Post Job Free
Sign in

Project Manager Engineer

Location:
West Chicago, IL, 60185
Posted:
March 09, 2010

Contact this candidate

Resume:

JAY THAKKAR, P. E., LEEDAP, CEM

*** **** *** ******

West Chicago, Illinois 60185

630-***-****

E-mail: abm6h2@r.postjobfree.com

Professional Summary:

Experience in process and HVAC projects design, engineering and management.

Tasks included budgeting, cost estimating, and process development for new

and renovation projects. Expert in plant design development, facility &

physical plant layout, flow diagram, and equipment selection. Used computer

simulation programs, and prepared data sheets, hydraulic & thermodynamic

calculations & piping layouts. Mentored junior staff and prepared packages

for bid and permit, attended plan review meetings, and periodic

construction meetings.

Camp, Dresser, McKee, Inc., Chicago, Illinois

7/08-4/09

*Chicago Public School: Project Engineer. Dual Buildings, Major Mechanical

Renovation: Heating & Ventilating units (1- 100% OA, & 4- recirc.), (2) 250

BHP boilers replaced by (2) 72 BHP, steam CP, BFT replaced with piping

modification, sequence of operation, energy modeling, optimization and

analysis, 60-ton rooftop DX cooling/gas heat makeup air unit & related

equipment, specifications, ductwork, & steam distribution piping. Code

reviewed and presented conceptual design at 30%, preliminary design at 50%,

and final design at 90%/100%. Software used AutoCAD 2008, HAP 4.2, and MS

office.

*NYC-JFK Bldg: Energy modeling for Geothermal and Energy Recovery Units

versus DX cooling units, and prepared feasibility study report.

Legacy Designs, Inc., West Chicago/Rockford, Illinois

2006-2007

*System Design - Commercial facilities, Schools (10-year life safety),

Surveyed mfg plant's office renovations, prepared load calculation (Carrier

HAP 4.02) and specifications, troubleshoot, provided temperature range

schedules, steam and hot water flow diagram analysis and revised for valves

replacement. Mentored junior engineers. Contacted Architectural companies

for Marketing and Business Development.

JDA Engineers, Oak Park, Illinois

2005-2006

*Officiated & reviewed Ventilation and Plumbing Codes (CBC, NFPA, ICC) for

the City of Chicago's Department of Construction and Permit (DCAP)

developers applying for permit. Prepared Vent Cards and reports on city's

Hansen software program.

*Rauner YMCA: Attended CA meetings, prepared construction field report.

Developed specifications and reviewed shop drawings.

*Village of Oak Park Municipal Building: Investigated water efficiency LEED

credits and provided documentation.

HVAC Consultants, Inc. Lombard, Illinois

2002-2004

*HVAC & Process design and Project Management: TARGET Corporate Warehouses

and Offices, Safeguard Self Storage, Multi-family & High-end Condominiums,

Restaurants, Retail, Tenant and Office Spaces design/build. Load

calculation (Carrier HAP 4.02). Prepared material and equipment lists,

budget and cost estimates. Installation details, construction meetings and

commissioning of: Roof-tops, Infra-red heaters, and exhaust fans. Software

used: AutoCAD 2005, Microsoft Excel and Word.

BBA Engineering, Bloomington, Illinois (Contract)

*Normal Comm. Jr. High School, Normal, Ill. Existing plant modification to

CHWS&R/CWS&R, including new 300-ton chiller interconnected with existing

250-ton chiller, (2) 55 BHP Boilers, 100-ton rooftop DX AHU, VAVRH, air-

duct distribution, Mechanical room layout, Pri/Sec piping, and underground

distribution piping system.

*Champaign Armory, Champaign, Illinois: Renovation includes Fan Coil Units,

Piping, and Boilers.

Primera Engineers and Architects, Ltd., Chicago, Illinois

1999-2001

*Project HVAC Engineer: New YMCA Facility, Two-story, 40,000 sq. ft.

Central cooling plant design with option to multiple DX cooling/gas heat

air handling units.

*Project Manager/Engineer: UIC (Bldg. 911), Penthouse HVAC Modifications.

Conceptually prepared Design Development Report, A & MEP coordination,

field survey, reports, and archived as-built documentation. Systems

modifications to final design.

*Several AMERITECH Telecommunication Projects: Complete conceptual to final

design of 300-ton Chiller replacement, analyzed existing cooling tower

condenser water capacity, CHW & CW piping modifications, refrigeration room

purge system exhaust and Genset replacement. Prepared equipment heat-loss

analysis and energy conservation.

*Chicago Housing Authority's buildings renovation including boilers, steam

to hot water converters, and distribution piping.

Sverdrup/Jacobs Facilities, Inc., Chicago, Illinois

1997-1999

*Acquired Certificate of Achievement: General Sanitation Design Course for

food processing projects.

*Denso Vehicle Test Facility, Detroit, MI. Load calculation (Trane Trace

700), 15-ton rooftop DX cooling/gas heat AHU installation details,

construction meetings and commissioning.

*Hoffman-LaRoche Laboratories and Nutra-Sweet Technologies Laboratory

Relocation. Field Survey, designed building HVAC System, lab hoods exhaust

system, steam sterilizer piping, and installation details. Mechanical

Scope, budget hours, proposals, specifications, and checked vendor shop

drawings submittals.

*IRS buildings-Midwest regions, and City of Chicago Pumping Stations:

Surveyed for Y2K Compliance.

Prepared preliminary and final scope of work, reports, and HVAC system

analysis and design.

*Elizabeth Arden Salon, Chanel (High Fashion Retail Store), Several Office

Tenant Spaces in Chicago and Suburbs: Surveyed HVAC systems, designed and

prepared working drawings with AutoCAD-R13, interacted with contractors

through construction phase, checked contractors/vendors shop drawings.

Other Contract Projects:

1991-1997

ASC Services Company, Chicago, Illinois (Formerly a division of Ameritech)

*Ameritech's Telephone Switching Central Offices, Illinois and Wisconsin

Provided HVAC, Fire Protection, and Genset design services, prepared

proposals and bid packages, contract documents, cost estimates and

specifications. Interfaced with contractors during Bid-Walk-Through.

Installation details, construction meetings and commissioning of: Generator

sets up to 2 MW, Fuel piping and Fuel-oil storage tanks, 300-ton chiller,

10-40,000 CFM Air Conditioning Units, and miscellaneous exhaust fans. MS

Excel Spreadsheets and Auto CAD utilized.

Smith Hinchman & Grylls, Inc., Detroit, Michigan

*Chrysler Corporation's New Technology Center and Corporate Headquarter,

Auburn Hills, Michigan

Evaluated existing central plant hot water and chilled water pumping

capacity for 1,000,000 sq. ft. addition: Pressure drop and piping anchor

stress, and expansion calculations, analyses of new piping layout and riser

diagrams for optimization of the systems, equipment selection with computer

software, prepared spreadsheets, specifications and checked CADD

construction documents.

Stanley Consultants, Inc., Muscatine, Iowa

*Ali Al Salem & Ahmed Al Jabber Air Bases, Kuwait. Prepared design manuals

and analyses for Maintenance Training Center, Weapons Tactic Trainer, FA-18

facilities, and Chlorination buildings. Developed specifications with

WordPerfect and computerized spreadsheets for mechanical equipment

schedules interfacing HVAC load calculations (Trane Trace 600), which

resulted in error-free, time saving design by cutting down design time by

40%.

*Loyola University Medical Center (Utilities Piping Tunnel). Performed

design calculations for steam and condensate piping for 2,300 feet long

tunnel and pump rooms. Provided options for direct-buried piping systems.

Prepared spreadsheets, graphs, and reports for presentation to clients on

Quattro-Pro and WordPerfect software.

N A C Associates, Inc., Palatine, Illinois

*American International Hospital, Zion, Illinois. Performed HVAC design for

patient rooms, kitchen ventilation, and exhaust and make-up air systems, as

per IDPH, NFPA, and BOCA codes.

*F & M Store. Designed and retrofitted existing air handling systems.

Changed system layout to meet requirements of new owner.

Klaucens & Associates, Inc., Northbrook, Illinois

*Comdisco (Cooling Tower & Air Handling Units). Prepared building load

calculations (Carrier E20-II), proposed design changes, and selected

equipment. Inspected site to examine air handling systems and condenser

water piping. Interacted with subcontractor for chemical water treatment.

*HVAC Design for Health Care Facilities at Highland Park Hospital, Highland

Park, Illinois; Evanston Hospital, Evanston, Illinois; Lutheran General

Hospital, Park Ridge, Illinois; and American International Hospital, Zion,

Illinois. Performed HVAC design for patient rooms, emergency generator

room, as per IDPH, NFPA, and BOCA codes. Renovated steam distribution, heat

exchangers, condensate, chilled/hot water systems, medical gas piping

system, and laboratory ventilation systems.

*Sara-Lee Bakery. Renovated plant's HVAC systems. Assessed boiler capacity

and surveyed old facility for equipment relocation.

*Surveyed Bagel Factory's physical plant for renovation: Air Handling

Units, Make-up Air Units, Exhaust Fans, and duct distribution.

Additional Contract Projects:

Ragnar Benson, Inc., Park Ridge, Illinois

*Designed warehouse and office area air handling systems and fire

protection piping layout for Ameritech and General Mills.

*Electronics Data Systems (Computer Rooms). Assessed existing air handling

equipment, installation details and layout of new equipment.

Lester B. Knight Architects and Engineers, Inc., Chicago, Illinois

*McCormick Place Expansion Facility. Performed load calculations, designed

chilled and hot water and air distribution systems, prepared flow diagrams

and made heat transfer calculations for snow melting systems. Surveyed site

for new chiller installation.

Austin Company, Des Plaines, Illinois

*Upjohn Laboratories Research Building. HVAC Design.

*Abbott Laboratories, North Chicago, Illinois

Research Laboratory Building. Performed HVAC calculations for air

distribution and make-up air layout for laboratory rooms.

Skidmore Owings & Merrill, Inc., Chicago, Illinois

*Chicago Tribune Building. Designed air and chilled water systems.

*One Magnificent Mile Bldg. Designed exhaust ductwork layout for commercial

and residential spaces.

In addition to these, completed several other projects in Southern Illinois

since 1976. For example: Springfield Housing Authority's water piping for

57 buildings complex; Crawford, Murphy & Tilly's new office building; and

Computer rooms in State of Illinois office building.

EDUCATION: 1975, B. S. in Mechanical Engineering, Chicago Technical

College, Chicago, Illinois

1983, Diploma in Computer Programming, Roosevelt University (Formerly,

Computer Learning Center)

2006, Leadership in Energy and Environmental Design Accredited Professional

(LEEDAP).

REGISTRATION: Licensed Professional Engineer

(State of Illinois, State of Wisconsin, and Registration Record with

National Council of Examiners for Engineering and Surveying - (NCEES)).

2009, Certified Energy Manager (Association of Energy Engineers)

Registered Energy Professional (REP) with City of Chicago.

AFFILIATION: Member since 1983, American Society of Heating, Refrigerating

and Air-Conditioning Engineers. (ASHRAE).

Volunteer in community services. Enjoy playing chess.

REFERENCES: Will be furnished upon request.



Contact this candidate