Post Job Free
Sign in

Manager Quality Assurance

Location:
Milwaukee, WI, 53222
Posted:
June 10, 2010

Contact this candidate

Resume:

DONALD PIRLOT

***** **** ******** *****

Wauwatosa, Wisconsin 53222

414-***-****

Summary of Skills:

Experience encompasses the following areas:

. Lean Manufacturing and Kaizen problem solving

. Excellent employee relations

. Revitalized two businesses from Loss position to a Profitable position

. ISO 9001 certification within 9 months of project initiation

. Customer focused by exceeding their expectations and maintaining good

customer relationships

. Improved efficiencies from 71% to 87%

. Reduced costs by more the $1,000,000 by reduced inventory, recycling

hazardous waste, introducing a new process

. Improved On Time delivery from 83% to 98%

. Self starter with excellent budgetary skills

. Reduced inventories by 37% while maintaining on time delivery

Experience

Spancrete Machinery Corporation

2007 to Apr 2010

(Manufacturer of concrete construction equipment) Worldwide sales of both

wall panels and hollow core floors reducing costs and construction time)

GENERAL MANAGER

Responsibilities include all aspects of design, quality, manufacturing,

maintenance, budgeting, etc

. Redesigned our concrete saw to improve performance while decreasing

costs by $45,000 per machine

. Redesigning our slip former to improve quality, simply operation and

expect $38,000 savings per machine

. Reduced costs by reduced labor force, purchasing, component redesigns,

and new supplier development

. Dramatically improved customer relations by personal involvement,

redesign and development of a new tech

. Reduced inventory loss by $500,000 per year by improved BOM accuracy,

and labor reporting

. Improved employee relationships by involvement, design review meetings

. Increased throughput by 25% to meet customer requirements

Earth Tool 2007

(Manufacturer of underground sewer pipe replacement equipment.)

PLANT MANAGER

Responsibilities include manufacturing, quality, maintenance, budgeting,

purchasing, and transportation

. Redesigned a product to eliminate 4 parts reducing costs significantly

. Established three cells within product assembly increasing throughput

and reducing assembly costs

. Reduced steel costs by combining all materials and negotiating with

suppliers for the complete package

Permacel: Pleasant Prairie, Wisconsin

2006 to 2007

(Manufacturer of adhesive tapes used in a variety of industrial

applications. Industry utilizes advanced technology in manufacturing

processes and in the environmental oxidation equipment necessary to produce

the product)

CORPORATE LEAN/KAIZEN MANAGER

Responsible for leading Lean and Kaizen activities within all plants within

North America

. Led the 5S activities which helped cleaned & organized the plant

. Established a solid baseline of data which was not possible before

. Kaizen activities have led the organization to approximately $50,000

per month of savings

. Training a number of employees in the use of Lean & Kaizen techniques

PLANT MANAGER

2001 to 2006

Responsible for all aspects of manufacturing, quality, maintenance,

engineering, budgeting, and the profit center

. Part of a project team that designed and built the $60,000,000 plant

. Interviewed and hired all employees

. Developed all of the new manufacturing processes

. Once the equipment was commissioned to manufacturing products were

qualified on schedule

. Maintained a minimal staff during the commissioning of the plant

. Achieved most of the goals for the plant efficiency

Dickten and Masch Company: Nashotah, Wisconsin

1998 to 2001

(Manufacturer of injection and compression molded plastics. The product

breath included both thermoset and thermoplastic parts supplying large

appliances, electrical component, farm equipment, and transportation

industries)

PLANT MANAGER

Responsible for all aspect of manufacturing, maintenance, process

engineering, budgeting, and the profit center

. Revitalized a failing plant which was loosing in excess of

$1,000,000/year to a break even position

. Transformed existing equipment from inadequate operation to fully

operational equipment

. Increased on time delivery from 51% to 94%

. Reengineered our staffing to reduce costs by $300,000/year

. Decreased cycle times by 12%

. Designed and installed three 6-axis robots creating a revolutionary

flash removal system

. Eliminated six positions by the utilization of the robots

. Reduced scrap by 39%

W. H. Brady: Milwaukee, Wisconsin

1991 to 1998

(Manufacturer of adhesive tapes used in a variety of industrial

applications.

Operations Manager 1993 to 1998

Responsible for manufacturing, engineering, customer service, purchasing,

materials, quality and maintenance

. Budgeted, organized, floor plan layout, combined a Florida plant

operation and equipment into an exis

. Achieved annual cost savings of $1,000,000 in 1995, 1996, and 1997

. Reengineered the staff reducing the overhead by two salaried positions

. Reduced personnel from 84 to 67 employees while increasing

productivity by 16%

. Increased yield from 82% to 92.3%

. Reduced inventory by 21%

. Provided sales engineering support to customers

Quality Assurance Manager 1991 to 1993

Responsible for product quality and implementation of ISO 9001

. Developed, implemented, and received approval for ISO 9001 in nine

months

. Cost of ISO 9001 significantly below budget

. Revised work instructions

. Provided technical support and communication with customers

. Trained personnel on the new quality systems

Signicast Corporation: 1987 to

1991

(Manufacturer of precision investment castings for the automotive, farm,

aircraft, flow controls, and valve industries)

Responsible for all aspects of Quality Assurance

. Attained Ford Q1 Quality Achievement Award

. Established SPC in strategic processes to determine the true process

capabilities

. Designed and implemented an effective corrective action system

. Reduced customer returns by 26%

. Taught and implemented DOE (Design of Experiments)

White Rogers Division, Emerson Electric: St. Louis, Missouri

1985 to 1986

(Manufacturer of heating and air conditioning controls)

Quality Assurance Manager 1985 to 1986

Manager of Product Integrity 1985

Education, Affiliations

University of Wisconsin: Milwaukee, Wisconsin

Bachelor of Science, Electrical Engineering

American Society of Quality Control

Certified Quality Engineer

Senior Member



Contact this candidate