Post Job Free
Sign in

Project Manager Air Force

Location:
Denver, CO, 80209
Posted:
March 09, 2010

Contact this candidate

Resume:

Brice Woodlock

720-***-**** *** S. Corona St Denver, CO 80209

*************@*****.***

My experience has been mainly during the investigation stage and monitoring

programs. I have some remediation experience and would like to continue my

career in the remediation stage of projects. I am looking for a company

that would value my hard work, innovative ideas, and initiative.

PROFESSIONAL EXPERIENCE

> Brown Rice Environmental, Denver, Colorado February 2009 - Present

Sole Proprietor

> URS Corporation, Denver, Colorado October 2002 - November 2008

Project Manager, Field Event Manager, Chemist

Specific Project Experience

Basewide Site Inspection, Buckley Air Force Base, CO: Project Manager

duties included proposal preparation, work plan development, tracked

financial status, developed and maintained schedule and prepared field work

activities.

Range Remedial Investigation, F. E. Warren Air Force Base, Cheyenne, WY:

Developed sampling rationale and plan for the small arms range

investigation in support of an unexploded ordnance (UXO) Remedial

Investigation (RI). Planned and coordinated soil sampling events to

delineate about 3000 acres for munitions constituents (MC) from firing

ranges and for metals from small arms ranges (SAR). Collected and analyzed

over 800 soil samples for SAR sampling using field x-ray fluorescence

(XRF). Prepared the Sampling and Analysis Plan and the RI Report.

Supported geophysical staff through locating anomalies with GPS and

flagging each location.

Tanapag Fuel Farm Project, Saipan, Commonwealth of the Northern Marianas

Islands: Project manager and field lead for this project. Performed

delineation of petroleum products and metals in support of removal of six

10,000 barrel above-ground storage tanks through the EPA Region 9 START

contract. Analysis of the soil was performed by PetroFlag for petroleum

and using an XRF for metals.

ERP Site 7 Sludge Drying Beds Supplemental Site Characterization, Buckley

Air Force Base, Aurora, CO: Developed the technical approach through

evaluation of historic documents, determining data gaps, developing data

quality objectives, preparing the work plan, executing the plan, and

completing the report. Utilized XRF results for delineation of metals.

Remedial Investigation, Peterson Air Force Base, Colorado Springs, CO:

Developed investigation plan and led the field event to characterize skeet

range for metals and PAH levels. Included 13 firing locations within the

skeet range. XRF was used to screen samples. Prepared work plan and report.

Remedial Investigation and Corrective Measures Study, Malmstrom Air Force

Base, Great Falls, MT: Performed investigation and subsequent remediation

of a closed small arms range berm. Utilized XRF to direct the investigation

and the real-time remediation.

Drill Pit Investigation, Undisclosed Client, CO: Successful short-notice

preparation for four teams simultaneous collection of different media from

active drill pits in four basins around Colorado for potential use in

Colorado legislation. Additional projects were awarded based on success

with drill pit characterization. These projects included additional

sampling of drill pits and continuous drill mud sampling on an active drill

rig.

Basewide Preliminary Assessment, Buckley Air Force Base, CO: Managed this

project and was responsible for the URS technical and financial

performance. Client satisfaction resulted in URS being tasked with the

follow-up project, the Basewide Site Inspection.

Property Redevelopment Business Line, Business Development Plan Committee,

Denver, CO:

Assisted in developing a new business line for the Denver URS Office.

Contributed to establishing and

implementing a business plan to identify and capture Brownfields

opportunities.

Voluntary Cleanup Program, Colorado Interstate Gas, Table Rock Plant, WY:

Managed a successful semi-annual groundwater sampling program.

Responsibilities include but are not limited to coordinating field teams,

sample management, IDW management, data validation, and collecting

groundwater samples using pumps and bailers.

Quarterly Long Term Monitoring, F. E. Warren Air Force Base, Cheyenne, WY:

Managed a successful quarterly groundwater and surface water sampling

program.

Environmental Stewardship Plan, Triservices Skeet Range, Aurora, CO:

Developed sampling plan and performed project manager duties through

several related projects for the on-base skeet range at Buckley Air Force

Base.

> United States Geological Survey, Lakewood, Colorado September 2000 -

September 2001

Independent Contractor, Analytical Chemist

Contracted with the USGS to prepare and analyze coal and rock samples using

various analytical techniques for chlorine, mercury, and selenium. Prepared

samples for ICP-MS analysis.

EDUCATION and Training

M.S., Inorganic Chemistry, University of Colorado, Denver, Colorado, 2002

B.S., Chemistry, Texas State University, San Marcos, Texas 1997

OSHA 40-Hour HAZWOPER, annual 8-Hour Refresher Courses, 2002 to present

OSHA 8-Hour Site Supervisor Training, 2003

Red Cross First Aid, AED and CPR, 2008

URS Project Manager Courses, 2005

Professional affiliations

American Chemical Society, 1996 - Present

Rocky Mountain Association of Environmental Professionals (RMAEP), 2008 -

Present

RMAEP Board Member, January 2010 - Present

Colorado Hazardous Waste Management Society, 2004 - Present

National Shooting Sports Foundation, 2006 - 2008

REFERENCES

Geoffrey Webb, URS Team Leader. 303-***-****

Dave Cox, URS Project Manager. 303-***-****

Sarah Lave, URS Field Team Member. 303-***-****



Contact this candidate