Engineer Mechanical

Location:
Littleton, CO, 80123
Posted:
July 20, 2010

Contact this candidate

Resume:

Matthew D. Bokan

865-***-****

**** *. ******** **

Littleton, CO 80123

******@*****.***

PROFESSIONAL SKILLS:

A motivated, self starting, reliable, young professional engineer with a

solid work ethic, and a passion to continuously challenge myself and grow

as an Engineer and Leader, allowing both myself and my employer to profit.

I am experienced in working as a Project Engineer both by myself and as a

member of a multidisciplinary engineering team. As a team player I have

been both a member and an active leader; as the Team Lead I managed not

just the project but the other team members as well.

My primary experience is running a project throughout the full life cycle,

from initial kick off meeting, through design to requisitioning and

fabrication, to inspections and culminating with the installation and

commissioning of the project.

During commissioning, I gained management experience as I was the Site

Supervisor in charge of coordinating workload and manpower amongst my

company, the customer, and contractors on site.

Relevant Engineering skills are: AutoCAD R14, 2001, and 2009, Inventor

2010, SolidWorks 2002, 2005, and 2009, Cosmos, SolidWorks Simulation, Six

Sigma, Lean Manufacturing, Kaizen events, 5S, GD&T to ASME Y14.94, rapid

prototyping, QA Inspections, MS Office Suite, MS Windows, ECN use and

creation, and vendor management.

EXPERIENCE:

Metron, Inc., Denver, CO, January 2010 -

April 2010

Metron is a supplier of Packaged Pump Systems, Fire Pump Controllers, and

Custom Electrical Products, of which Switch Gear is their specialty.

Mechanical Engineer

. Low-voltage switch gear. Worked individually or with others to design

low voltage switch gear.

. Primary duty was the design of low voltage switch gear. Includes, but

not limited to, bus work, tap boxes, gear with metering sections, and

all housings.

. Secondary duties included design work for packed pumping systems,

working with assembly to ensure correct builds, provided information

to improve designs.

CORE Furnace Systems Corp., Coraopolis, PA, January 2007 -

August 2009

CORE Furnace Systems is a supplier of metal making equipment, focusing on

furnaces, material handling, and key auxiliary equipment for steel mills.

Project Engineer (Sept. '08- Aug. '09)

. Melt Shop Department. Working both as an individual Project Engineer

and as either a team member or team leader on multidisciplinary

engineering teams.

. Primary duty was the design of metal making equipment, including but

not limited to: Electric Arc Furnaces, Ladle Metallurgy Furnaces,

Vacuum Tank Degassers, Material Handling Systems and related auxiliary

equipment. This involved following the product throughout the life

cycle from initial kick off meeting to design, to fabrication and

inspection, to installation and commissioning.

. Secondary duties included the QA inspections on fabrications, drawing

review, requisitioning, and document control for each project. As the

project engineer, I was responsible for approving all drawings in the

package, requisitioning all required parts and fabrications,

inspecting or setting up inspections for all fabrications, and

overseeing or setting up installation and commissioning.

CORE Field Supervisor (July '08 - Sept. '08)

. Revamp of an EAF in Quebec, Canada. As the field supervisor I was

responsible for the installation and commissioning of the project and

of the coordination of manpower and workload between CORE, the

Customer, and all on site contractors; completing the job ahead of

schedule and after installation of the new equipment the customer saw

production doubled and power consumption reduced by 40%.

Lead Mechanical Engineer (Jan. '07 - June '08)

. Led multiple multimillion dollar projects that were completed on time

and on budget.

Yale Commercial Locks and Hardware, Inc., Lenior City, TN June 2006 -

November 2006

Yale is a supplier of locks and hardware for commercial buildings and

facilities.

Product Engineer - Contract through Aerotek

. Cylindrical Profit Center. As a Product Engineer, I was a member of a

multidisciplinary Engineering team responsible for the Cylindrical

Profit Center.

. Primary duty was the development and management of current products,

this included but is not limited to improving current products,

solving problems on the production line, creating drawings, creating

or modifying ECN (engineering change notices), setting up and running

durability tests.

. Developed prototypes and testing for various products to improve

overall reliability, quality, and value. Prototypes were made in

house from drawings that I created and then installed on testing

fixtures that I designed and oversaw the running of.

. Responsible for the redesign of two lock functions, reducing failures

by 30%.

. Developed a new product that would take the place of 6 current

products. This lent itself to a cost reduction and parts savings of

well over 100% as compared to the current product line.

. Worked with Quality Control to design and develop new hard gauges to

improve quality checks. These gauges were used to help lower the

instances of incorrectly stamped parts from the in house presses by

40%.

. Designed and developed new test equipment for cycle testing

electromechanical lock sets. These fixtures helped to lower the

instance of warranty work on this particular product by 30%.

. Worked in conjunction with Manufacturing Engineer and Continuous

Improvement leader to create designs for gauges, parts, equipment to

aid in Lean Manufacturing goals and to help achieve the Six Sigma

goals for our area.

Precise Cast Prototypes and Engineering, Inc., Commerce City, CO January

2006 -April 2006

Precise Cast specializes in non-ferrous prototype castings and machined

parts, and low volume production runs of parts made from Aluminum, Zinc,

and Magnesium.

Project Engineer (Interim)

. Primary duty was Lead CAD Drafter, and as such all drawings were

created to be sent out for tooling creation or rapid prototyping to

use in the mold making process.

. Responsible for all parts outsourcing to local machine shops, heat

treat, and plating houses. Coordinated with the vendors and the shop

floor to schedule pick ups and drop offs.

. Managed outside machining projects. Worked with the machine shops to

get quotes, inspection progress and the final product, and schedule

shipments.

. Inventory Control duties where new organization and tracking

procedures were implemented. This helped to lower the instances of

inventory variance and helped to keep cost and extra parts down.

Overall improvement was in the 35% range.

Personal and for Profit, Radio Controlled Rock Crawler 2004 -

Present

. Lead Engineer, CAD Drafter, and Sponsored Driver for Sinastir

Crawlers, from January 2008 to January of 2009.

. Developed 1 full new chassis, and helped with another new chassis for

Sinastir Crawlers

. Active Competitor along with being a past National and Local Rules

Chairman.

. Designed and scratch built five different rock crawlers. Currently

field three trucks, one for each of the officially recognized classes.

EDUCATION:

Colorado School of Mines, Golden, CO

Bachelor of Science in Engineering, Mechanical, December 2009.

* References available upon request.



Contact this candidate