TX. Interior finish
Arnold Constructions Field Engineer, Assistant P, Manager,
(UK) Ltd, Sri Lanka.
Mar 1989 - Oct 1994
Central Province Campuses, 160 000 Sq Ft, Metal and Brick structure, 165
units, Three. Story
Kandy, Sri Lanka. (Five complexes). Foundation, assistant to
preparing, manpower, equipment, and material
schedule, necessary corrective action for
plumbing work, including concrete placement,
footing, column, and roof slab reinforcement.
120 Mile two lane high way, 120 Mile high way with 04 bridges.
Sri Lanka. Assistant to preparing, manpower, equipment, and material and
all other aspect for field engineering.
Education
BS - Construction Engineering and Technology University of Moratuwa, (Sri
Lanka) 1988-1993
Associate Degree - Business Management Open University of Sri
Lanka, 1991-1993
Certificate for Project Management Richland College 2005
Certificate for Project Management LSC International Inc 2009
Certificate for OSHA General/Healthcare University of Texas at
Arlington 2009
~ pursuing four year degree in construction management and technology in
North lake college /CEF~