Seven startups, two as Construction Manager and five as Lead Start-up or

System engineer on PC and CFB Boilers ranging from 300 MW to 600MW using

coal and pet coke as primary fuels. Three retro fits with newer technology

DCS Turbine and Boiler controls with major boiler and APC retro fit or

replacements to comply with title 5 or other air quality permitting

requirements. Two major outages on Combine Cycle CT (7FA and Frame 5) units

with the addition of HRSG units and Water Vapor Injection Systems for

increased capacity. Coordinated the instillation of low NOX burners through

outage planning / scheduling on CT units and large coal fired boilers.

Enjoy learning and teaching new technology skills to Operations and

Maintenance at all levels.

WORK EXPERIENCE

Nov. 2008 to Mar. 2010 (Tentative Contract completion date)

Contracted to Bechtel / Luminant

Sandow 5 Rockdale, TX600 MW CFB

Start Up Mech. Engineer / Support Engineer for Operations/Maintenance for

Luminant

Commissioning Engineer for CFB Boilers and Large Rotating Equipment.

Responsibilities include: Commissioning Pumps, Motors, Fans, Damper

drivers, Lubrication and Hydraulic systems. Flushing of oil systems, Boiler

Refractory Cure, Boiler Refractory Inspections, Initial Balancing runs on

all fans, Draft balancing on both boilers and working draft controls into

automatic operation and building air flow curves through DCS programming.

Work with Forester Wheeler on site to set Boiler Firing parameters with Air

Flows, Fuel and Temperature per missives. Insure firing parameters are

usable and obtainable. Work with FW on HRA vibration problems and plan

outage scope for baffle installation and other warranty issues. Oversee

Tube leak repairs on boilers during testing. Review and complete system

turnover packages from subcontractors.

July 2006 to Nov. 2008

Director of Technology Livengood Management

Responsibilities range from Review on Turbine/Boiler Application to

Construction and Start-Up Management responsibilities as the owner's or O&M

Contractors representative on Large CFB boilers.

CT Outage Planning, HSRG Installation, SCR Installation and Outage

Management

Oct. 2003 to July 2006

Maintenance Manager/TMC Outage Manager

James Hardie Building Products

Plant City Florida

Responsible for the daily Maintenance Management, budgeting with 1 and 2

year projections. Outage Manager on capital projects and Major Outages

company wide (11 Plants across US) review, planning and manage. Manage the

monthly Maintenance Budget of 630k. Direct reports include 2 Maintenance

Supervisors, 1 Electrical Supervisor and 39 hourly workers. Manage

traveling maintenance crew of 1 supervisor and 10 technicians.

Returned to Tamuin, Mexico Jan. 20, 2005 to review first major warranty

outage. Reviewed scope and budget of 6.6 Million dollar outage and retro

fit. Outage plan was off by 9 days and the scope had to be reduced. A

budget reduction of 1.8 million due to scope change. This was a commitment

arranged with James Hardie Building Products and Sithe Energy.

September 2002 to Oct 2003

Training Manager / Maintenance Manager (Contract with Livengood Management)

Sithe Energy Tamuin CFB Project Teg I & II

Tamuin, Mexico

Maintenance Manager of the 520MW CFB Petroleum Coke fired power plant in

Tamuin Mexico.

Responsible for the set-up and implementation of the PM, PdM and MMS

system. Commissioned the 4 CFB boilers with modifications and re-design of

the ash transport system. Planning for 1, 3 & 5 year forecast for outages

and budgets. Implementation of Thermography and Vibration Analysis programs

on electrical and mechanical equipment. Set up PLC and DCS training for I&C

personnel. Lead Instructor on CFB Operator Training for 8 Shift Supervisors

and 16 control room operators. Supervise 6 Spanish supervisors and 52

Electrical, I&C and Mechanical workers. Responsible for the $35 million O&M

budget and $14 million Capital budget. Scheduled outages for the 5 year

plan with expected budgets with up-side, down-side possibilities based on

Power Purchas Agreement and Forced Outage days .

October 2001 to September 2002

Start-up Commissioning Engineer

JEA North side Re-Powering Project (Contract with Livengood Management)

Northside Generating Station Operations responsible for providing

expertise and assistance during the transforming of the Northside CFB Units

1 & 2 from construction and refurbishment phase through commissioning and

operation, design for high performance, efficient, cost effective and

environmentally compliant and safe operations. Additional duties include

design reviews, contract compliance and boiler commissioning and

Maintenance coordination. The project consists of two coal and petroleum

coke fired 1,993,591Lb/hr Foster Wheeler Circulating Fluid Bed Boilers and

two 297.5Mw refurbished General Electric turbine/generators

Plant Manager/ Operations Manager

Pinellas County Resource Recovery Plant

Managed the construction and start-up of the 53mm boiler retro fit project.

Managed the demolition of the precipitators and new installation of WAPC

Bag House emissions system to comply with title 5 clean air permitting at a

cost of 23mm. Lead on EPA and DEP hearings for operational permit changes

and regulatory compliance.

Maintenance Manager

Ocean Kay Bahamas Marcona Ocean Industries

Frame 5 CT, Compressors, Water systems and Heavy Equipment

Start-Up Commissioning Engineer / Operations Trainer

Cedar Bay Generating Station PG&E

230MW CFB Coal Fired Boiler

Start-Up Commissioning Engineer/Operations Supervisor

B&W EPC Contractor and Operator

Palm Beach County Resource Recovery

3000tpd RDF units

Start-up Engineer

Combustion Engineering / Operations Supervisor

Detroit Resource Recovery Combustion

4000tpd RDF Units

Start-Up Commissioning Engineer/Operations Manager

Bay County Resource Recovery

Westinghouse Technology

Gulf Power Company

500MW PC Coal fired Foster Wheeler Boiler

2 Frame 5 CT's

Control Room Operator

Listed below is a portion of my education.

EDUCATION

Ashwood University

Humble, TX

B.S. Mechanical Engineering June 12, 1998

RAM Technical Institute

Greenfield, MI

Boiler Maintenance and Operating Engineering License, Unlimited

License, November 1988

NUS Corporation

Instructor Training on Power Generation 1988

Instructor Training on "The Adult Learner" 1992

Accreditation's and Licenses

ASME Chief Facility Operator License

First Class Stationary Engineers License: Unlimited Turbine and

Boiler Operation.

Merchant Marine Captains License

Management Training

High Impact Leadership Seminar - Staub Peterson

M.A.R.C. - Management Associated Results Company, Inc.

Front Line Leadership Seminar - Zenger Miller

Coaching Skills for Managers and Supervisors - Fred Pryor

Worldwide Lessons in Leadership - Dr. Stephen Covey

The Power Plant Management Institute - Information

Forecast Inc.

Twenty-First Century Leadership - Dr. Denise Waitley

and David Cowan

Technical Training

Allen Sherman Hoff Ash Transport Systems and Storage Training

Westinghouse Turbine Installation Setup, Performance Testing

and Calculations

Vibration analysis, PM, PdM, Thermography and Steam Path Audit

Evaluation

Project Management Training

Tag Link Tag out system / LOTO Safety Training Program

Indus, Passport and Main Saver MMS (Maintenance Management

Systems)

Combustion Turbine Training

LM9000 With HRSG Duel Fuel Combustion

Frame 5, 6 and 7FA With HSRG's

Control Schools:

Bailey Net 90 ABB Signature Series DCS Controls

Westinghouse WDPF DCS Controls

Westinghouse, MH and EHC Turbine Controls

General Electric Mark VI and EX2000, EX6000 CT Controls

Turbine Generator Training

General Electric;

Westinghouse

High Voltage Switchgear

(500kV OCB, 230kV OCB, 230kV)

(13.8kV, 4160v Breaker repair and testing)

Professional References

Gregg Graham Boiler Specialist Shaw Corporation

904-***-****

Rod Sheets Bechtel Corp. Lead I&C Start-up

623-***-****

M. Qasim Shaikh Construction Manager Foster Wheeler Corp.

908-***-****

Steve Wicker GE Turbine Specialist

979-***-****

Ed Cretsinger Senior Start-up Manager for Bechtel Corp

240-***-****