Post Job Free
Sign in

Project Manager

Location:
Riyadh, RI, 11495, Saudi Arabia
Salary:
Negotiable
Posted:
January 09, 2013

Contact this candidate

Resume:

Dated: **/**/****

Sector: Telecom, Installation, Testing, Maintenance,

Termination, Service

Subject: Seek Employment

Dear Sir,

Please accept this application for the position of FOC Engineer and

find a copy of my Curriculum Vitae, which identifies the experience,

expertise, and qualification I possess.

Experience Summary:

I am a practical hand on Fiber optical cable that has been successfully

employed national wide in the maintenance, laying and testing of fiber

optical cables for 8 years. Would describe myself as self motivated,

innovative thinker and excellent project planner, supervisor, a team member

who enjoys new challenges, organized and experienced, honest and reliable

who possesses a proud employment record which is discipline varied and

enhances work attributes and abilities.

Being medically fit for worldwide employment, most qualified and motivated

do hope an opportunity exists and an interview will be granted?

Look forward any contact.

Yours sincerely,

Waqas Javed

Curriculum Vitae

Personal Information

Name Waqas Javed

Address House # 71/B, Agarics town 4 km Raiwend Road

Lahore- Pakistan

Place of Birth Sahiwal (Punjab)

Citizenship Pakistani

Sex Male

Marital Status. Married

Visa status Employment(KSA)

KSA ID card No 22 88 24 68 67

Driving license Valid from Saudi Arabia

Email ********@*****.*** ************.*@***.***.**

Telephone +966-*-******* (KSA)

Cell phone +966-**-******* (KSA)

Employment History

LT Engineering (pvt) Ltd:

A well-established Telecom sector in Pakistan as (OSP Team Leader) June

2004 to 2009.

Optical Fiber Cable Maintenance:

. Promoted to manage 18 teams in all over Pakistan to carry out

maintenance of laid Optical fiber network of Mobilink, an Orascom

company of Pakistan.

Preventive, OTDR reports & Corrective Maintenance:

. All measurements for preventive maintenance shall be carried out as

per prior agreed time schedule, which is given by the Customer.

. The testing of all fibers shall be done, as once in a month for each

of the block sections and reports shall be submitted.

. Any defects observed in the OFC cable or in any of the associated

equipment shall be attended in consultation with the Customer at site

during every visit to the stations for measurements, and reports in

case of any discrepancies are observed.

Breakdown Optical fiber Network Maintenance:

This includes the following:

. Mobilization of well equipped teams with all required equipment and

skilled manpower on for fault identification & rectification

. Test link attributes such as splice loss/link loss after the

rectification of fault

. Generating proper documentation in specified formats for the event in

context of :

1. Breakdown maintenance record

- Call registration

- Fault rectification record

- Call closure record

2. Down time and uptime analysis

. Further the following records shall be submitted to customer on

monthly basis

1. Internal records of the issue and consumption of spare parts,

tools and consumables etc

Regular MIS reporting to customer as per the agreed formats

Deployment of O&M team:

. The maintenance of OFC routes on regular basis i.e., 24*7 maintenance

service is to be provided and therefore in the event of any

emergencies, we will crew to attend to such work. Scope of work shall

include Routine OFC Maintenance, Breakdown OFC Maintenance

. The team consists of Team Leader, Supervisor, cable jointer,

Technician/ Patroller, Helper. (For about 200 Kms)

. Tools & Equipment : Our team will be equipped with the following tolls

& equipments- Multi Meter, Splicing Machine, OTDR Meter, Road Meter,

Power Meter, Duct Cutter, Telephone/Mobile phone, Optical Fiber Tool

Kit (Sheet cutter, Striper, Cleaver, Ceramic scissors, Loose Tube

cutter, Ceramic Blade etc.,)

. Updating the As Built Diagram when needed with GPS coordinates.

. Performs the characterization and Testing of laid OFC covering the

following tests.

o Fiber attenuation @ 1310,1550,1625 nm(differentiation between

pressure points and joints)

o Optical link loss

o Insertion Loss

. Execution and supervision of installation and maintenance works of

optical fiber Network.

. To make it ensure the presence on the site where the cable is damaged

or fault is occurred to provide the satisfaction of the customer.

. Execution of the change over work of optical fiber network with the

coordination of the customer by taking the down time.

. To issue the WO to different contractors with complete details for the

execution of the civil work etc.

. Coordination with the customer to execute the major projects well in

time.

. Routine inspection of site work and closing of relevant work orders

with the help of the contractors.

. Quality inspection of the maintenance work with the representative of

the customer to provide the better satisfaction regarding the network.

. To provide the complete documentation report to customer regarding the

finished projects of optical fiber network.

Field Experience:

Working experience in the field of optical fiber is as under.

. Working experience in the field of optical fiber laying, pulling,

jointing and termination.

. Hand on Experience in the operation of testing equipments, EXFO FTB

400, 200, 300, Ecterna 8000 OTDR's, VISUAL FAULT LOCATOR, LIGHT SOURCE

POWER METER, and MAX TESTER.

. Hand on experience in jointing of Optical Fiber by using Fusion

Splicer FUJIKURA 50's, 60's & Mechanical splice for temporary links.

. Coordination with other departments like transmission and planning

after removing the faults of optical fiber network.

. Experience in ODF (Optical Distribution Frame) Termination.

. Testing and Troubleshooting of Optical Fiber link from OLT (Optical

Line Terminal) to customer site ONT (Optical Network Terminal).

. Doing the acceptance job to check contractor's work done and

assuring that job is completed as per Standards.

. Maintained all optical fiber media for FTTH (GPON) infrastructure and

its commissioning and testing.

. Installation of F.O. cables in ODF, to IFP, FDH-(W/I/O). Optical

Fiber splitter installation. Drop fiber termination also maintain the

fibers record.

. Working Experience with different Well Reputed Organization like

MOBILINK, PTCL, NTC and SPECIAL COMMUNICATION ORGANISATION (SCO).

. Experience in the operation of Optical Fiber

. Testing Experience of Optical Fiber ATTENUATION, CUT OFF, GEOMATERY

TEST, DISPERSION TEST.CABLE CUT OFF TEST.

. Clearing Fiber Optic faults with in target times.

. Provision of Fiber optic (OSP) links with in planned time.

. Decision to be taken at site to restore affected services immediately.

. Decision to be taken at site for any changes in planned work, for the

timely provision of services to customer.

. Delay of provision services & restoration of services would effect

customer satisfaction.

. Handsome knowledge about 3G third generation and 2G second generation

Wireless communication systems GSM and CDMA

. Hand on Experience in the field of OSP activities of Fiber Optic cable

under ground installations of direct buried.

. Civil work experience like EXCAVATION, BACK FILLING, Arrange BRICKES

and HNDHOLES as per OSP Standards.

. Solid knowledge of installation specifications, reading of "As Built"

drawings.

. Complete skill of coordinate with installations contractors and

Municipality officials and prepare regularly reports on computer

(office applications) about project progress and quality issues.

[pic]Detecon Al Saudi Co, (DETASAD):[pic]

Working as a OSP project coordinator on company Visa in Detecon Al Saudi

Co, a well established telecom sector in Riyadh Kingdom of Saudi Arabia

(KSA) since Jan 2010 to June 2010.

Fiber Verification project:

. Work experience in FUP Fiber Utilization plan project.

. Trace of fiber routes, T.joints, manholes, junction and access cables.

. Identify the GPS coordinates for the routes, manholes and customer

location.

. Update the fiber joint schematics diagrams, Geo maps and Floor planes.

. Project implementation as per construction standards.

. Prepare site diary as per project implementation quantity.

. Testing of up to 1000 fiber cable by using OTDR.

. Testing of optical fiber cable by light source Power Meter.

. Testing of all distribution cables

Saudi Telecom Company (STC): [pic]

. Working as OSP project Coordinator in Fixed Network implementation

Dept of STC head office in Riyadh Kingdom of Saudi Arabia (KSA) since

June 2010 to date.

Being an OSP Project Controller responsibilities are as under

. My main responsibilities are to assist to project Manager regarding

project closing, updating of projects by using MS office (word, excel,

Power point), Lotus mail and oracle applications. As for as all

invoice related issues, assignments of jobs to contractors, follow up

and coordination with Ministry of Transport, Municipality, Saudi

Electric Company, and Water Company for approvals, issues through

official letters.

. Coordination of OSP (FOC) relocation projects and updates the

progress, plane and projects budget analysis kingdom vise.

. To check and verify all contractors related jobs.

. Material reconciliation of submitted dairies by the contractors.

. Submission of dairies to project control section after approval from

engineering section.

. Calculation of all store (issued and returned) regarding contractors

jobs.

. All types of project updation.

. Coordinate with account section regarding contractor's jobs.

. Prepare work orders, filing, print outs of drawings, area maps,

schedules, and requests.

. Keep track OSP relocation more than 250 jobs with sub Cons and update

with key management.

. Work experience over online STC Database FNT, NFTS and SWAT.

. Handsome experience in the field of dial up project.

.

Education

2011 M.S.C: (Masters in Telecommunication) PRESTON University (2011-

2013)Inprogress

2009 B.Tech Pass: (Specialization in Electronics Technology) PIMSATS

University 4-A new Muslim Town Lahore Passed with 1st Division grade is 3.2

GPA 2007-2009

2006 DAE: (Electronics Technology) Diploma of Associate Engineering from

Punjab Board of Technical Education Allama Iqbal Town Lahore Passed with

1st Division 2003-2006.

2002 Metric: (Science) Secondary school certificate from Board of

Intermediate & Secondary Education Multan Passed with A1st Division 2000-

2002

Certification

2011 EXFO (Testing Expert) certified from EXFO for the Fiber Optic

splicing, Testing and commissioning specially for FTTX on 1490 W.L, and LDN

links on 1550, 1310 and 1625 W.Ls and measure the splice loss, Total link

loss, link reflection, and also make connectors inspection by using FIP-400

Fiber Inspection Probe.

2006 Apprenticeship (Mechanical Technology) Punjab Board of Technical

Education GATC Sheikhupoura Which offer by Atlas Honda Company Limited

Pakistan based on experience in Computer Numerical Control system passed

with 1st Division 2003-2006.

Expertise and Skills

Expertise's / skill Level Years in Practice Last Used

MS Office Expert More than 5 Years Continued

MS Project Intermediate more than 1 Years Continued

Electronics Work Intermediate More than 5 years Continued

Bench

Windows, Intermediate More than 5 years Continued

2003/xp/Vista

Project Leader Expert More than 5 years Continued

Interests

Reading books, Novels, Newspaper and playing Cricket are my main

interests.

[pic][pic][pic]



Contact this candidate